Lead Project: 062-04-0031
Parish: PLAQUEMINES
Routes: LA 23
Description: LA 23 (WEST POINT-A-LA-HACHE TO C.S.L.M. 4.77)
Type Const: cold planing asphaltic pavement, superpave asphaltic concrete pavement, pavement
patching and related work.
Estimated Construction Cost: $3,313,027.89
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC $3,487,516.00
2 02179 BOH BROS. CONSTRUCTION CO., LLC. $4,416,958.20
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 101      LNFT 30.00 3,030.00 10.00 1,010.00        
203-07 borrow (vehicular measurement) 600      CUYD 50.00 30,000.00 50.00 30,000.00        
502-01 superpave asphaltic concrete 30,448.5    TON 76.00 2,314,086.00 94.00 2,862,159.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
80.8    TON 150.00 12,120.00 200.00 16,160.00        
509-01 cold planing asphaltic pavement 125,317      SQYD 2.00 250,634.00 3.00 375,951.00        
509-02 contractor retained reclaimed asphaltic pavement - 5,222      CUYD 10.00 - 52,220.00 2.00 - 10,444.00        
510-01-A pavement patching (6" minimum thickness) 496      SQYD 60.00 29,760.00 70.00 34,720.00        
510-01-B pavement patching (12" minimum thickness) 2,500      SQYD 75.00 187,500.00 120.00 300,000.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 150.0    LNFT 40.00 6,000.00 44.00 6,600.00        
704-03 blocked out guard rail 12.5    LNFT 42.00 525.00 19.00 237.50        
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
6.3    LNFT 140.00 882.00 85.00 535.50        
704-11-A guard rail end treatment (flared) 1      EACH 3,000.00 3,000.00 2,400.00 2,400.00        
713-01 temporary signs & barricades lump      LUMP 225,000.00 225,000.00 170,000.00 170,000.00        
713-02-C temporary pavement markings (8" width) 944      LNFT 0.50 472.00 0.40 377.60        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
19.080  MILE 150.00 2,862.00 600.00 11,448.00        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
19.080  MILE 475.00 9,063.00 470.00 8,967.60        
713-04-A temporary pavement markings (solid line)(4" width) 38.160  MILE 750.00 28,620.00 700.00 26,712.00        
713-05-A temporary pavement legends and symbols (arrow) 10      EACH 45.00 450.00 44.00 440.00        
713-05-C temporary pavement legends and symbols (only) 10      EACH 50.00 500.00 50.00 500.00        
727-01 mobilization lump      LUMP 300,000.00 300,000.00 400,000.00 400,000.00        
729-16-C object marker assembly (type 3) 2      EACH 80.00 160.00 100.00 200.00        
731-02 reflectorized raised pavement markers 1,355      EACH 6.00 8,130.00 6.00 8,130.00        
732-01-C plastic pavement striping (8" width) 472      LNFT 1.00 472.00 1.00 472.00        
732-02-A plastic pavement striping (solid line) (4" width) 19.080  MILE 3,000.00 57,240.00 2,800.00 53,424.00        
732-03-A plastic pavement striping (broken line)(4" width) 9.540  MILE 850.00 8,109.00 800.00 7,632.00        
732-04-A plastic pavement legends & symbols (arrow) 5      EACH 200.00 1,000.00 100.00 500.00        
732-04-C plastic pavement legends & symbols (only) 5      EACH 275.00 1,375.00 200.00 1,000.00        
740-01 construction layout lump      LUMP 20,000.00 20,000.00 15,000.00 15,000.00        
S-001 cleaning existing culverts (18" to 36") 4,530      LNFT 6.00 27,180.00 5.00 22,650.00        
S-002 rumble strips (ground-in) 16.9    MILE 550.00 9,295.00 1,200.00 20,280.00        
S-003 saw cutting asphaltic concrete patches (6" deep) 768      LNFT 0.50 384.00 6.00 4,608.00        
S-004 saw cutting asphaltic concrete patches (12" deep) 3,774      LNFT 0.50 1,887.00 12.00 45,288.00        
                       
 CONTRACTOR TOTAL       3,487,516.00   4,416,958.20        