Letting of 12/05/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 022-03-0047
Parish: WINN
Routes: US 84
Description: PINEY WOODS CR. - LASALLE PARISH
Type Const: scarifying, surface preparation, asphlatic surface treatment, pavement patching,
superpave asphaltic concrete pavement, and related work.
Estimated Construction Cost: $2,403,401.01
 
RankLicenseBidderConstruction Bid
1 05789 D & J CONSTRUCTION CO., INC. $2,355,263.92
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,668,864.79
3 12312 GILCHRIST CONSTRUCTION CO. LLC $2,689,475.13
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
306-02-A scarifying and compacting roadbed (6" thick) 69,393      SQYD 1.30 90,210.90 0.75 52,044.75 2.00 138,786.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
6,000      CUYD 32.00 192,000.00 76.00 456,000.00 90.00 540,000.00    
502-01 superpave asphaltic concrete 15,950.2    TON 85.00 1,355,767.00 81.41 1,298,505.78 75.00 1,196,265.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
280.1    TON 155.00 43,415.50 185.00 51,818.50 175.00 49,017.50    
507-01-A asphaltic material (crs-2p cold applied emulsion) 70,783      GAL 2.35 166,340.05 2.25 159,261.75 2.50 176,957.50    
507-02-B aggregate (s2) 104,093      SQYD 1.11 115,543.23 1.10 114,502.30 0.90 93,683.70    
507-02-C aggregate (s3) 104,093      SQYD 1.05 109,297.65 1.00 104,093.00 0.90 93,683.70    
509-01 cold planing asphaltic pavement 800      SQYD 11.00 8,800.00 15.00 12,000.00 9.00 7,200.00    
509-02 contractor retained reclaimed asphaltic pavement - 30      CUYD 0.01 - 0.30 0.10 - 3.00 0.01 - 0.30    
510-01-B pavement patching (12" minimum thickness) 800      SQYD 105.00 84,000.00 90.00 72,000.00 80.00 64,000.00    
713-01 temporary signs & barricades lump      LUMP 22,000.00 22,000.00 15,000.00 15,000.00 45,000.00 45,000.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
7.635  MILE 180.00 1,374.30 150.00 1,145.25 350.00 2,672.25    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
7.228  MILE 300.00 2,168.40 275.00 1,987.70 1.00 7.23    
713-04-A temporary pavement markings (solid line)(4" width) 22.648  MILE 1.00 22.65 550.00 12,456.40 1.00 22.65    
713-06-A temporary reflectorized raised pavement markers (tabs) 3,904      EACH 1.51 5,895.04 1.50 5,856.00 1.20 4,684.80    
716-01-B mulch (fiber) 15.5    TON 650.00 10,075.00 520.00 8,060.00 530.00 8,215.00    
717-01 seeding 466      LB 10.00 4,660.00 7.50 3,495.00 7.75 3,611.50    
718-01 fertilizer 15,544      LB 0.35 5,440.40 0.39 6,062.16 0.40 6,217.60    
727-01 mobilization lump      LUMP 45,000.00 45,000.00 138,000.00 138,000.00 110,000.00 110,000.00    
731-02 reflectorized raised pavement markers 976      EACH 7.00 6,832.00 5.00 4,880.00 5.75 5,612.00    
732-02-A plastic pavement striping (solid line) (4" width) 18.234  MILE 2,150.00 39,203.10 2,300.00 41,938.20 2,300.00 41,938.20    
732-03-A plastic pavement striping (broken line)(4" width) 6.744  MILE 1,000.00 6,744.00 750.00 5,058.00 700.00 4,720.80    
735-01 mailboxes 3      EACH 5.00 15.00 1.00 3.00 100.00 300.00    
735-02 mailbox supports (single) 3      EACH 500.00 1,500.00 500.00 1,500.00 600.00 1,800.00    
740-01 construction layout lump      LUMP 9,000.00 9,000.00 6,000.00 6,000.00 15,000.00 15,000.00    
S-001 surface preparation lump      LUMP 17,000.00 17,000.00 90,000.00 90,000.00 70,000.00 70,000.00    
S-002 saw cutting 14,400      inft 0.90 12,960.00 0.50 7,200.00 0.70 10,080.00    
                       
 CONTRACTOR TOTAL       2,355,263.92   2,668,864.79   2,689,475.13    