| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BENTON & BROWN, LLC. |
- 2 - BEST-YET BUILDERS, LLC |
- 3 - MADDEN CONTRACTING CO., INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-I |
removal of culvert pipe
|
12   |
LNFT |
50.00 |
600.00 |
60.00 |
720.00 |
30.00 |
360.00 |
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
40,000.00 |
40,000.00 |
50,000.00 |
50,000.00 |
24,000.00 |
24,000.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
4,500   |
CUYD |
17.00 |
76,500.00 |
12.00 |
54,000.00 |
14.50 |
65,250.00 |
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
30,078   |
SQYD |
8.55 |
257,166.90 |
8.00 |
240,624.00 |
8.40 |
252,655.20 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
115   |
CUYD |
50.00 |
5,750.00 |
45.00 |
5,175.00 |
46.00 |
5,290.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
13,553.4 |
TON |
75.00 |
1,016,505.00 |
75.00 |
1,016,505.00 |
81.00 |
1,097,825.40 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,082.0 |
TON |
80.00 |
86,560.00 |
100.00 |
108,200.00 |
50.00 |
54,100.00 |
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
12,574   |
GAL |
3.35 |
42,122.90 |
3.19 |
40,111.06 |
3.70 |
46,523.80 |
|
|
| 507-02-B |
aggregate (s2)
|
30,669   |
SQYD |
1.65 |
50,603.85 |
1.60 |
49,070.40 |
1.85 |
56,737.65 |
|
|
| 509-01-A |
cold planing asphaltic pavement(1/2" avg depth)
|
23,536   |
SQYD |
1.50 |
35,304.00 |
1.50 |
35,304.00 |
2.00 |
47,072.00 |
|
|
| 509-01-B |
cold planing asphaltic pavement(2" avg depth)
|
24,553   |
SQYD |
1.75 |
42,967.75 |
1.50 |
36,829.50 |
2.00 |
49,106.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 425   |
CUYD |
0.90 |
- 382.50 |
0.10 |
- 42.50 |
1.00 |
- 425.00 |
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
450   |
SQYD |
50.00 |
22,500.00 |
65.00 |
29,250.00 |
60.00 |
27,000.00 |
|
|
| 701-08 |
relaying pipe
|
18   |
LNFT |
90.00 |
1,620.00 |
200.00 |
3,600.00 |
150.00 |
2,700.00 |
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
18   |
LNFT |
175.00 |
3,150.00 |
60.00 |
1,080.00 |
180.00 |
3,240.00 |
|
|
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
16   |
LNFT |
200.00 |
3,200.00 |
72.00 |
1,152.00 |
200.00 |
3,200.00 |
|
|
| 701-10-N |
reinforced concrete pipe (extension)(42")
|
6   |
LNFT |
400.00 |
2,400.00 |
84.00 |
504.00 |
250.00 |
1,500.00 |
|
|
| 701-12-G |
corrugated metal pipe (extension)(18")
|
12   |
LNFT |
160.00 |
1,920.00 |
47.00 |
564.00 |
160.00 |
1,920.00 |
|
|
| 701-15 |
concrete collar
|
8   |
EACH |
1,250.00 |
10,000.00 |
1,000.00 |
8,000.00 |
800.00 |
6,400.00 |
|
|
| 712-03 |
stone revetment
|
280   |
SQYD |
60.00 |
16,800.00 |
60.00 |
16,800.00 |
85.00 |
23,800.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
65,000.00 |
65,000.00 |
50,000.00 |
50,000.00 |
126,500.00 |
126,500.00 |
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
90   |
LNFT |
1.00 |
90.00 |
1.00 |
90.00 |
0.10 |
9.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
14.398 |
MILE |
350.00 |
5,039.30 |
500.00 |
7,199.00 |
400.00 |
5,759.20 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.231 |
MILE |
375.00 |
1,211.63 |
178.75 |
577.54 |
1.00 |
3.23 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
23.553 |
MILE |
500.00 |
11,776.50 |
233.75 |
5,505.51 |
1.00 |
23.55 |
|
|
| 713-06-A |
temporary reflectorized raised pavement markers
|
1,903   |
EACH |
1.50 |
2,854.50 |
1.32 |
2,511.96 |
5.10 |
9,705.30 |
|
|
| 716-01-A |
mulch (vegetative)
|
5.2 |
TON |
750.00 |
3,900.00 |
450.00 |
2,340.00 |
1,200.00 |
6,240.00 |
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
7,500.00 |
7,500.00 |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
50,000.00 |
50,000.00 |
100,000.00 |
100,000.00 |
126,500.00 |
126,500.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
545   |
EACH |
5.85 |
3,188.25 |
5.65 |
3,079.25 |
5.10 |
2,779.50 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
30   |
LNFT |
3.05 |
91.50 |
2.92 |
87.60 |
2.65 |
79.50 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.150 |
MILE |
2,475.00 |
17,696.25 |
2,365.00 |
16,909.75 |
2,150.00 |
15,372.50 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.923 |
MILE |
745.00 |
687.64 |
715.00 |
659.95 |
650.00 |
599.95 |
|
|
| 735-01 |
mailboxes
|
7   |
EACH |
85.00 |
595.00 |
100.00 |
700.00 |
1.00 |
7.00 |
|
|
| 735-01-A |
mailboxes (oversized)
|
2   |
EACH |
85.00 |
170.00 |
100.00 |
200.00 |
10.00 |
20.00 |
|
|
| 735-02 |
mailbox supports (single)
|
7   |
EACH |
145.00 |
1,015.00 |
100.00 |
700.00 |
195.00 |
1,365.00 |
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
200.00 |
200.00 |
100.00 |
100.00 |
225.00 |
225.00 |
|
|
| 739-01 |
hydro-seeding
|
9.96 |
ACRE |
1,800.00 |
17,928.00 |
1,540.00 |
15,338.40 |
1,200.00 |
11,952.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
50,000.00 |
50,000.00 |
20,000.00 |
20,000.00 |
|
|
| S-001 |
saw cutting concrete drives (4" depth)
|
40   |
LNFT |
10.00 |
400.00 |
50.00 |
2,000.00 |
25.00 |
1,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,924,631.47 |
|
1,965,445.42 |
|
2,111,395.78 |
|
|
|