| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COVINGTON PAVING CO. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 4 - BOH BROS. CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
4,500.00 |
4,500.00 |
11,000.00 |
11,000.00 |
6,000.00 |
6,000.00 |
2,000.00 |
2,000.00 |
| 202-02-H |
removal of guard rail
|
416   |
LNFT |
4.00 |
1,664.00 |
4.00 |
1,664.00 |
12.00 |
4,992.00 |
4.50 |
1,872.00 |
| 203-07 |
borrow (vehicular measurement)
|
2,165   |
CUYD |
9.44 |
20,437.60 |
6.00 |
12,990.00 |
21.00 |
45,465.00 |
20.00 |
43,300.00 |
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
6,261   |
CUYD |
9.44 |
59,103.84 |
6.00 |
37,566.00 |
15.00 |
93,915.00 |
20.00 |
125,220.00 |
| 204-02 |
temporary hay or straw bales
|
170   |
EACH |
9.00 |
1,530.00 |
12.00 |
2,040.00 |
10.00 |
1,700.00 |
10.00 |
1,700.00 |
| 204-06 |
temporary silt fencing
|
620   |
LNFT |
2.15 |
1,333.00 |
3.20 |
1,984.00 |
3.00 |
1,860.00 |
3.50 |
2,170.00 |
| 303-02 |
removal of existing patches
|
2,874   |
SQYD |
FREE |
FREE |
0.55 |
1,580.70 |
6.00 |
17,244.00 |
10.00 |
28,740.00 |
| 308-01-A |
in-place cement treated base course (12" thick)
|
145,776   |
SQYD |
4.12 |
600,597.12 |
5.20 |
758,035.20 |
5.90 |
860,078.40 |
7.00 |
1,020,432.00 |
| 502-01 |
superpave asphaltic concrete
|
27,022.5 |
TON |
67.00 |
1,810,507.50 |
60.00 |
1,621,350.00 |
67.00 |
1,810,507.50 |
80.00 |
2,161,800.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,275.9 |
TON |
80.00 |
102,072.00 |
10.00 |
12,759.00 |
145.00 |
185,005.50 |
150.00 |
191,385.00 |
| 509-01 |
cold planing asphaltic pavement
|
44,622   |
SQYD |
1.25 |
55,777.50 |
1.80 |
80,319.60 |
1.30 |
58,008.60 |
1.50 |
66,933.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,859   |
CUYD |
3.00 |
- 5,577.00 |
5.00 |
- 9,295.00 |
0.10 |
- 185.90 |
10.00 |
- 18,590.00 |
| 701-02-E |
cross drain pipe arch (30" equiv. rcpa)
|
100   |
LNFT |
154.00 |
15,400.00 |
180.00 |
18,000.00 |
175.00 |
17,500.00 |
170.00 |
17,000.00 |
| 701-02-H |
cross drain pipe arch (48" equiv. rcpa)
|
76   |
LNFT |
271.00 |
20,596.00 |
280.00 |
21,280.00 |
300.00 |
22,800.00 |
280.00 |
21,280.00 |
| 701-02-I |
cross drain pipe arch (54" equiv. rcpa)
|
64   |
LNFT |
340.00 |
21,760.00 |
370.00 |
23,680.00 |
400.00 |
25,600.00 |
300.00 |
19,200.00 |
| 701-08 |
relaying pipe
|
16   |
LNFT |
110.00 |
1,760.00 |
140.00 |
2,240.00 |
110.00 |
1,760.00 |
100.00 |
1,600.00 |
| 704-03 |
blocked out guard rail
|
150.0 |
LNFT |
24.00 |
3,600.00 |
25.00 |
3,750.00 |
25.00 |
3,750.00 |
25.00 |
3,750.00 |
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
50.0 |
LNFT |
48.00 |
2,400.00 |
50.00 |
2,500.00 |
50.00 |
2,500.00 |
50.00 |
2,500.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
55.00 |
5,500.00 |
56.00 |
5,600.00 |
60.00 |
6,000.00 |
60.00 |
6,000.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,200.00 |
8,800.00 |
2,300.00 |
9,200.00 |
2,400.00 |
9,600.00 |
2,400.00 |
9,600.00 |
| 707-04 |
asphaltic curb
|
40.0 |
LNFT |
50.00 |
2,000.00 |
70.00 |
2,800.00 |
50.00 |
2,000.00 |
25.00 |
1,000.00 |
| 711-03-C |
riprap (30 lb)
|
121.0 |
TON |
83.00 |
10,043.00 |
120.00 |
14,520.00 |
80.00 |
9,680.00 |
80.00 |
9,680.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
17,900.00 |
17,900.00 |
60,000.00 |
60,000.00 |
22,000.00 |
22,000.00 |
35,000.00 |
35,000.00 |
| 713-02-E |
temporary pavement markings (24" width)
|
78   |
LNFT |
FREE |
FREE |
1.00 |
78.00 |
0.70 |
54.60 |
1.00 |
78.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
28.740 |
MILE |
250.00 |
7,185.00 |
30.00 |
862.20 |
130.00 |
3,736.20 |
10.00 |
287.40 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
21.030 |
MILE |
1.00 |
21.03 |
40.00 |
841.20 |
295.00 |
6,203.85 |
15.00 |
315.45 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
83.520 |
MILE |
1.00 |
83.52 |
50.00 |
4,176.00 |
525.00 |
43,848.00 |
20.00 |
1,670.40 |
| 720-01-A |
erosion control system, slope protection (type a)
|
500   |
SQYD |
1.27 |
635.00 |
2.80 |
1,400.00 |
2.75 |
1,375.00 |
3.00 |
1,500.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
1,000.00 |
1,000.00 |
500.00 |
500.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
| 726-01 |
bedding material
|
64.6 |
CUYD |
83.00 |
5,361.80 |
80.00 |
5,168.00 |
80.00 |
5,168.00 |
100.00 |
6,460.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
60,400.00 |
60,400.00 |
200,000.00 |
200,000.00 |
195,000.00 |
195,000.00 |
300,000.00 |
300,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
76   |
EACH |
60.00 |
4,560.00 |
67.00 |
5,092.00 |
65.00 |
4,940.00 |
65.00 |
4,940.00 |
| 731-02 |
reflectorized raised pavement markers
|
1,269   |
EACH |
4.50 |
5,710.50 |
5.20 |
6,598.80 |
5.00 |
6,345.00 |
5.50 |
6,979.50 |
| 732-01-E |
plastic pavement striping (24" width)
|
26   |
LNFT |
3.00 |
78.00 |
7.00 |
182.00 |
3.25 |
84.50 |
3.25 |
84.50 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
27.840 |
MILE |
2,150.00 |
59,856.00 |
2,500.00 |
69,600.00 |
2,250.00 |
62,640.00 |
2,500.00 |
69,600.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
7.010 |
MILE |
700.00 |
4,907.00 |
700.00 |
4,907.00 |
750.00 |
5,257.50 |
650.00 |
4,556.50 |
| 735-01 |
mailboxes
|
82   |
EACH |
10.00 |
820.00 |
5.00 |
410.00 |
1.00 |
82.00 |
1.00 |
82.00 |
| 735-02 |
mailbox supports (single)
|
82   |
EACH |
125.00 |
10,250.00 |
120.00 |
9,840.00 |
120.00 |
9,840.00 |
110.00 |
9,020.00 |
| 739-01 |
hydro-seeding
|
11.10 |
ACRE |
1,050.00 |
11,655.00 |
1,000.00 |
11,100.00 |
1,100.00 |
12,210.00 |
1,000.00 |
11,100.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
35,000.00 |
35,000.00 |
21,500.00 |
21,500.00 |
15,000.00 |
15,000.00 |
| S-001 |
sawcutting of concrete/asphalt driveways and turnouts
(full depth) |
1,340   |
LNFT |
FREE |
FREE |
4.00 |
5,360.00 |
4.00 |
5,360.00 |
6.00 |
8,040.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,954,227.41 |
|
3,056,678.70 |
|
3,601,424.75 |
|
4,198,285.75 |
|