| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - BENTON & BROWN, LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
55   |
SQYD |
10.00 |
550.00 |
80.00 |
4,400.00 |
|
|
|
|
| 202-02-I |
removal of asphaltic surfacing
|
1,462   |
SQYD |
8.00 |
11,696.00 |
11.50 |
16,813.00 |
|
|
|
|
| 202-02-J |
removal of culvert pipe
|
68   |
LNFT |
10.00 |
680.00 |
10.00 |
680.00 |
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
80,000.00 |
80,000.00 |
29,000.00 |
29,000.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
12,500   |
CUYD |
1.00 |
12,500.00 |
14.00 |
175,000.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
400   |
CUYD |
15.00 |
6,000.00 |
70.00 |
28,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
26,933.5 |
TON |
75.50 |
2,033,479.25 |
70.00 |
1,885,345.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,500.0 |
TON |
40.00 |
100,000.00 |
75.00 |
187,500.00 |
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
650   |
SQYD |
60.00 |
39,000.00 |
40.00 |
26,000.00 |
|
|
|
|
| 701-08 |
relaying pipe
|
12   |
LNFT |
130.00 |
1,560.00 |
145.00 |
1,740.00 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
26   |
LNFT |
160.00 |
4,160.00 |
120.00 |
3,120.00 |
|
|
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
8   |
LNFT |
180.00 |
1,440.00 |
165.00 |
1,320.00 |
|
|
|
|
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
36   |
LNFT |
200.00 |
7,200.00 |
185.00 |
6,660.00 |
|
|
|
|
| 701-15 |
concrete collar
|
10   |
EACH |
700.00 |
7,000.00 |
950.00 |
9,500.00 |
|
|
|
|
| 712-02 |
sacked concrete revetment
|
100   |
SQYD |
70.00 |
7,000.00 |
72.00 |
7,200.00 |
|
|
|
|
| 712-04 |
flexible revetment
|
300   |
SQYD |
70.00 |
21,000.00 |
72.00 |
21,600.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
118,200.00 |
118,200.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
26   |
LNFT |
0.10 |
2.60 |
1.00 |
26.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
17.180 |
MILE |
325.00 |
5,583.50 |
345.00 |
5,927.10 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.724 |
MILE |
1.00 |
5.72 |
325.00 |
1,860.30 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
62.692 |
MILE |
1.00 |
62.69 |
465.00 |
29,151.78 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
21.0 |
TON |
1,200.00 |
25,200.00 |
800.00 |
16,800.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
118,200.00 |
118,200.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
14   |
EACH |
100.00 |
1,400.00 |
65.00 |
910.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,134   |
EACH |
4.90 |
5,556.60 |
5.40 |
6,123.60 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
13   |
LNFT |
2.75 |
35.75 |
3.00 |
39.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
31.346 |
MILE |
2,150.00 |
67,393.90 |
2,365.00 |
74,133.29 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.862 |
MILE |
510.00 |
1,459.62 |
560.00 |
1,602.72 |
|
|
|
|
| 735-01 |
mailboxes
|
55   |
EACH |
1.00 |
55.00 |
1.10 |
60.50 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
43   |
EACH |
125.00 |
5,375.00 |
135.00 |
5,805.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
6   |
EACH |
175.00 |
1,050.00 |
190.00 |
1,140.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
21.00 |
ACRE |
1,200.00 |
25,200.00 |
1,500.00 |
31,500.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
29,000.00 |
29,000.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
5.16 |
CUYD |
1,000.00 |
5,160.00 |
1,400.00 |
7,224.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
218   |
LB |
2.50 |
545.00 |
4.00 |
872.00 |
|
|
|
|
| S-001 |
saw cutting concrete drives
|
207   |
LNFT |
9.00 |
1,863.00 |
13.00 |
2,691.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,730,613.63 |
|
2,768,744.29 |
|
|
|
|
|