Letting of 11/14/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 069-01-0016
Parish: LINCOLN
Routes: LA 33
Description: JCT. I-20 - LA 821
Type Const: grading, drainage structures, class ii base course, s'pave asphaltic concrete, portland
cement concrete pavement, lime treatment, pvmt patching and related work.
Estimated Construction Cost: $16,815,116.55
 
RankLicenseBidderConstruction Bid
1 34567 JAMES CONSTRUCTION GROUP LLC $16,885,359.89
2 39462 DENTON-JAMES LLC $16,955,910.80
3 15099 AMETHYST CONSTRUCTION, INC. $17,889,027.99
4 12312 GILCHRIST CONSTRUCTION CO. LLC $19,898,077.55
5 38936 SOUTHERN INDUSTRIAL CONTRACTORS LLC $21,334,194.10
 
Item Number Item Description Quantity Unit of Measure - 1 -
JAMES CONSTRUCTION GROUP LLC
- 2 -
DENTON-JAMES LLC
- 3 -
AMETHYST CONSTRUCTION, INC.
- 4 -
GILCHRIST CONSTRUCTION CO. LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 180,000.00 180,000.00 820,000.00 820,000.00 400,000.00 400,000.00 800,000.00 800,000.00
202-01 removal of structures & obstructions lump      lump 35,000.00 35,000.00 115,000.00 115,000.00 270,000.00 270,000.00 80,000.00 80,000.00
202-02-B-01 removal of concrete box culverts(sta.1+275.85;
0.61mx1.69mx21.92m)
1      ea 1.00 1.00 12,000.00 12,000.00 1.00 1.00 4,000.00 4,000.00
202-02-B-02 removal of concrete box culverts(sta.2+628.42;
0.61mx0.61mx16.35m)
1      ea 5,000.00 5,000.00 12,000.00 12,000.00 3,000.00 3,000.00 4,000.00 4,000.00
202-02-B-03 removal of concrete box culverts(sta.3+059.92;
2.44mx2.44mx23.94m)
1      ea 7,000.00 7,000.00 25,000.00 25,000.00 15,000.00 15,000.00 15,000.00 15,000.00
202-02-B-04 removal of concrete box culverts(sta.3+182.07;
1.22mx0.85mx27.29m)
1      ea 1.00 1.00 10,000.00 10,000.00 1.00 1.00 4,000.00 4,000.00
202-02-B-05 removal of concrete box culverts(sta.3+440.01;
1.40mx1.31mx24.22m)
1      ea 7,000.00 7,000.00 25,000.00 25,000.00 4,000.00 4,000.00 10,000.00 10,000.00
202-02-B-06 removal of concrete box culverts(sta.3+798.66;
0.61mx0.61mx16.37m)
1      ea 3,000.00 3,000.00 10,000.00 10,000.00 3,000.00 3,000.00 4,000.00 4,000.00
202-02-B-07 removal of concrete box culverts(sta.4+427.27;
0.61mx0.61mx16.02m)
1      ea 3,000.00 3,000.00 10,000.00 10,000.00 3,000.00 3,000.00 4,000.00 4,000.00
202-02-B-08 removal of concrete box culverts(sta.4+884.47;
1.22mx.92mx26.72m)
1      ea 3,000.00 3,000.00 10,000.00 10,000.00 5,000.00 5,000.00 4,000.00 4,000.00
202-02-D removal of concrete walks & drives 9,177      sq m 5.00 45,885.00 10.00 91,770.00 6.00 55,062.00 8.50 78,004.50
202-02-F removal of concrete combination curb & gutter 430.6    ln m 15.00 6,459.00 24.00 10,334.40 24.00 10,334.40 25.00 10,765.00
202-02-G removal of surfacing & stabilized base 44,028.1    sq m 8.00 352,224.80 4.00 176,112.40 7.00 308,196.70 4.40 193,723.64
202-02-H removal of guard rail 120      ln m 10.00 1,200.00 16.00 1,920.00 10.00 1,200.00 16.00 1,920.00
202-02-I removal of existing traffic signal equipment lump      lump 5,000.00 5,000.00 5,000.00 5,000.00 5,500.00 5,500.00 9,500.00 9,500.00
203-01 general excavation (plan quantity measurement) 38,764      cu m 20.00 775,280.00 13.00 503,932.00 14.00 542,696.00 19.00 736,516.00
203-02 drainage excavation (plan quantity measurement) 415      cu m 20.00 8,300.00 35.00 14,525.00 14.00 5,810.00 35.00 14,525.00
203-03 embankment(plan quantity measurement) 19,098      cu m 25.00 477,450.00 35.00 668,430.00 18.00 343,764.00 30.00 572,940.00
204-02 temporary hay or straw bales 196      ea 20.00 3,920.00 9.00 1,764.00 15.00 2,940.00 18.00 3,528.00
204-05-A temporary sediment check dams (hay) 208      ea 175.00 36,400.00 125.00 26,000.00 200.00 41,600.00 170.00 35,360.00
204-06 temporary silt fencing 9,080      ln m 8.00 72,640.00 5.00 45,400.00 6.60 59,928.00 5.00 45,400.00
302-02-E class ii base course (250 mm thick) 80,390.9    sq m 25.00 2,009,772.50 24.00 1,929,381.60 24.50 1,969,577.05 27.50 2,210,749.75
302-02-F class ii base course (300 mm thick) 7,419.0    sq m 30.00 222,570.00 36.00 267,084.00 28.00 207,732.00 32.00 237,408.00
304-01 lime 607.82   Mg 150.00 91,173.00 130.00 79,016.60 157.00 95,427.74 158.00 96,035.56
304-04-D lime treatment (type d) (300 mm thick) 40,200      sq m 2.00 80,400.00 2.00 80,400.00 5.00 201,000.00 2.45 98,490.00
402-01 traffic maintenance aggregate (vehicular measurement) 5,000.0    cu m 80.00 400,000.00 80.00 400,000.00 65.00 325,000.00 90.00 450,000.00
502-01 superpave asphaltic concrete 2,436.3    Mg 150.00 365,445.00 155.00 377,626.50 180.00 438,534.00 124.00 302,101.20
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
158.4    Mg 279.19 44,223.70 290.00 45,936.00 250.00 39,600.00 180.00 28,512.00
601-01-G portland cement concrete pavement (200 mm thick) 74,400.0    sq m 53.00 3,943,200.00 50.00 3,720,000.00 70.00 5,208,000.00 63.00 4,687,200.00
601-02-G portland cement concrete pavement (200 mm thick)
(crossovers & turnouts)
3,604.1    sq m 100.00 360,410.00 65.00 234,266.50 76.00 273,911.60 88.00 317,160.80
601-04 portland cement concrete pavement coring 105      ea 100.00 10,500.00 100.00 10,500.00 150.00 15,750.00 100.00 10,500.00
602-05 full depth patching of jointed concrete pavement 126.0    sq m 400.00 50,400.00 250.00 31,500.00 372.00 46,872.00 180.00 22,680.00
701-01-K cross drain pipe (750 mm rcp/pcp) 149.0    ln m 390.00 58,110.00 360.00 53,640.00 260.00 38,740.00 420.00 62,580.00
701-01-M cross drain pipe (900 mm rcp/pcp) 34.0    ln m 620.00 21,080.00 580.00 19,720.00 390.00 13,260.00 520.00 17,680.00
701-01-O cross drain pipe (1200 mm rcp/pcp) 30.0    ln m 770.00 23,100.00 1,000.00 30,000.00 550.00 16,500.00 740.00 22,200.00
701-01-S cross drain pipe (1800 mm rcp/pcp) 38.0    ln m 770.00 29,260.00 1,600.00 60,800.00 1,300.00 49,400.00 1,400.00 53,200.00
701-03-F storm drain pipe (375 mm rcp/pcp) 4,729.0    ln m 240.00 1,134,960.00 200.00 945,800.00 155.00 732,995.00 230.00 1,087,670.00
701-03-G storm drain pipe (450 mm rcp/pcp) 468.0    ln m 270.00 126,360.00 210.00 98,280.00 170.00 79,560.00 235.00 109,980.00
701-03-I storm drain pipe (600 mm rcp/pcp) 139.0    ln m 320.00 44,480.00 280.00 38,920.00 200.00 27,800.00 290.00 40,310.00
701-03-M storm drain pipe (900 mm rcp/pcp) 143.0    ln m 460.00 65,780.00 370.00 52,910.00 360.00 51,480.00 465.00 66,495.00
701-04-G storm drain pipe arch (1050 mm equiv. rcpa) 70.0    ln m 600.00 42,000.00 470.00 32,900.00 490.00 34,300.00 585.00 40,950.00
701-05-G side drain pipe (450 mm) 35.2    ln m 220.00 7,744.00 190.00 6,688.00 200.00 7,040.00 200.00 7,040.00
702-02-B manholes (r-cb-11) 15      ea 5,700.00 85,500.00 4,500.00 67,500.00 6,200.00 93,000.00 7,000.00 105,000.00
702-03-A catch basins (cb-01) 34      ea 3,500.00 119,000.00 2,400.00 81,600.00 3,000.00 102,000.00 2,300.00 78,200.00
702-03-C catch basins (cb-06) 54      ea 4,500.00 243,000.00 3,600.00 194,400.00 4,200.00 226,800.00 4,500.00 243,000.00
702-03-D catch basins (cb-07) 64      ea 4,800.00 307,200.00 4,400.00 281,600.00 4,800.00 307,200.00 5,000.00 320,000.00
702-03-F catch basins (cb-08) 25      ea 7,500.00 187,500.00 6,500.00 162,500.00 6,500.00 162,500.00 7,400.00 185,000.00
702-04 adjusting sanatary sewer manholes 15      ea 1,000.00 15,000.00 2,000.00 30,000.00 2,000.00 30,000.00 3,500.00 52,500.00
703-03 perforated pipe underdrains 7,016      ln m 30.00 210,480.00 30.00 210,480.00 22.00 154,352.00 37.00 259,592.00
706-02-A concrete drive (100 mm thick) 6,800.0    sq m 30.00 204,000.00 42.00 285,600.00 75.00 510,000.00 48.00 326,400.00
707-01 concrete curb 7,338.8    ln m 10.00 73,388.00 14.00 102,743.20 30.00 220,164.00 15.00 110,082.00
708-01 right-of-way monument 167      ea 200.00 33,400.00 120.00 20,040.00 140.00 23,380.00 200.00 33,400.00
713-01 temporary signs & barricades lump      lump 130,000.00 130,000.00 300,000.00 300,000.00 750,000.00 750,000.00 500,000.00 500,000.00
713-04-A temporary pavement markings (solid line)(100 mm width) 9.000  km 355.33 3,197.97 350.00 3,150.00 400.00 3,600.00 580.00 5,220.00
713-04-A-01 temporary pavement markings (solid line)(100 mm width)
(type i removable)
16.144  km 4,500.00 72,648.00 4,500.00 72,648.00 5,000.00 80,720.00 12,000.00 193,728.00
717-01 seeding 301      kg 17.60 5,297.60 20.00 6,020.00 33.00 9,933.00 20.00 6,020.00
718-01 fertilizer 7,490      kg 0.55 4,119.50 0.60 4,494.00 2.00 14,980.00 0.70 5,243.00
722-01 project site laboratory 1      ea 15,000.00 15,000.00 20,000.00 20,000.00 12,000.00 12,000.00 100,000.00 100,000.00
726-01 bedding material 1,805.1    cu m 80.00 144,408.00 90.00 162,459.00 85.00 153,433.50 85.00 153,433.50
727-01 mobilization lump      lump 1,600,000.00 1,600,000.00 1,700,000.00 1,700,000.00 850,000.00 850,000.00 1,980,000.00 1,980,000.00
729-01 sign (type a) 0.46   sq m 500.00 230.00 1,000.00 460.00 500.00 230.00 900.00 414.00
729-16-B object marker assembly (type 2) 18      ea 60.00 1,080.00 80.00 1,440.00 70.00 1,260.00 70.00 1,260.00
730-08-A electrical service point (existing power pole) 1      ea 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 9,000.00 9,000.00
731-02 reflectorized raised pavement markers 1,427      ea 5.08 7,249.16 5.00 7,135.00 5.20 7,420.40 6.00 8,562.00
732-01-C plastic pavement striping (200 mm width) 170      ln m 15.23 2,589.10 15.00 2,550.00 15.00 2,550.00 3.50 595.00
732-01-E plastic pavement striping (600 mm width) 336      ln m 25.38 8,527.68 25.00 8,400.00 25.00 8,400.00 10.00 3,360.00
732-02-A plastic pavement striping (solid line)(100 mm width) 17.496  km 2,100.00 36,741.60 2,100.00 36,741.60 2,100.00 36,741.60 1,900.00 33,242.40
732-03-A-01 plastic pvmt striping(broken line)(100mmwidth)
preformed marking tape (type v)
14.880  km 3,857.87 57,405.11 3,800.00 56,544.00 3,800.00 56,544.00 2,900.00 43,152.00
732-04-A plastic pavement legends & symbols (arrow) 40      ea 355.33 14,213.20 350.00 14,000.00 350.00 14,000.00 200.00 8,000.00
732-04-B plastic pavement legends & symbols (double arrow) 1      ea 456.85 456.85 450.00 450.00 450.00 450.00 230.00 230.00
732-04-C plastic pavement legends & symbols (only) 7      ea 1,015.23 7,106.61 1,000.00 7,000.00 1,000.00 7,000.00 240.00 1,680.00
732-05 removal of existing markings 1.000  km 11,167.51 11,167.51 11,000.00 11,000.00 6,000.00 6,000.00 4,300.00 4,300.00
735-01 mailboxes 68      ea 10.00 680.00 1.00 68.00 1.00 68.00 10.00 680.00
735-02 mailbox supports (single) 59      ea 150.00 8,850.00 130.00 7,670.00 160.00 9,440.00 180.00 10,620.00
735-03 mailbox supports (double) 3      ea 200.00 600.00 200.00 600.00 320.00 960.00 230.00 690.00
735-04 mailbox supports (multiple) 1      ea 300.00 300.00 250.00 250.00 500.00 500.00 450.00 450.00
736-01 trenching and backfilling 25      ln m 12.00 300.00 12.00 300.00 12.00 300.00 26.00 650.00
736-04-B signal support (9.14m steel strain pole) 4      ea 7,000.00 28,000.00 7,000.00 28,000.00 7,500.00 30,000.00 8,000.00 32,000.00
736-05-B signal head (3 section, 0.305m led lens,r,y,g) 9      each 1,400.00 12,600.00 1,400.00 12,600.00 1,500.00 13,500.00 1,300.00 11,700.00
736-05-C signal head (5 section, 0.305m led
lens,r,l.t.y,y,l.t.g,g)
1      each 1,900.00 1,900.00 1,900.00 1,900.00 1,900.00 1,900.00 2,000.00 2,000.00
736-05-D signal head (5 section, 0.305m led
lens,r,y,r.t.y,g,r.t.g)
1      each 1,900.00 1,900.00 1,900.00 1,900.00 1,900.00 1,900.00 2,000.00 2,000.00
736-06-01 signal service (pedestal required) 1      ea 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2,500.00 2,500.00
736-08-A signal controller(ts-2, type2; pole mounted cabinet) 1      ea 15,000.00 15,000.00 15,000.00 15,000.00 17,000.00 17,000.00 14,500.00 14,500.00
736-10-A underground junction box (type e) 2      ea 500.00 1,000.00 500.00 1,000.00 600.00 1,200.00 520.00 1,040.00
736-11-A conduit (0.05lm pec, schedule 80) 25      ln m 15.00 375.00 15.00 375.00 16.00 400.00 12.00 300.00
736-12-A conductor (3c,power,6 awg,concentric) 25      ln m 15.00 375.00 15.00 375.00 16.00 400.00 45.00 1,125.00
736-12-B conductor (6c,signal,14 awg, stranded ) 17      ln m 10.00 170.00 10.00 170.00 12.00 204.00 15.00 255.00
736-12-C conductor (10c,signal,14 awg,stranded ) 287      ln m 12.00 3,444.00 12.00 3,444.00 13.00 3,731.00 9.00 2,583.00
740-01 construction layout lump      lump 250,000.00 250,000.00 300,000.00 300,000.00 230,000.00 230,000.00 500,000.00 500,000.00
742-01-C-01 sanitary sewer pipe (200 mm)(ductile iron pipe) 22      ln m 1,625.00 35,750.00 200.00 4,400.00 180.00 3,960.00 200.00 4,400.00
742-02 adjusting sanitary sewer house connections 20      ea 1,000.00 20,000.00 800.00 16,000.00 2,000.00 40,000.00 50.00 1,000.00
742-03 adjusting sanitary sewer service lines 120      ln m 75.00 9,000.00 150.00 18,000.00 110.00 13,200.00 70.00 8,400.00
805-01-B class a concrete (box culvert headwalls) 124.43   cu m 1,500.00 186,645.00 1,300.00 161,759.00 1,400.00 174,202.00 1,600.00 199,088.00
805-01-C class a concrete (retaining walls) 563.16   cu m 1,300.00 732,108.00 1,000.00 563,160.00 1,400.00 788,424.00 1,600.00 901,056.00
805-12-E reinforced concrete box culverts (1200 mm x 1200 mm) 288.00   ln m 1,200.00 345,600.00 1,400.00 403,200.00 1,100.00 316,800.00 1,200.00 345,600.00
805-12-V reinforced concrete box culverts (2700 mm x 2700 mm) 44.00   ln m 4,000.00 176,000.00 2,600.00 114,400.00 3,400.00 149,600.00 3,600.00 158,400.00
806-01 deformed reinforcing steel 38,914      kg 2.00 77,828.00 2.00 77,828.00 2.00 77,828.00 2.30 89,502.20
S-002 extend existing rc box (sta. 3+181, rt., 1200mm x
900mm)
6      lnmt 2,000.00 12,000.00 2,400.00 14,400.00 1,800.00 10,800.00 2,000.00 12,000.00
S-003 paved gutter drains 5      ea 2,000.00 10,000.00 3,000.00 15,000.00 3,500.00 17,500.00 2,200.00 11,000.00
S-004 traffic maintenance asphaltic concrete 1,000      Mg 125.00 125,000.00 140.00 140,000.00 120.00 120,000.00 120.00 120,000.00
S-005 trench drain 96      ln m 300.00 28,800.00 350.00 33,600.00 240.00 23,040.00 350.00 33,600.00
S-006 connection to catch basin or manhole 50      ea 250.00 12,500.00 600.00 30,000.00 250.00 12,500.00 700.00 35,000.00
S-010 video detection device and connection 1      ea 5,000.00 5,000.00 5,000.00 5,000.00 6,000.00 6,000.00 4,800.00 4,800.00
S-011 video detection system 3      ea 7,500.00 22,500.00 7,500.00 22,500.00 8,000.00 24,000.00 6,800.00 20,400.00
                       
 CONTRACTOR TOTAL       16,885,359.89   16,955,910.80   17,889,027.99   19,898,077.55
 
Item Number Item Description Quantity Unit of Measure - 5 -
SOUTHERN INDUSTRIAL CONTRACTORS LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 75,000.00 75,000.00            
202-01 removal of structures & obstructions lump      lump 250,000.00 250,000.00            
202-02-B-01 removal of concrete box culverts(sta.1+275.85;
0.61mx1.69mx21.92m)
1      ea 4,000.00 4,000.00            
202-02-B-02 removal of concrete box culverts(sta.2+628.42;
0.61mx0.61mx16.35m)
1      ea 4,000.00 4,000.00            
202-02-B-03 removal of concrete box culverts(sta.3+059.92;
2.44mx2.44mx23.94m)
1      ea 20,000.00 20,000.00            
202-02-B-04 removal of concrete box culverts(sta.3+182.07;
1.22mx0.85mx27.29m)
1      ea 4,000.00 4,000.00            
202-02-B-05 removal of concrete box culverts(sta.3+440.01;
1.40mx1.31mx24.22m)
1      ea 10,000.00 10,000.00            
202-02-B-06 removal of concrete box culverts(sta.3+798.66;
0.61mx0.61mx16.37m)
1      ea 5,000.00 5,000.00            
202-02-B-07 removal of concrete box culverts(sta.4+427.27;
0.61mx0.61mx16.02m)
1      ea 5,000.00 5,000.00            
202-02-B-08 removal of concrete box culverts(sta.4+884.47;
1.22mx.92mx26.72m)
1      ea 5,000.00 5,000.00            
202-02-D removal of concrete walks & drives 9,177      sq m 10.90 100,029.30            
202-02-F removal of concrete combination curb & gutter 430.6    ln m 11.50 4,951.90            
202-02-G removal of surfacing & stabilized base 44,028.1    sq m 7.15 314,800.92            
202-02-H removal of guard rail 120      ln m 83.35 10,002.00            
202-02-I removal of existing traffic signal equipment lump      lump 9,720.00 9,720.00            
203-01 general excavation (plan quantity measurement) 38,764      cu m 13.10 507,808.40            
203-02 drainage excavation (plan quantity measurement) 415      cu m 65.70 27,265.50            
203-03 embankment(plan quantity measurement) 19,098      cu m 26.20 500,367.60            
204-02 temporary hay or straw bales 196      ea 12.00 2,352.00            
204-05-A temporary sediment check dams (hay) 208      ea 150.00 31,200.00            
204-06 temporary silt fencing 9,080      ln m 7.95 72,186.00            
302-02-E class ii base course (250 mm thick) 80,390.9    sq m 30.70 2,468,000.63            
302-02-F class ii base course (300 mm thick) 7,419.0    sq m 36.40 270,051.60            
304-01 lime 607.82   Mg 198.45 120,621.88            
304-04-D lime treatment (type d) (300 mm thick) 40,200      sq m 12.00 482,400.00            
402-01 traffic maintenance aggregate (vehicular measurement) 5,000.0    cu m 96.00 480,000.00            
502-01 superpave asphaltic concrete 2,436.3    Mg 192.10 468,013.23            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
158.4    Mg 300.00 47,520.00            
601-01-G portland cement concrete pavement (200 mm thick) 74,400.0    sq m 80.65 6,000,360.00            
601-02-G portland cement concrete pavement (200 mm thick)
(crossovers & turnouts)
3,604.1    sq m 89.75 323,467.98            
601-04 portland cement concrete pavement coring 105      ea 100.00 10,500.00            
602-05 full depth patching of jointed concrete pavement 126.0    sq m 240.00 30,240.00            
701-01-K cross drain pipe (750 mm rcp/pcp) 149.0    ln m 324.00 48,276.00            
701-01-M cross drain pipe (900 mm rcp/pcp) 34.0    ln m 420.00 14,280.00            
701-01-O cross drain pipe (1200 mm rcp/pcp) 30.0    ln m 648.00 19,440.00            
701-01-S cross drain pipe (1800 mm rcp/pcp) 38.0    ln m 1,320.00 50,160.00            
701-03-F storm drain pipe (375 mm rcp/pcp) 4,729.0    ln m 204.10 965,188.90            
701-03-G storm drain pipe (450 mm rcp/pcp) 468.0    ln m 210.00 98,280.00            
701-03-I storm drain pipe (600 mm rcp/pcp) 139.0    ln m 230.00 31,970.00            
701-03-M storm drain pipe (900 mm rcp/pcp) 143.0    ln m 350.00 50,050.00            
701-04-G storm drain pipe arch (1050 mm equiv. rcpa) 70.0    ln m 471.45 33,001.50            
701-05-G side drain pipe (450 mm) 35.2    ln m 184.70 6,501.44            
702-02-B manholes (r-cb-11) 15      ea 6,667.00 100,005.00            
702-03-A catch basins (cb-01) 34      ea 2,060.00 70,040.00            
702-03-C catch basins (cb-06) 54      ea 4,575.00 247,050.00            
702-03-D catch basins (cb-07) 64      ea 5,040.00 322,560.00            
702-03-F catch basins (cb-08) 25      ea 7,440.00 186,000.00            
702-04 adjusting sanatary sewer manholes 15      ea 3,600.00 54,000.00            
703-03 perforated pipe underdrains 7,016      ln m 32.85 230,475.60            
706-02-A concrete drive (100 mm thick) 6,800.0    sq m 52.95 360,060.00            
707-01 concrete curb 7,338.8    ln m 16.45 120,723.26            
708-01 right-of-way monument 167      ea 225.00 37,575.00            
713-01 temporary signs & barricades lump      lump 100,000.00 100,000.00            
713-04-A temporary pavement markings (solid line)(100 mm width) 9.000  km 588.00 5,292.00            
713-04-A-01 temporary pavement markings (solid line)(100 mm width)
(type i removable)
16.144  km 11,794.00 190,402.34            
717-01 seeding 301      kg 23.95 7,208.95            
718-01 fertilizer 7,490      kg 0.80 5,992.00            
722-01 project site laboratory 1      ea 50,000.00 50,000.00            
726-01 bedding material 1,805.1    cu m 90.00 162,459.00            
727-01 mobilization lump      lump 2,000,000.00 2,000,000.00            
729-01 sign (type a) 0.46   sq m 2,609.00 1,200.14            
729-16-B object marker assembly (type 2) 18      ea 72.25 1,300.50            
730-08-A electrical service point (existing power pole) 1      ea 9,240.00 9,240.00            
731-02 reflectorized raised pavement markers 1,427      ea 6.15 8,776.05            
732-01-C plastic pavement striping (200 mm width) 170      ln m 3.54 601.80            
732-01-E plastic pavement striping (600 mm width) 336      ln m 3.95 1,327.20            
732-02-A plastic pavement striping (solid line)(100 mm width) 17.496  km 1,935.00 33,854.76            
732-03-A-01 plastic pvmt striping(broken line)(100mmwidth)
preformed marking tape (type v)
14.880  km 2,964.00 44,104.32            
732-04-A plastic pavement legends & symbols (arrow) 40      ea 210.00 8,400.00            
732-04-B plastic pavement legends & symbols (double arrow) 1      ea 240.00 240.00            
732-04-C plastic pavement legends & symbols (only) 7      ea 257.15 1,800.05            
732-05 removal of existing markings 1.000  km 4,500.00 4,500.00            
735-01 mailboxes 68      ea 51.20 3,481.60            
735-02 mailbox supports (single) 59      ea 180.00 10,620.00            
735-03 mailbox supports (double) 3      ea 240.00 720.00            
735-04 mailbox supports (multiple) 1      ea 480.00 480.00            
736-01 trenching and backfilling 25      ln m 26.50 662.50            
736-04-B signal support (9.14m steel strain pole) 4      ea 8,160.00 32,640.00            
736-05-B signal head (3 section, 0.305m led lens,r,y,g) 9      each 1,368.00 12,312.00            
736-05-C signal head (5 section, 0.305m led
lens,r,l.t.y,y,l.t.g,g)
1      each 2,220.00 2,220.00            
736-05-D signal head (5 section, 0.305m led
lens,r,y,r.t.y,g,r.t.g)
1      each 2,220.00 2,220.00            
736-06-01 signal service (pedestal required) 1      ea 2,544.00 2,544.00            
736-08-A signal controller(ts-2, type2; pole mounted cabinet) 1      ea 15,066.00 15,066.00            
736-10-A underground junction box (type e) 2      ea 528.00 1,056.00            
736-11-A conduit (0.05lm pec, schedule 80) 25      ln m 12.00 300.00            
736-12-A conductor (3c,power,6 awg,concentric) 25      ln m 48.00 1,200.00            
736-12-B conductor (6c,signal,14 awg, stranded ) 17      ln m 15.90 270.30            
736-12-C conductor (10c,signal,14 awg,stranded ) 287      ln m 10.05 2,884.35            
740-01 construction layout lump      lump 800,000.00 800,000.00            
742-01-C-01 sanitary sewer pipe (200 mm)(ductile iron pipe) 22      ln m 497.75 10,950.50            
742-02 adjusting sanitary sewer house connections 20      ea 1,800.00 36,000.00            
742-03 adjusting sanitary sewer service lines 120      ln m 394.00 47,280.00            
805-01-B class a concrete (box culvert headwalls) 124.43   cu m 1,350.00 167,980.50            
805-01-C class a concrete (retaining walls) 563.16   cu m 1,350.00 760,266.00            
805-12-E reinforced concrete box culverts (1200 mm x 1200 mm) 288.00   ln m 1,260.00 362,880.00            
805-12-V reinforced concrete box culverts (2700 mm x 2700 mm) 44.00   ln m 3,723.00 163,812.00            
806-01 deformed reinforcing steel 38,914      kg 2.40 93,393.60            
S-002 extend existing rc box (sta. 3+181, rt., 1200mm x
900mm)
6      lnmt 2,040.00 12,240.00            
S-003 paved gutter drains 5      ea 3,600.00 18,000.00            
S-004 traffic maintenance asphaltic concrete 1,000      Mg 225.00 225,000.00            
S-005 trench drain 96      ln m 787.50 75,600.00            
S-006 connection to catch basin or manhole 50      ea 2,000.00 100,000.00            
S-010 video detection device and connection 1      ea 4,920.00 4,920.00            
S-011 video detection system 3      ea 7,000.00 21,000.00            
                       
 CONTRACTOR TOTAL       21,334,194.10            