| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
45   |
SQYD |
10.00 |
450.00 |
30.00 |
1,350.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
100.0 |
LNFT |
18.00 |
1,800.00 |
10.00 |
1,000.00 |
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
100.0 |
LNFT |
15.00 |
1,500.00 |
10.00 |
1,000.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
250   |
CUYD |
60.00 |
15,000.00 |
15.00 |
3,750.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
3,070.4 |
TON |
85.00 |
260,984.00 |
90.00 |
276,336.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
950.0 |
TON |
150.00 |
142,500.00 |
90.00 |
85,500.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
34,829   |
SQYD |
3.50 |
121,901.50 |
4.00 |
139,316.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,451   |
CUYD |
20.00 |
- 29,020.00 |
10.00 |
- 14,510.00 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
1,100   |
SQYD |
90.00 |
99,000.00 |
90.00 |
99,000.00 |
|
|
|
|
| 510-03 |
pavement joint repair
|
100.0 |
TON |
200.00 |
20,000.00 |
300.00 |
30,000.00 |
|
|
|
|
| 602-05-C-01 |
full depth patching of jointed conc pvmt (6" thick)
(16.0 sq yds & under) |
74.4 |
SQYD |
100.00 |
7,440.00 |
125.00 |
9,300.00 |
|
|
|
|
| 602-05-C-02 |
full depth patching of jointed conc pvmt (6" thick)
(16.1 - 48.0 sq yds) |
188.9 |
SQYD |
110.00 |
20,779.00 |
100.00 |
18,890.00 |
|
|
|
|
| 602-05-C-03 |
full depth patching of jointed conc pvmt (6" thick)
(48.1 sq yds & over) |
271.1 |
SQYD |
115.00 |
31,176.50 |
80.00 |
21,688.00 |
|
|
|
|
| 701-14 |
cleaning existing pipes
|
20   |
LNFT |
25.00 |
500.00 |
50.00 |
1,000.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
2   |
EACH |
150.00 |
300.00 |
1,500.00 |
3,000.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
2   |
EACH |
1,200.00 |
2,400.00 |
1,500.00 |
3,000.00 |
|
|
|
|
| 706-01-A |
concrete walk ( 4" thick)
|
45.0 |
SQYD |
85.00 |
3,825.00 |
80.00 |
3,600.00 |
|
|
|
|
| 706-04 |
handicapped curb ramps
|
2   |
EACH |
1,800.00 |
3,600.00 |
2,500.00 |
5,000.00 |
|
|
|
|
| 707-01 |
concrete curb
|
100.0 |
LNFT |
40.00 |
4,000.00 |
45.00 |
4,500.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
100.0 |
LNFT |
50.00 |
5,000.00 |
50.00 |
5,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
75,000.00 |
75,000.00 |
140,000.00 |
140,000.00 |
|
|
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
930   |
LNFT |
0.50 |
465.00 |
0.30 |
279.00 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
5,065   |
LNFT |
1.00 |
5,065.00 |
1.00 |
5,065.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.900 |
MILE |
250.00 |
1,475.00 |
10.00 |
59.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.960 |
MILE |
500.00 |
980.00 |
15.00 |
29.40 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
14.460 |
MILE |
700.00 |
10,122.00 |
20.00 |
289.20 |
|
|
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
22   |
EACH |
55.00 |
1,210.00 |
50.00 |
1,100.00 |
|
|
|
|
| 713-05-C |
temporary pavement legends and symbols (only)
|
2   |
EACH |
75.00 |
150.00 |
60.00 |
120.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
85,000.00 |
85,000.00 |
90,000.00 |
90,000.00 |
|
|
|
|
| 729-19-B |
dead end road installations(type b)
|
2   |
EACH |
1,400.00 |
2,800.00 |
1,200.00 |
2,400.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,086   |
EACH |
6.00 |
6,516.00 |
5.00 |
5,430.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
465   |
LNFT |
1.00 |
465.00 |
1.00 |
465.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
2,580   |
LNFT |
4.00 |
10,320.00 |
3.50 |
9,030.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.230 |
MILE |
3,000.00 |
21,690.00 |
2,700.00 |
19,521.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.980 |
MILE |
850.00 |
833.00 |
750.00 |
735.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
11   |
EACH |
190.00 |
2,090.00 |
190.00 |
2,090.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
225.00 |
225.00 |
230.00 |
230.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
957,542.00 |
|
978,562.60 |
|
|
|
|
|