Lead Project: 053-09-0075
Parish: CADDO
Routes: LA 1
Description: SOUTHFIELD - STRAFORD
Type Const: superpave asphaltic concrete pavement resurfacing and related work.
Estimated Construction Cost: $733,600.80
 
RankLicenseBidderConstruction Bid
1 17464 BENTON & BROWN, LLC. $773,190.91
2 08584 MADDEN CONTRACTING CO., INC. $972,534.20
3 36374 BEST-YET BUILDERS, LLC $978,924.81
 
Item Number Item Description Quantity Unit of Measure - 1 -
BENTON & BROWN, LLC.
- 2 -
MADDEN CONTRACTING CO., INC.
- 3 -
BEST-YET BUILDERS, LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
502-01 superpave asphaltic concrete 5,141.5    TON 75.00 385,612.50 87.20 448,338.80 90.00 462,735.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
180.3    TON 150.00 27,045.00 50.00 9,015.00 100.00 18,030.00    
509-01 cold planing asphaltic pavement 48,380      SQYD 2.25 108,855.00 3.80 183,844.00 3.00 145,140.00    
510-01-B pavement patching (12" minimum thickness) 1,000      SQYD 75.00 75,000.00 93.25 93,250.00 50.00 50,000.00    
713-01 temporary signs & barricades lump      LUMP 50,000.00 50,000.00 66,700.00 66,700.00 100,000.00 100,000.00    
713-02-C temporary pavement markings (8" width) 592      LNFT 0.25 148.00 0.30 177.60 0.25 148.00    
713-02-D temporary pavement markings (12" width) 1,648      LNFT 0.55 906.40 0.60 988.80 0.50 824.00    
713-02-E temporary pavement markings (24" width) 2,340      LNFT 0.75 1,755.00 0.90 2,106.00 0.70 1,638.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
1.000  MILE 800.00 800.00 400.00 400.00 3,000.00 3,000.00    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
9.948  MILE 1.00 9.95 400.00 3,979.20 1.00 9.95    
713-04-A temporary pavement markings (solid line)(4" width) 10.656  MILE 1.00 10.66 800.00 8,524.80 1.00 10.66    
713-05-A temporary pavement legends and symbols (arrow) 66      EACH 60.00 3,960.00 100.00 6,600.00 1.00 66.00    
713-05-C temporary pavement legends and symbols (only) 66      EACH 70.00 4,620.00 100.00 6,600.00 1.00 66.00    
727-01 mobilization lump      LUMP 50,000.00 50,000.00 66,700.00 66,700.00 75,000.00 75,000.00    
731-02 reflectorized raised pavement markers 1,720      EACH 6.00 10,320.00 5.75 9,890.00 5.65 9,718.00    
732-01-C plastic pavement striping (8" width) 296      LNFT 1.00 296.00 1.00 296.00 0.90 266.40    
732-01-D plastic pavement striping (12" width) 824      LNFT 1.50 1,236.00 1.50 1,236.00 1.40 1,153.60    
732-01-E plastic pavement striping (24" width) 1,170      LNFT 4.00 4,680.00 3.00 3,510.00 3.60 4,212.00    
732-02-A plastic pavement striping (solid line) (4" width) 5.328  MILE 2,900.00 15,451.20 3,000.00 15,984.00 2,651.00 14,124.53    
732-03-A plastic pavement striping (broken line)(4" width) 4.974  MILE 800.00 3,979.20 1,000.00 4,974.00 759.00 3,775.27    
732-04-A plastic pavement legends & symbols (arrow) 33      EACH 200.00 6,600.00 200.00 6,600.00 192.50 6,352.50    
732-04-C plastic pavement legends & symbols (only) 33      EACH 250.00 8,250.00 250.00 8,250.00 231.00 7,623.00    
736-09 loop detector 319      LNFT 24.00 7,656.00 30.00 9,570.00 0.10 31.90    
740-01 construction layout lump      LUMP 6,000.00 6,000.00 15,000.00 15,000.00 75,000.00 75,000.00    
                       
 CONTRACTOR TOTAL       773,190.91   972,534.20   978,924.81    