Letting of 11/14/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 037-03-0019
Parish: W CARROLL
Routes: LA 2
Description: 4225' EAST OF LA 17 - EAST CARROLL P/L
Type Const: grading, cold planing asphaltic concrete, pavement patching, superpave asphaltic
concrete overlay and related work.
Estimated Construction Cost: $1,151,742.34
 
RankLicenseBidderConstruction Bid
1 05789 D & J CONSTRUCTION CO., INC. $1,303,561.92
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,350,347.95
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 244      LNFT 12.00 2,928.00 17.50 4,270.00        
203-07 borrow (vehicular measurement) 1,461      CUYD 21.00 30,681.00 22.00 32,142.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
1,233      CUYD 15.00 18,495.00 100.00 123,300.00        
502-01 superpave asphaltic concrete 5,784.4    TON 98.00 566,871.20 95.00 549,518.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,403.6    TON 138.00 193,696.80 175.00 245,630.00        
509-01 cold planing asphaltic pavement 29,658      SQYD 3.00 88,974.00 1.50 44,487.00        
509-02 contractor retained reclaimed asphaltic pavement - 1,238      CUYD 0.01 - 12.38 0.10 - 123.80        
510-01-C pavement patching (15" mimimum thickness) 637      SQYD 125.00 79,625.00 124.00 78,988.00        
704-03 blocked out guard rail 125.1    LNFT 22.00 2,752.20 23.00 2,877.30        
704-07-A guard rail bridge attachments (single thrie beam) 25.0    LNFT 50.00 1,250.00 40.00 1,000.00        
704-08-B guard rail transitions (double thrie beam) 50.0    LNFT 55.00 2,750.00 65.00 3,250.00        
704-11-A guard rail end treatment (flared) 2      EACH 2,600.00 5,200.00 2,500.00 5,000.00        
713-01 temporary signs & barricades lump      LUMP 110,000.00 110,000.00 60,000.00 60,000.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
6.171  MILE 200.00 1,234.20 150.00 925.65        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
4.728  MILE 250.00 1,182.00 350.00 1,654.80        
713-04-A temporary pavement markings (solid line)(4" width) 17.694  MILE 250.00 4,423.50 600.00 10,616.40        
716-01-A mulch (vegetative) 4.0    TON 500.00 2,000.00 550.00 2,200.00        
717-01 seeding 180      LB 10.00 1,800.00 10.00 1,800.00        
718-01 fertilizer 4,000      LB 0.55 2,200.00 0.55 2,200.00        
727-01 mobilization lump      LUMP 120,000.00 120,000.00 130,000.00 130,000.00        
729-16-C object marker assembly (type 3) 2      EACH 100.00 200.00 100.00 200.00        
731-02 reflectorized raised pavement markers 273      EACH 12.00 3,276.00 5.00 1,365.00        
732-02-A plastic pavement striping (solid line) (4" width) 5.898  MILE 3,200.00 18,873.60 2,600.00 15,334.80        
732-03-A plastic pavement striping (broken line)(4" width) 1.576  MILE 1,800.00 2,836.80 800.00 1,260.80        
735-01 mailboxes 27      EACH 25.00 675.00 1.00 27.00        
735-02 mailbox supports (single) 20      EACH 150.00 3,000.00 125.00 2,500.00        
735-03 mailbox supports (double) 2      EACH 200.00 400.00 175.00 350.00        
735-04 mailbox supports (multiple) 1      EACH 375.00 375.00 325.00 325.00        
740-01 construction layout lump      LUMP 15,000.00 15,000.00 12,000.00 12,000.00        
S-001 tree trimming lump      LUMP 15,000.00 15,000.00 15,000.00 15,000.00        
S-002 saw cutting asphaltic concrete patches (15" deep) 2,250      LNFT 3.50 7,875.00 1.00 2,250.00        
                       
 CONTRACTOR TOTAL       1,303,561.92   1,350,347.95        