| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
244   |
LNFT |
12.00 |
2,928.00 |
17.50 |
4,270.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
1,461   |
CUYD |
21.00 |
30,681.00 |
22.00 |
32,142.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,233   |
CUYD |
15.00 |
18,495.00 |
100.00 |
123,300.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
5,784.4 |
TON |
98.00 |
566,871.20 |
95.00 |
549,518.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,403.6 |
TON |
138.00 |
193,696.80 |
175.00 |
245,630.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
29,658   |
SQYD |
3.00 |
88,974.00 |
1.50 |
44,487.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,238   |
CUYD |
0.01 |
- 12.38 |
0.10 |
- 123.80 |
|
|
|
|
| 510-01-C |
pavement patching (15" mimimum thickness)
|
637   |
SQYD |
125.00 |
79,625.00 |
124.00 |
78,988.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
125.1 |
LNFT |
22.00 |
2,752.20 |
23.00 |
2,877.30 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
25.0 |
LNFT |
50.00 |
1,250.00 |
40.00 |
1,000.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
50.0 |
LNFT |
55.00 |
2,750.00 |
65.00 |
3,250.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,600.00 |
5,200.00 |
2,500.00 |
5,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
110,000.00 |
110,000.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
6.171 |
MILE |
200.00 |
1,234.20 |
150.00 |
925.65 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
4.728 |
MILE |
250.00 |
1,182.00 |
350.00 |
1,654.80 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
17.694 |
MILE |
250.00 |
4,423.50 |
600.00 |
10,616.40 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
4.0 |
TON |
500.00 |
2,000.00 |
550.00 |
2,200.00 |
|
|
|
|
| 717-01 |
seeding
|
180   |
LB |
10.00 |
1,800.00 |
10.00 |
1,800.00 |
|
|
|
|
| 718-01 |
fertilizer
|
4,000   |
LB |
0.55 |
2,200.00 |
0.55 |
2,200.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
120,000.00 |
120,000.00 |
130,000.00 |
130,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
2   |
EACH |
100.00 |
200.00 |
100.00 |
200.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
273   |
EACH |
12.00 |
3,276.00 |
5.00 |
1,365.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.898 |
MILE |
3,200.00 |
18,873.60 |
2,600.00 |
15,334.80 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.576 |
MILE |
1,800.00 |
2,836.80 |
800.00 |
1,260.80 |
|
|
|
|
| 735-01 |
mailboxes
|
27   |
EACH |
25.00 |
675.00 |
1.00 |
27.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
20   |
EACH |
150.00 |
3,000.00 |
125.00 |
2,500.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
200.00 |
400.00 |
175.00 |
350.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
375.00 |
375.00 |
325.00 |
325.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| S-001 |
tree trimming
|
lump |
LUMP |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| S-002 |
saw cutting asphaltic concrete patches (15" deep)
|
2,250   |
LNFT |
3.50 |
7,875.00 |
1.00 |
2,250.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,303,561.92 |
|
1,350,347.95 |
|
|
|
|
|