| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - D & J CONSTRUCTION CO., INC. |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
50,000.00 |
50,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
747   |
SQYD |
20.00 |
14,940.00 |
6.00 |
4,482.00 |
30.00 |
22,410.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
27,446.7 |
SQYD |
5.00 |
137,233.50 |
4.00 |
109,786.80 |
12.00 |
329,360.40 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
1,147   |
CUYD |
18.00 |
20,646.00 |
14.00 |
16,058.00 |
18.00 |
20,646.00 |
|
|
| 304-05 |
lime treatment (type e)
|
432.30 |
TON |
325.00 |
140,497.50 |
280.00 |
121,044.00 |
375.00 |
162,112.50 |
|
|
| 308-02 |
removal of existing patches
|
50   |
SQYD |
5.00 |
250.00 |
8.00 |
400.00 |
65.00 |
3,250.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
265   |
CUYD |
88.00 |
23,320.00 |
28.00 |
7,420.00 |
45.00 |
11,925.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
3,000.0 |
CUYD |
35.00 |
105,000.00 |
15.00 |
45,000.00 |
45.00 |
135,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
20,019.3 |
TON |
90.00 |
1,801,737.00 |
89.00 |
1,781,717.70 |
95.00 |
1,901,833.50 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
929.5 |
TON |
160.00 |
148,720.00 |
115.00 |
106,892.50 |
175.00 |
162,662.50 |
|
|
| 509-01-A |
cold planing asphaltic pavement (2" depth)
|
15,022   |
SQYD |
2.00 |
30,044.00 |
3.50 |
52,577.00 |
5.00 |
75,110.00 |
|
|
| 509-01-B |
cold planing asphaltic pavement (5" depth)
|
23,867   |
SQYD |
3.40 |
81,147.80 |
4.50 |
107,401.50 |
9.00 |
214,803.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,074   |
CUYD |
0.01 |
- 20.74 |
0.01 |
- 20.74 |
0.10 |
- 207.40 |
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
99   |
SQYD |
75.00 |
7,425.00 |
85.00 |
8,415.00 |
125.00 |
12,375.00 |
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
947   |
SQYD |
135.00 |
127,845.00 |
85.00 |
80,495.00 |
150.00 |
142,050.00 |
|
|
| 701-10-O |
reinforced concrete pipe (extension)(48")
|
16   |
LNFT |
400.00 |
6,400.00 |
375.00 |
6,000.00 |
370.00 |
5,920.00 |
|
|
| 701-15 |
concrete collar
|
2   |
EACH |
850.00 |
1,700.00 |
900.00 |
1,800.00 |
1,500.00 |
3,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
35,000.00 |
35,000.00 |
180,000.00 |
180,000.00 |
350,000.00 |
350,000.00 |
|
|
| 713-02-D |
temporary pavement markings (12" width)
|
6,006   |
LNFT |
1.00 |
6,006.00 |
0.60 |
3,603.60 |
0.50 |
3,003.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.972 |
MILE |
400.00 |
1,988.80 |
175.00 |
870.10 |
200.00 |
994.40 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.068 |
MILE |
400.00 |
2,827.20 |
225.00 |
1,590.30 |
450.00 |
3,180.60 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
16.068 |
MILE |
400.00 |
6,427.20 |
275.00 |
4,418.70 |
750.00 |
12,051.00 |
|
|
| 713-05-B |
temporary pavement legends and symbols (double arrow)
|
6   |
EACH |
70.00 |
420.00 |
275.00 |
1,650.00 |
115.00 |
690.00 |
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
135   |
EACH |
1.00 |
135.00 |
6.00 |
810.00 |
2.00 |
270.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
2.5 |
TON |
420.00 |
1,050.00 |
500.00 |
1,250.00 |
600.00 |
1,500.00 |
|
|
| 717-01 |
seeding
|
148   |
LB |
8.00 |
1,184.00 |
10.00 |
1,480.00 |
11.00 |
1,628.00 |
|
|
| 718-01 |
fertilizer
|
2,470   |
LB |
0.50 |
1,235.00 |
0.40 |
988.00 |
0.75 |
1,852.50 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
52,500.00 |
52,500.00 |
|
|
| 726-01 |
bedding material
|
33.9 |
CUYD |
100.00 |
3,390.00 |
100.00 |
3,390.00 |
135.00 |
4,576.50 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
120,000.00 |
120,000.00 |
250,000.00 |
250,000.00 |
420,000.00 |
420,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
796   |
EACH |
5.80 |
4,616.80 |
7.00 |
5,572.00 |
6.66 |
5,301.36 |
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
6,006   |
LNFT |
1.00 |
6,006.00 |
4.00 |
24,024.00 |
2.25 |
13,513.50 |
|
|
| 732-02-A-03 |
plast pvmt striping(solid line)(4" width)hot appl
thermo (40mil thickness) |
5.356 |
MILE |
2,800.00 |
14,996.80 |
2,000.00 |
10,712.00 |
2,100.00 |
11,247.60 |
|
|
| 732-03-A-03 |
plastic pvmt striping(broken line)(4" width) hot appl
thermo (40 mil thick) |
2.356 |
MILE |
745.00 |
1,755.22 |
1,200.00 |
2,827.20 |
900.00 |
2,120.40 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
200.00 |
400.00 |
400.00 |
800.00 |
225.00 |
450.00 |
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
6   |
EACH |
220.00 |
1,320.00 |
400.00 |
2,400.00 |
300.00 |
1,800.00 |
|
|
| 735-01 |
mailboxes
|
2   |
EACH |
5.70 |
11.40 |
30.00 |
60.00 |
6.00 |
12.00 |
|
|
| 735-02 |
mailbox supports (single)
|
2   |
EACH |
145.00 |
290.00 |
550.00 |
1,100.00 |
150.00 |
300.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
18,000.00 |
18,000.00 |
40,000.00 |
40,000.00 |
76,000.00 |
76,000.00 |
|
|
| 805-01-A |
class a concrete (pipe headwalls)
|
21.28 |
CUYD |
1,000.00 |
21,280.00 |
1,000.00 |
21,280.00 |
2,200.00 |
46,816.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
1,172   |
LB |
2.50 |
2,930.00 |
2.50 |
2,930.00 |
5.00 |
5,860.00 |
|
|
| S-001 |
rumble strips (ground-in)
|
1.1 |
MILE |
4,500.00 |
4,950.00 |
6,500.00 |
7,150.00 |
6,400.00 |
7,040.00 |
|
|
| S-002 |
sawcuts for pavement patching
|
5,252   |
LNFT |
1.50 |
7,878.00 |
0.50 |
2,626.00 |
3.00 |
15,756.00 |
|
|
| S-003 |
sawcuts for concrete drives and aprons
|
1,680   |
LNFT |
2.00 |
3,360.00 |
8.00 |
13,440.00 |
10.00 |
16,800.00 |
|
|
| S-004 |
concrete island
|
lump |
LUMP |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,200.00 |
5,200.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,944,342.48 |
|
3,059,440.66 |
|
4,312,713.36 |
|
|
|