| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
3,000.00 |
3,000.00 |
37,000.00 |
37,000.00 |
170,000.00 |
170,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
86   |
SQYD |
22.00 |
1,892.00 |
22.00 |
1,892.00 |
16.00 |
1,376.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
4,727.8 |
SQYD |
7.00 |
33,094.60 |
8.00 |
37,822.40 |
12.00 |
56,733.60 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
1,145   |
CUYD |
30.00 |
34,350.00 |
25.00 |
28,625.00 |
20.00 |
22,900.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
58   |
CUYD |
35.00 |
2,030.00 |
110.00 |
6,380.00 |
70.00 |
4,060.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
19,486.5 |
TON |
93.00 |
1,812,244.50 |
94.00 |
1,831,731.00 |
91.00 |
1,773,271.50 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
24.8 |
TON |
193.00 |
4,786.40 |
175.00 |
4,340.00 |
220.00 |
5,456.00 |
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
32,001   |
GAL |
3.00 |
96,003.00 |
2.50 |
80,002.50 |
3.00 |
96,003.00 |
|
|
| 507-02-B |
aggregate (s2)
|
78,050   |
SQYD |
1.00 |
78,050.00 |
1.50 |
117,075.00 |
1.10 |
85,855.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
103,117   |
SQYD |
2.50 |
257,792.50 |
3.15 |
324,818.55 |
2.00 |
206,234.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,740   |
CUYD |
0.01 |
- 17.40 |
0.10 |
- 174.00 |
0.01 |
- 17.40 |
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
787   |
SQYD |
150.00 |
118,050.00 |
120.00 |
94,440.00 |
145.00 |
114,115.00 |
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
59,286   |
LNFT |
1.80 |
106,714.80 |
1.75 |
103,750.50 |
1.60 |
94,857.60 |
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
21,780   |
LNFT |
2.40 |
52,272.00 |
2.00 |
43,560.00 |
2.00 |
43,560.00 |
|
|
| 602-03 |
cleaning and sealing cracks
|
1,500   |
LNFT |
4.00 |
6,000.00 |
3.00 |
4,500.00 |
3.00 |
4,500.00 |
|
|
| 602-05-G |
full depth patching of jointed concrete pavement (8"
thick) |
1,518.0 |
SQYD |
185.00 |
280,830.00 |
175.00 |
265,650.00 |
190.00 |
288,420.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
16   |
LNFT |
250.00 |
4,000.00 |
185.00 |
2,960.00 |
250.00 |
4,000.00 |
|
|
| 701-15 |
concrete collar
|
2   |
EACH |
1,500.00 |
3,000.00 |
1,000.00 |
2,000.00 |
900.00 |
1,800.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
35.6 |
SQYD |
75.00 |
2,670.00 |
75.00 |
2,670.00 |
60.00 |
2,136.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
200,000.00 |
200,000.00 |
200,000.00 |
200,000.00 |
250,000.00 |
250,000.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
12.406 |
MILE |
225.00 |
2,791.35 |
150.00 |
1,860.90 |
400.00 |
4,962.40 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
11.786 |
MILE |
200.00 |
2,357.20 |
325.00 |
3,830.45 |
600.00 |
7,071.60 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
29.164 |
MILE |
250.00 |
7,291.00 |
550.00 |
16,040.20 |
900.00 |
26,247.60 |
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
4   |
EACH |
175.00 |
700.00 |
52.00 |
208.00 |
65.00 |
260.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
3.7 |
TON |
500.00 |
1,850.00 |
375.00 |
1,387.50 |
450.00 |
1,665.00 |
|
|
| 717-01 |
seeding
|
83   |
LB |
10.00 |
830.00 |
8.00 |
664.00 |
9.00 |
747.00 |
|
|
| 718-01 |
fertilizer
|
1,840   |
LB |
0.50 |
920.00 |
0.45 |
828.00 |
0.50 |
920.00 |
|
|
| 726-01 |
bedding material
|
7.2 |
CUYD |
100.00 |
720.00 |
95.00 |
684.00 |
100.00 |
720.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
275,000.00 |
275,000.00 |
400,000.00 |
400,000.00 |
400,000.00 |
400,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
2   |
EACH |
95.00 |
190.00 |
100.00 |
200.00 |
85.00 |
170.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,319   |
EACH |
7.00 |
9,233.00 |
5.00 |
6,595.00 |
5.50 |
7,254.50 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
21.864 |
MILE |
3,500.00 |
76,524.00 |
2,500.00 |
54,660.00 |
2,800.00 |
61,219.20 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
9.603 |
MILE |
2,000.00 |
19,206.00 |
750.00 |
7,202.25 |
850.00 |
8,162.55 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
600.00 |
1,200.00 |
150.00 |
300.00 |
200.00 |
400.00 |
|
|
| S-001 |
milling concrete pavement
|
1,586   |
SQYD |
20.00 |
31,720.00 |
18.00 |
28,548.00 |
5.50 |
8,723.00 |
|
|
| S-002 |
breaking and seating pavement
|
22,643   |
SQYD |
1.75 |
39,625.25 |
1.35 |
30,568.05 |
1.80 |
40,757.40 |
|
|
| S-003 |
rumble strips (ground-in)
|
10.8 |
MILE |
1,100.00 |
11,880.00 |
900.00 |
9,720.00 |
800.00 |
8,640.00 |
|
|
| S-004 |
stone shoulder drains
|
78   |
EACH |
500.00 |
39,000.00 |
920.00 |
71,760.00 |
500.00 |
39,000.00 |
|
|
| S-005 |
sawcuts for pavement patching
|
1,660   |
LNFT |
6.00 |
9,960.00 |
4.50 |
7,470.00 |
8.50 |
14,110.00 |
|
|
| S-006 |
saw cutting driveways (6" deep)
|
36   |
LNFT |
9.00 |
324.00 |
11.00 |
396.00 |
17.50 |
630.00 |
|
|
| S-922 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
68,532   |
LNFT |
1.25 |
85,665.00 |
1.25 |
85,665.00 |
1.30 |
89,091.60 |
|
|
| S-923 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
26,335   |
LNFT |
1.50 |
39,502.50 |
1.35 |
35,552.25 |
1.50 |
39,502.50 |
|
|
| S-927 |
sawcuts in asphaltic concrete lifts
|
94,867   |
LNFT |
1.00 |
94,867.00 |
1.00 |
94,867.00 |
1.00 |
94,867.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,848,118.70 |
|
4,048,049.55 |
|
4,080,381.65 |
|
|
|