Lead Project: 007-03-0054
Parish: ST CHARLES, ST JOHN
Routes: US 61
Description: 0.14 MI. S. OF ST. CHARLES PARISH LINE - 0.5 MI. S. OF US 51
Type Const: cold planing asphaltic concrete, pavement patching, superpave asphaltic concrete
overlay, and related work.
Estimated Construction Cost: $1,388,849.37
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC $1,212,076.06
2 00481 COASTAL BRIDGE CO., L.L.C. $1,489,689.60
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
COASTAL BRIDGE CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
502-01 superpave asphaltic concrete 8,056.8    TON 75.00 604,260.00 90.00 725,112.00        
509-01 cold planing asphaltic pavement 73,243      SQYD 2.00 146,486.00 3.10 227,053.30        
510-01-B pavement patching (12" minimum thickness) 1,500      SQYD 90.00 135,000.00 86.50 129,750.00        
713-01 temporary signs & barricades lump      LUMP 95,000.00 95,000.00 50,000.00 50,000.00        
713-02-A temporary pavement markings (4" width) 1,000      LNFT 0.10 100.00 0.15 150.00        
713-02-C temporary pavement markings (8" width) 3,900      LNFT 0.20 780.00 0.30 1,170.00        
713-02-E temporary pavement markings (24" width) 880      LNFT 0.75 660.00 0.90 792.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
9.480  MILE 15.00 142.20 400.00 3,792.00        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
9.144  MILE 20.00 182.88 475.00 4,343.40        
713-04-A temporary pavement markings (solid line)(4" width) 17.406  MILE 30.00 522.18 800.00 13,924.80        
713-05-A temporary pavement legends and symbols (arrow) 24      each 25.00 600.00 50.00 1,200.00        
713-05-C temporary pavement legends and symbols (only) 12      EACH 25.00 300.00 60.00 720.00        
727-01 mobilization lump      LUMP 85,000.00 85,000.00 175,000.00 175,000.00        
731-02 reflectorized raised pavement markers 929      EACH 6.00 5,574.00 5.10 4,737.90        
732-01-A plastic pavement striping (4" width) 500      LNFT 0.50 250.00 0.50 250.00        
732-01-C plastic pavement striping (8" width) 1,950      LNFT 1.00 1,950.00 0.85 1,657.50        
732-01-E plastic pavement striping (24" width) 440      LNFT 2.00 880.00 3.25 1,430.00        
732-02-A plastic pavement striping (solid line) (4" width) 8.703  MILE 2,200.00 19,146.60 2,500.00 21,757.50        
732-03-A plastic pavement striping (broken line)(4" width) 4.572  MILE 800.00 3,657.60 700.00 3,200.40        
732-04-A plastic pavement legends & symbols (arrow) 12      EACH 180.00 2,160.00 175.00 2,100.00        
732-04-C plastic pavement legends & symbols (only) 6      EACH 190.00 1,140.00 200.00 1,200.00        
735-01 mailboxes 29      EACH 7.00 203.00 50.00 1,450.00        
735-02 mailbox supports (single) 29      EACH 126.00 3,654.00 175.00 5,075.00        
736-09 loop detector 1,500      LNFT 9.00 13,500.00 11.50 17,250.00        
736-10 underground junction box 8      EACH 256.00 2,048.00 255.00 2,040.00        
737-03-E painted traffic striping (solid line)(24" width) 21,876      LNFT 1.50 32,814.00 1.25 27,345.00        
740-01 construction layout lump      LUMP 5,000.00 5,000.00 20,000.00 20,000.00        
S-001 sawcutting 43,648      INFT 0.95 41,465.60 0.60 26,188.80        
S-002 dynamic message sign unit 3      EACH 3,200.00 9,600.00 7,000.00 21,000.00        
                       
 CONTRACTOR TOTAL       1,212,076.06   1,489,689.60        