| 202-02-H |
removal of guard rail
|
442   |
LNFT |
9.00 |
3,978.00 |
5.00 |
2,210.00 |
10.00 |
4,420.00 |
6.25 |
2,762.50 |
| 202-02-I |
removal of cattle guard
|
1   |
EACH |
4,348.91 |
4,348.91 |
1,000.00 |
1,000.00 |
6,000.00 |
6,000.00 |
437.50 |
437.50 |
| 203-07 |
borrow (vehicular measurement)
|
1,196   |
CUYD |
7.00 |
8,372.00 |
20.00 |
23,920.00 |
25.00 |
29,900.00 |
23.75 |
28,405.00 |
| 203-07-A |
borrow (vehicular meas.) (selected soils)
|
2,758   |
CUYD |
7.00 |
19,306.00 |
15.00 |
41,370.00 |
25.00 |
68,950.00 |
27.50 |
75,845.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
300   |
EACH |
25.00 |
7,500.00 |
100.00 |
30,000.00 |
185.00 |
55,500.00 |
187.50 |
56,250.00 |
| 204-06 |
temporary silt fencing
|
20,000   |
LNFT |
0.50 |
10,000.00 |
1.50 |
30,000.00 |
2.75 |
55,000.00 |
4.38 |
87,600.00 |
| 308-01-A |
in-place cement treated base course (12" thick)
|
67,046   |
SQYD |
6.00 |
402,276.00 |
6.50 |
435,799.00 |
7.50 |
502,845.00 |
8.75 |
586,652.50 |
| 308-02 |
removal of existing patches
|
1,953   |
SQYD |
0.10 |
195.30 |
8.00 |
15,624.00 |
11.25 |
21,971.25 |
8.75 |
17,088.75 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,697   |
CUYD |
10.00 |
16,970.00 |
45.00 |
76,365.00 |
22.50 |
38,182.50 |
75.00 |
127,275.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
35.00 |
17,500.00 |
30.00 |
15,000.00 |
68.00 |
34,000.00 |
75.00 |
37,500.00 |
| 502-01 |
superpave asphaltic concrete
|
12,414.3 |
TON |
68.00 |
844,172.40 |
78.00 |
968,315.40 |
79.00 |
980,729.70 |
106.25 |
1,319,019.38 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
918.0 |
TON |
1.00 |
918.00 |
100.00 |
91,800.00 |
150.00 |
137,700.00 |
156.25 |
143,437.50 |
| 509-01 |
cold planing asphaltic pavement
|
54,080   |
SQYD |
3.00 |
162,240.00 |
2.00 |
108,160.00 |
1.80 |
97,344.00 |
23.75 |
1,284,400.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,254   |
CUYD |
1.00 |
- 2,254.00 |
10.00 |
- 22,540.00 |
0.10 |
- 225.40 |
FREE |
FREE |
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
308   |
LNFT |
185.00 |
56,980.00 |
120.00 |
36,960.00 |
200.00 |
61,600.00 |
87.50 |
26,950.00 |
| 701-02-E |
cross drain pipe arch (30" equiv. rcpa)
|
648   |
LNFT |
210.00 |
136,080.00 |
125.00 |
81,000.00 |
220.00 |
142,560.00 |
106.25 |
68,850.00 |
| 701-02-G |
cross drain pipe arch (42" equiv. rcpa)
|
168   |
LNFT |
290.00 |
48,720.00 |
240.00 |
40,320.00 |
285.00 |
47,880.00 |
150.00 |
25,200.00 |
| 704-01-A |
guard rail (single thrie beam) (3'-1 1/2" post spacing)
|
100.0 |
LNFT |
55.00 |
5,500.00 |
50.00 |
5,000.00 |
33.00 |
3,300.00 |
45.00 |
4,500.00 |
| 704-03 |
blocked out guard rail
|
150.0 |
LNFT |
22.00 |
3,300.00 |
20.00 |
3,000.00 |
20.00 |
3,000.00 |
27.50 |
4,125.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,500.00 |
10,000.00 |
2,500.00 |
10,000.00 |
2,200.00 |
8,800.00 |
2,625.00 |
10,500.00 |
| 707-04 |
asphaltic curb
|
40.0 |
LNFT |
20.00 |
800.00 |
20.00 |
800.00 |
65.00 |
2,600.00 |
12.50 |
500.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
120,000.00 |
120,000.00 |
15,000.00 |
15,000.00 |
17,500.00 |
17,500.00 |
125,000.00 |
125,000.00 |
| 713-03-A |
temporary pavement markings (broken line) (4" width)
(4' length) |
13.710 |
MILE |
1.00 |
13.71 |
10.00 |
137.10 |
143.00 |
1,960.53 |
406.25 |
5,569.69 |
| 713-03-B |
temporary pavement markings (broken line) (4" width)
(10' length) |
12.450 |
MILE |
1.00 |
12.45 |
15.00 |
186.75 |
330.00 |
4,108.50 |
400.00 |
4,980.00 |
| 713-04-A |
temporary pavement markings (solid line) (4" width)
|
33.330 |
MILE |
1.00 |
33.33 |
30.00 |
999.90 |
660.00 |
21,997.80 |
781.25 |
26,039.06 |
| 716-01-A |
mulch (vegetative)
|
1.0 |
TON |
500.00 |
500.00 |
1,000.00 |
1,000.00 |
550.00 |
550.00 |
2,625.00 |
2,625.00 |
| 717-01 |
seeding
|
30   |
LB |
8.00 |
240.00 |
10.00 |
300.00 |
9.00 |
270.00 |
25.00 |
750.00 |
| 726-01 |
bedding material
|
416.3 |
CUYD |
10.00 |
4,163.00 |
110.00 |
45,793.00 |
100.00 |
41,630.00 |
81.25 |
33,824.38 |
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
140,000.00 |
140,000.00 |
145,000.00 |
145,000.00 |
312,500.00 |
312,500.00 |
| 729-16-C |
object marker assembly (type 3)
|
54   |
EACH |
90.00 |
4,860.00 |
90.00 |
4,860.00 |
80.00 |
4,320.00 |
103.75 |
5,602.50 |
| 731-02 |
reflectorized raised pavement markers
|
604   |
EACH |
5.60 |
3,382.40 |
5.50 |
3,322.00 |
5.00 |
3,020.00 |
8.75 |
5,285.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
11.110 |
MILE |
3,000.00 |
33,330.00 |
2,700.00 |
29,997.00 |
2,500.00 |
27,775.00 |
3,737.50 |
41,523.63 |
| 732-03-A |
plastic pavement striping (broken line) (4" width)
|
4.150 |
MILE |
850.00 |
3,527.50 |
800.00 |
3,320.00 |
800.00 |
3,320.00 |
1,125.00 |
4,668.75 |
| 735-01 |
mailboxes
|
30   |
EACH |
1.00 |
30.00 |
10.00 |
300.00 |
20.00 |
600.00 |
31.25 |
937.50 |
| 735-02 |
mailbox supports (single)
|
30   |
EACH |
75.00 |
2,250.00 |
120.00 |
3,600.00 |
180.00 |
5,400.00 |
237.50 |
7,125.00 |
| 739-01 |
hydro-seeding
|
6.65 |
ACRE |
1,000.00 |
6,650.00 |
900.00 |
5,985.00 |
1,000.00 |
6,650.00 |
2,500.00 |
16,625.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
26,000.00 |
26,000.00 |
10,000.00 |
10,000.00 |
30,000.00 |
30,000.00 |
81,250.00 |
81,250.00 |
| S-001 |
u-channel post installation
|
51   |
each |
55.00 |
2,805.00 |
100.00 |
5,100.00 |
55.00 |
2,805.00 |
68.75 |
3,506.25 |
| S-002 |
saw cutting of concrete/asphalt driveways and turnouts
(full depth) |
300   |
LNFT |
1.00 |
300.00 |
8.00 |
2,400.00 |
15.00 |
4,500.00 |
21.25 |
6,375.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,065,000.00 |
|
2,266,404.15 |
|
2,623,463.88 |
|
4,591,484.89 |
|