| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARBER BROS. CONTRACTING CO., L.L.C |
- 2 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 3 - COASTAL BRIDGE CO., L.L.C. |
- 4 - GILCHRIST CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-07 |
borrow (vehicular measurement)
|
500   |
CUYD |
10.00 |
5,000.00 |
10.00 |
5,000.00 |
20.00 |
10,000.00 |
20.00 |
10,000.00 |
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
200   |
CUYD |
5.00 |
1,000.00 |
10.00 |
2,000.00 |
20.00 |
4,000.00 |
22.00 |
4,400.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
25   |
EACH |
100.00 |
2,500.00 |
100.00 |
2,500.00 |
110.00 |
2,750.00 |
175.00 |
4,375.00 |
| 204-06 |
temporary silt fencing
|
1,210   |
LNFT |
2.00 |
2,420.00 |
1.75 |
2,117.50 |
2.00 |
2,420.00 |
2.00 |
2,420.00 |
| 304-01 |
lime
|
8.57 |
TON |
200.00 |
1,714.00 |
100.00 |
857.00 |
150.00 |
1,285.50 |
180.00 |
1,542.60 |
| 304-03-D |
lime treatment (type c) (12" thick)
|
907   |
SQYD |
3.00 |
2,721.00 |
3.00 |
2,721.00 |
2.00 |
1,814.00 |
7.00 |
6,349.00 |
| 304-05 |
lime treatment (type e)
|
25.71 |
TON |
200.00 |
5,142.00 |
200.00 |
5,142.00 |
300.00 |
7,713.00 |
450.00 |
11,569.50 |
| 308-01-A |
in-place cement treated base course (12" thick)
|
36,274   |
SQYD |
9.25 |
335,534.50 |
12.00 |
435,288.00 |
9.80 |
355,485.20 |
7.50 |
272,055.00 |
| 308-02 |
removal of existing patches
|
500   |
SQYD |
30.00 |
15,000.00 |
4.00 |
2,000.00 |
1.00 |
500.00 |
2.00 |
1,000.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
752   |
CUYD |
75.00 |
56,400.00 |
25.00 |
18,800.00 |
94.00 |
70,688.00 |
115.00 |
86,480.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
10.00 |
5,000.00 |
20.00 |
10,000.00 |
1.00 |
500.00 |
69.00 |
34,500.00 |
| 502-01 |
superpave asphaltic concrete
|
6,724.0 |
TON |
75.00 |
504,300.00 |
68.00 |
457,232.00 |
80.00 |
537,920.00 |
93.00 |
625,332.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
192.3 |
TON |
100.00 |
19,230.00 |
68.00 |
13,076.40 |
125.00 |
24,037.50 |
220.00 |
42,306.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
| 713-02-E |
temporary pavement markings (24" width)
|
66   |
LNFT |
2.00 |
132.00 |
0.40 |
26.40 |
1.00 |
66.00 |
1.00 |
66.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.376 |
MILE |
300.00 |
1,612.80 |
800.00 |
4,300.80 |
500.00 |
2,688.00 |
400.00 |
2,150.40 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.376 |
MILE |
400.00 |
2,150.40 |
10.00 |
53.76 |
350.00 |
1,881.60 |
1.00 |
5.38 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
13.882 |
MILE |
600.00 |
8,329.20 |
10.00 |
138.82 |
500.00 |
6,941.00 |
1.00 |
13.88 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
12,000.00 |
12,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
40,000.00 |
40,000.00 |
51,000.00 |
51,000.00 |
85,000.00 |
85,000.00 |
65,000.00 |
65,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
10   |
EACH |
100.00 |
1,000.00 |
60.00 |
600.00 |
70.00 |
700.00 |
110.00 |
1,100.00 |
| 731-02 |
reflectorized raised pavement markers
|
303   |
EACH |
6.00 |
1,818.00 |
7.00 |
2,121.00 |
5.50 |
1,666.50 |
5.90 |
1,787.70 |
| 732-01-E |
plastic pavement striping (24" width)
|
22   |
LNFT |
4.50 |
99.00 |
5.00 |
110.00 |
3.50 |
77.00 |
3.70 |
81.40 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.154 |
MILE |
3,000.00 |
18,462.00 |
3,000.00 |
18,462.00 |
2,800.00 |
17,231.20 |
3,000.00 |
18,462.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.792 |
MILE |
800.00 |
1,433.60 |
1,000.00 |
1,792.00 |
725.00 |
1,299.20 |
800.00 |
1,433.60 |
| 739-01 |
hydro-seeding
|
2.78 |
ACRE |
2,000.00 |
5,560.00 |
1,000.00 |
2,780.00 |
950.00 |
2,641.00 |
1,000.00 |
2,780.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
24,416.02 |
24,416.02 |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,102,558.50 |
|
1,122,534.70 |
|
1,189,304.70 |
|
1,247,209.46 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - W. E. MCDONALD & SON, LLC. |
- 6 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-07 |
borrow (vehicular measurement)
|
500   |
CUYD |
18.00 |
9,000.00 |
25.00 |
12,500.00 |
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
200   |
CUYD |
18.00 |
3,600.00 |
25.00 |
5,000.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
25   |
EACH |
500.00 |
12,500.00 |
650.00 |
16,250.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,210   |
LNFT |
7.00 |
8,470.00 |
6.00 |
7,260.00 |
|
|
|
|
| 304-01 |
lime
|
8.57 |
TON |
390.00 |
3,342.30 |
500.00 |
4,285.00 |
|
|
|
|
| 304-03-D |
lime treatment (type c) (12" thick)
|
907   |
SQYD |
25.00 |
22,675.00 |
30.00 |
27,210.00 |
|
|
|
|
| 304-05 |
lime treatment (type e)
|
25.71 |
TON |
1,200.00 |
30,852.00 |
1,200.00 |
30,852.00 |
|
|
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
36,274   |
SQYD |
8.30 |
301,074.20 |
10.20 |
369,994.80 |
|
|
|
|
| 308-02 |
removal of existing patches
|
500   |
SQYD |
20.00 |
10,000.00 |
19.00 |
9,500.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
752   |
CUYD |
115.00 |
86,480.00 |
135.00 |
101,520.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
1.00 |
500.00 |
135.00 |
67,500.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
6,724.0 |
TON |
103.00 |
692,572.00 |
95.00 |
638,780.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
192.3 |
TON |
205.00 |
39,421.50 |
200.00 |
38,460.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
16,000.00 |
16,000.00 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
66   |
LNFT |
25.00 |
1,650.00 |
0.75 |
49.50 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.376 |
MILE |
300.00 |
1,612.80 |
160.00 |
860.16 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.376 |
MILE |
300.00 |
1,612.80 |
350.00 |
1,881.60 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
13.882 |
MILE |
500.00 |
6,941.00 |
600.00 |
8,329.20 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
85,000.00 |
85,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
10   |
EACH |
95.00 |
950.00 |
100.00 |
1,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
303   |
EACH |
4.95 |
1,499.85 |
5.50 |
1,666.50 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
22   |
LNFT |
3.30 |
72.60 |
3.50 |
77.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.154 |
MILE |
2,500.00 |
15,385.00 |
2,500.00 |
15,385.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.792 |
MILE |
750.00 |
1,344.00 |
800.00 |
1,433.60 |
|
|
|
|
| 739-01 |
hydro-seeding
|
2.78 |
ACRE |
1,000.00 |
2,780.00 |
950.00 |
2,641.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
8,500.00 |
8,500.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,377,835.05 |
|
1,488,435.36 |
|
|
|
|
|