Lead Project: 823-29-0035
Parish: IBERIA
Routes: LA 674
Description: JCT. LA 14 - W. CITY LIMITS (CM)
Type Const: pccp patching
Estimated Construction Cost: $309,619.41
 
RankLicenseBidderConstruction Bid
1 21982 FORBY CONTRACTING, INC. $399,899.78
2 45210 CERES ENVIRONMENTAL SERVICES,INC. $530,637.88
3 46547 KNISH CORPORATION $825,160.47
 
Item Number Item Description Quantity Unit of Measure - 1 -
FORBY CONTRACTING, INC.
- 2 -
CERES ENVIRONMENTAL SERVICES,INC.
- 3 -
KNISH CORPORATION

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
302-02-E class ii base course (10" thick) 1,292.2    SQYD 20.00 25,844.00 23.75 30,689.75 10.00 12,922.00    
502-01 superpave asphaltic concrete 137.3    TON 355.00 48,741.50 281.25 38,615.63 250.00 34,325.00    
509-01 cold planing asphaltic pavement 1,248      SQYD 20.00 24,960.00 22.50 28,080.00 30.00 37,440.00    
509-02 contractor retained reclaimed asphaltic pavement - 69      CUYD 0.01 - 0.69 FREE FREE 1.00 - 69.00    
510-01-B pavement patching (12" minimum thickness) 125      SQYD 150.00 18,750.00 93.75 11,718.75 150.00 18,750.00    
602-05-G-01 full depth patching of jointed conc pvmt (8" thick)
(16.0 sq yds & under)
59.1    SQYD 150.00 8,865.00 200.00 11,820.00 400.00 23,640.00    
602-05-G-02 full depth patching of jointed conc pvmt (8" thick)
(16.1-48.0 sq yds)
196.5    SQYD 135.00 26,527.50 187.50 36,843.75 400.00 78,600.00    
602-05-G-03 full depth patching of jointed conc pvmt (8" thick)
(48.1 sq yds & over)
1,036.6    SQYD 125.00 129,575.00 175.00 181,405.00 375.00 388,725.00    
707-01 concrete curb 519.0    LNFT 15.00 7,785.00 15.00 7,785.00 25.00 12,975.00    
713-01 temporary signs & barricades lump      LUMP 25,000.00 25,000.00 17,500.00 17,500.00 100,000.00 100,000.00    
727-01 mobilization lump      LUMP 39,500.00 39,500.00 87,500.00 87,500.00 70,000.00 70,000.00    
731-02 reflectorized raised pavement markers 553      EACH 5.10 2,820.30 8.75 4,838.75 5.10 2,820.30    
732-01-B plastic pavement striping (6" width) 144      LNFT 0.68 97.92 2.50 360.00 0.68 97.92    
732-01-C plastic pavement striping (8" width) 1,035      LNFT 0.95 983.25 2.50 2,587.50 0.95 983.25    
732-02-A plastic pavement striping (solid line) (4" width) 5.600  MILE 2,310.00 12,936.00 3,625.00 20,300.00 2,310.00 12,936.00    
732-03-A plastic pavement striping (broken line)(4" width) 2.800  MILE 875.00 2,450.00 1,218.75 3,412.50 875.00 2,450.00    
732-04-A plastic pavement legends & symbols (arrow) 19      EACH 195.00 3,705.00 268.75 5,106.25 195.00 3,705.00    
732-04-C plastic pavement legends & symbols (only) 10      EACH 210.00 2,100.00 287.50 2,875.00 210.00 2,100.00    
732-04-D plastic pavement legends & symbols (rr crossing) 4      EACH 450.00 1,800.00 625.00 2,500.00 450.00 1,800.00    
732-05 removal of existing markings 2.800  MILE 5,700.00 15,960.00 7,750.00 21,700.00 5,700.00 15,960.00    
740-01 construction layout lump      LUMP 1,500.00 1,500.00 15,000.00 15,000.00 5,000.00 5,000.00    
                       
 CONTRACTOR TOTAL       399,899.78   530,637.88   825,160.47    