| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JOHN BAILEY, INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-I |
removal of median
|
1,617.1 |
SQYD |
23.00 |
37,193.30 |
|
|
|
|
|
|
| 202-02-J |
removal of tree (sta 43+06, 30" oak)
|
1   |
EACH |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
3,102.3 |
TON |
104.00 |
322,639.20 |
|
|
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
3,511   |
SQYD |
115.00 |
403,765.00 |
|
|
|
|
|
|
| 702-04-A |
adjusting manholes
|
14   |
EACH |
1,700.00 |
23,800.00 |
|
|
|
|
|
|
| 702-04-B |
adjusting catch basins
|
1   |
EACH |
1,500.00 |
1,500.00 |
|
|
|
|
|
|
| 702-04-D |
adjusting water valves
|
7   |
EACH |
1,000.00 |
7,000.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
85,000.00 |
85,000.00 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.377 |
MILE |
410.00 |
974.57 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
2.377 |
MILE |
740.00 |
1,758.98 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
20   |
EACH |
65.00 |
1,300.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
125,000.00 |
125,000.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
292   |
EACH |
7.00 |
2,044.00 |
|
|
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
236   |
LNFT |
1.85 |
436.60 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
156   |
LNFT |
4.00 |
624.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.377 |
MILE |
3,132.00 |
7,444.76 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.377 |
MILE |
950.00 |
2,258.15 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
20   |
EACH |
260.00 |
5,200.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| S-001 |
saw cutting for portland cement concrete pavement
removal |
50,445   |
INFT |
1.30 |
65,578.50 |
|
|
|
|
|
|
| S-002 |
milling portland cement concrete pavement
|
464   |
SQYD |
16.85 |
7,818.40 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,108,835.46 |
|
|
|
|
|
|
|