| DBE GOAL FED |
| Lead Project: 713-35-0115 |
| Parish: NATCHITOCHES |
| Routes: |
| Description: POSEY ROAD BRIDGE OVER POSEY BRANCH |
| Type Const:
removal of bridge, reinforced concrete box culverts, and related work.
|
| Estimated Construction Cost: $282,965.75 |
|
| |
| Rank | License | Bidder | Construction Bid |
| 1 | 28218 |
F. J. BURNELL, INC. | $189,249.50 |
| 2 | 32044 |
QUALITY DESIGN & CONSTRUCTION, INC. | $237,962.30 |
| 3 | 33685 |
SPECIALTY CONTRACTORS | $246,342.50 |
| 4 | 25088 |
RCS CONTRACTORS, INC. | $251,234.72 |
| 5 | 44111 |
CONSTRUCTING SOLUTIONS LLC | $265,649.50 |
| 6 | 18546 |
C W & W CONTRACTORS, INC. | $289,600.00 |
| 7 | 09090 |
GUINN BROTHERS, LLC. | $367,573.00 |
| 8 | 37477 |
VANTEL, INC | $399,681.00 |
| 9 | 45210 |
CERES ENVIRONMENTAL SERVICES,INC. | $445,166.26 |
| 10 | 44289 |
JEFF MERCER LLC | $464,746.20 |
|
| |
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - F. J. BURNELL, INC. |
- 2 - QUALITY DESIGN & CONSTRUCTION, INC. |
- 3 - SPECIALTY CONTRACTORS |
- 4 - RCS CONTRACTORS, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
10,000.00 |
10,000.00 |
10,100.00 |
10,100.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
| 202-02-A-01 |
removal of bridge(sta. 19+40.53; 22'wide x 39.38'long
|
1   |
EACH |
5,000.00 |
5,000.00 |
10,300.00 |
10,300.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
| 203-05 |
excavation & embankment
|
lump |
LUMP |
10,000.00 |
10,000.00 |
13,400.00 |
13,400.00 |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
| 204-02 |
temporary hay or straw bales
|
47   |
EACH |
10.00 |
470.00 |
14.00 |
658.00 |
5.00 |
235.00 |
18.00 |
846.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
100.00 |
800.00 |
187.00 |
1,496.00 |
125.00 |
1,000.00 |
150.00 |
1,200.00 |
| 204-06 |
temporary silt fencing
|
383   |
LNFT |
2.00 |
766.00 |
2.00 |
766.00 |
1.50 |
574.50 |
2.00 |
766.00 |
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
82.6 |
CUYD |
75.00 |
6,195.00 |
95.00 |
7,847.00 |
75.00 |
6,195.00 |
100.00 |
8,260.00 |
| 701-05-I |
side drain pipe (24")
|
160   |
LNFT |
50.00 |
8,000.00 |
30.00 |
4,800.00 |
40.00 |
6,400.00 |
75.00 |
12,000.00 |
| 705-01 |
barbed wire fence
|
100   |
LNFT |
7.00 |
700.00 |
7.40 |
740.00 |
8.00 |
800.00 |
7.00 |
700.00 |
| 711-01-D |
riprap (55 lb,18" thick )
|
186   |
SQYD |
50.00 |
9,300.00 |
122.00 |
22,692.00 |
75.00 |
13,950.00 |
49.00 |
9,114.00 |
| 711-04 |
geotextile fabric
|
186   |
SQYD |
2.50 |
465.00 |
3.40 |
632.40 |
2.00 |
372.00 |
2.00 |
372.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
6,000.00 |
6,000.00 |
8,400.00 |
8,400.00 |
3,000.00 |
3,000.00 |
7,500.00 |
7,500.00 |
| 716-01-A |
mulch (vegetative)
|
0.8 |
TON |
1,000.00 |
800.00 |
3,060.00 |
2,448.00 |
1,500.00 |
1,200.00 |
1,000.00 |
800.00 |
| 717-01 |
seeding
|
18   |
LB |
20.00 |
360.00 |
6.30 |
113.40 |
8.00 |
144.00 |
14.00 |
252.00 |
| 718-01 |
fertilizer
|
410   |
LB |
1.00 |
410.00 |
0.50 |
205.00 |
0.75 |
307.50 |
1.00 |
410.00 |
| 726-01 |
bedding material
|
137.5 |
CUYD |
85.00 |
11,687.50 |
107.00 |
14,712.50 |
75.00 |
10,312.50 |
100.00 |
13,750.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
17,000.00 |
17,000.00 |
10,200.00 |
10,200.00 |
5,000.00 |
5,000.00 |
12,000.00 |
12,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
100.00 |
400.00 |
81.00 |
324.00 |
200.00 |
800.00 |
75.00 |
300.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
2,000.00 |
2,000.00 |
5,200.00 |
5,200.00 |
2,500.00 |
2,500.00 |
3,500.00 |
3,500.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
26.64 |
CUYD |
1,000.00 |
26,640.00 |
840.00 |
22,377.60 |
1,500.00 |
39,960.00 |
1,669.00 |
44,462.16 |
| 805-12-M |
reinforced concrete box culverts (6'x 6')(precast
only,astm c1433) |
192.0 |
LNFT |
350.00 |
67,200.00 |
500.00 |
96,000.00 |
650.00 |
124,800.00 |
553.18 |
106,210.56 |
| 806-01 |
deformed reinforcing steel
|
2,528   |
LB |
2.00 |
5,056.00 |
1.80 |
4,550.40 |
1.50 |
3,792.00 |
1.50 |
3,792.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
189,249.50 |
|
237,962.30 |
|
246,342.50 |
|
251,234.72 |
|
| |
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - CONSTRUCTING SOLUTIONS LLC |
- 6 - C W & W CONTRACTORS, INC. |
- 7 - GUINN BROTHERS, LLC. |
- 8 - VANTEL, INC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
| 202-02-A-01 |
removal of bridge(sta. 19+40.53; 22'wide x 39.38'long
|
1   |
EACH |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
| 203-05 |
excavation & embankment
|
lump |
LUMP |
12,000.00 |
12,000.00 |
19,000.00 |
19,000.00 |
31,500.00 |
31,500.00 |
25,000.00 |
25,000.00 |
| 204-02 |
temporary hay or straw bales
|
47   |
EACH |
20.00 |
940.00 |
5.00 |
235.00 |
10.00 |
470.00 |
100.00 |
4,700.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
250.00 |
2,000.00 |
75.00 |
600.00 |
100.00 |
800.00 |
200.00 |
1,600.00 |
| 204-06 |
temporary silt fencing
|
383   |
LNFT |
5.00 |
1,915.00 |
3.00 |
1,149.00 |
5.00 |
1,915.00 |
2.00 |
766.00 |
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
82.6 |
CUYD |
100.00 |
8,260.00 |
90.00 |
7,434.00 |
125.00 |
10,325.00 |
150.00 |
12,390.00 |
| 701-05-I |
side drain pipe (24")
|
160   |
LNFT |
65.00 |
10,400.00 |
60.00 |
9,600.00 |
98.00 |
15,680.00 |
60.00 |
9,600.00 |
| 705-01 |
barbed wire fence
|
100   |
LNFT |
8.00 |
800.00 |
15.00 |
1,500.00 |
20.00 |
2,000.00 |
25.00 |
2,500.00 |
| 711-01-D |
riprap (55 lb,18" thick )
|
186   |
SQYD |
76.00 |
14,136.00 |
85.00 |
15,810.00 |
125.00 |
23,250.00 |
75.00 |
13,950.00 |
| 711-04 |
geotextile fabric
|
186   |
SQYD |
5.00 |
930.00 |
3.00 |
558.00 |
7.00 |
1,302.00 |
3.50 |
651.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
7,000.00 |
7,000.00 |
15,000.00 |
15,000.00 |
14,500.00 |
14,500.00 |
| 716-01-A |
mulch (vegetative)
|
0.8 |
TON |
2,000.00 |
1,600.00 |
3,000.00 |
2,400.00 |
5,000.00 |
4,000.00 |
5,000.00 |
4,000.00 |
| 717-01 |
seeding
|
18   |
LB |
25.00 |
450.00 |
40.00 |
720.00 |
50.00 |
900.00 |
8.00 |
144.00 |
| 718-01 |
fertilizer
|
410   |
LB |
1.00 |
410.00 |
2.00 |
820.00 |
4.00 |
1,640.00 |
1.00 |
410.00 |
| 726-01 |
bedding material
|
137.5 |
CUYD |
75.00 |
10,312.50 |
100.00 |
13,750.00 |
130.00 |
17,875.00 |
100.00 |
13,750.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
25,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
45,000.00 |
45,000.00 |
29,000.00 |
29,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
100.00 |
400.00 |
100.00 |
400.00 |
125.00 |
500.00 |
100.00 |
400.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
8,000.00 |
8,000.00 |
10,000.00 |
10,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
26.64 |
CUYD |
1,200.00 |
31,968.00 |
1,000.00 |
26,640.00 |
1,500.00 |
39,960.00 |
1,500.00 |
39,960.00 |
| 805-12-M |
reinforced concrete box culverts (6'x 6')(precast
only,astm c1433) |
192.0 |
LNFT |
550.00 |
105,600.00 |
700.00 |
134,400.00 |
598.00 |
114,816.00 |
865.00 |
166,080.00 |
| 806-01 |
deformed reinforcing steel
|
2,528   |
LB |
1.00 |
2,528.00 |
3.00 |
7,584.00 |
5.00 |
12,640.00 |
10.00 |
25,280.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
265,649.50 |
|
289,600.00 |
|
367,573.00 |
|
399,681.00 |
|
| |
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 9 - CERES ENVIRONMENTAL SERVICES,INC. |
- 10 - JEFF MERCER LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
18,750.00 |
18,750.00 |
45,000.00 |
45,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge(sta. 19+40.53; 22'wide x 39.38'long
|
1   |
EACH |
9,375.00 |
9,375.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 203-05 |
excavation & embankment
|
lump |
LUMP |
25,000.00 |
25,000.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
47   |
EACH |
25.00 |
1,175.00 |
18.00 |
846.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
312.50 |
2,500.00 |
150.00 |
1,200.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
383   |
LNFT |
5.00 |
1,915.00 |
1.80 |
689.40 |
|
|
|
|
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
82.6 |
CUYD |
75.00 |
6,195.00 |
85.00 |
7,021.00 |
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
160   |
LNFT |
100.00 |
16,000.00 |
78.00 |
12,480.00 |
|
|
|
|
| 705-01 |
barbed wire fence
|
100   |
LNFT |
23.75 |
2,375.00 |
15.00 |
1,500.00 |
|
|
|
|
| 711-01-D |
riprap (55 lb,18" thick )
|
186   |
SQYD |
70.00 |
13,020.00 |
70.00 |
13,020.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
186   |
SQYD |
8.13 |
1,512.18 |
2.00 |
372.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,625.00 |
10,625.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.8 |
TON |
2,500.00 |
2,000.00 |
730.00 |
584.00 |
|
|
|
|
| 717-01 |
seeding
|
18   |
LB |
25.00 |
450.00 |
8.50 |
153.00 |
|
|
|
|
| 718-01 |
fertilizer
|
410   |
LB |
3.75 |
1,537.50 |
0.58 |
237.80 |
|
|
|
|
| 726-01 |
bedding material
|
137.5 |
CUYD |
75.00 |
10,312.50 |
90.00 |
12,375.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
75,000.00 |
75,000.00 |
144,000.00 |
144,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
112.50 |
450.00 |
88.00 |
352.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
8,750.00 |
8,750.00 |
1,800.00 |
1,800.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
26.64 |
CUYD |
1,625.00 |
43,290.00 |
1,500.00 |
39,960.00 |
|
|
|
|
| 805-12-M |
reinforced concrete box culverts (6'x 6')(precast
only,astm c1433) |
192.0 |
LNFT |
987.50 |
189,600.00 |
550.00 |
105,600.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
2,528   |
LB |
2.11 |
5,334.08 |
2.00 |
5,056.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
445,166.26 |
|
464,746.20 |
|
|
|
|
|