Letting of 9/26/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-34-0105
Parish: MOREHOUSE
Routes:
Description: DOWD & WHITE AVENUES,YELDELL & VINEY ROAD BRIDGES
Type Const: grading, drainage structures, class ii base course, superpave asphaltic concrete
pavement, concrete slab span bridge and related work.
Estimated Construction Cost: $1,412,047.20
 
RankLicenseBidderConstruction Bid
1 14788 LOUISIANA BRIDGE, INC. $1,195,583.69
2 23112 BEN ALLEN, INC. $1,198,332.00
3 25088 RCS CONTRACTORS, INC. $1,384,830.15
 
Item Number Item Description Quantity Unit of Measure - 1 -
LOUISIANA BRIDGE, INC.
- 2 -
BEN ALLEN, INC.
- 3 -
RCS CONTRACTORS, INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 34,000.00 34,000.00 16,000.00 16,000.00 20,000.00 20,000.00    
202-02-A-01 removal of bridge(sta. 1+156.005,13.206m long x 7.450m
wide; 3-span timber bridge w/timber piles)
1      ea 7,500.00 7,500.00 3,500.00 3,500.00 20,000.00 20,000.00    
202-02-A-02 removal of bridge(sta. 1+158.000,17.624m long x 8.5m
wide; 3-span timber bridge w/timber piles)
1      ea 7,500.00 7,500.00 3,500.00 3,500.00 20,000.00 20,000.00    
202-02-A-03 removal of bridge(sta. 1+155.000,9.873m long x 7.145m
wide; 2-span timber bridge w/timber piles)
1      ea 7,500.00 7,500.00 10,000.00 10,000.00 20,000.00 20,000.00    
202-02-A-04 removal of bridge(sta. 1+154.700,9.102m long x 7.395m
wide; 2-span timber bridge w/timber piles)
1      ea 7,500.00 7,500.00 7,500.00 7,500.00 20,000.00 20,000.00    
202-02-G removal of surfacing & stabilized base 774.0    sq m 8.00 6,192.00 6.50 5,031.00 5.80 4,489.20    
203-05 excavation & embankment lump      lump 47,500.00 47,500.00 89,000.00 89,000.00 75,000.00 75,000.00    
204-02 temporary hay or straw bales 75      ea 8.00 600.00 0.00 0.00 10.00 750.00    
204-03 temporary slope drains 100      ln m 1.00 100.00 0.00 0.00 40.00 4,000.00    
204-05-A temporary sediment check dams (hay) 16      ea 85.50 1,368.00 0.00 0.00 400.00 6,400.00    
204-06 temporary silt fencing 125      ln m 5.75 718.75 0.00 0.00 6.00 750.00    
302-01 class ii base course 380.1    cu m 121.00 45,992.10 120.00 45,612.00 130.00 49,413.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
34      cu m 121.00 4,114.00 120.00 4,080.00 135.00 4,590.00    
403-01 aggregate roadway surfacing (vehicular measurement) 59.5    cu m 121.00 7,199.50 120.00 7,140.00 120.00 7,140.00    
502-01 superpave asphaltic concrete 348.4    Mg 200.00 69,680.00 195.00 67,938.00 250.00 87,100.00    
701-05-G side drain pipe (450 mm) 26.0    ln m 122.25 3,178.50 112.00 2,912.00 120.00 3,120.00    
701-05-G-01 side drain pipe (450 mm)(erosion) 26.0    ln m 122.25 3,178.50 112.00 2,912.00 120.00 3,120.00    
701-05-I side drain pipe (600 mm) 46.0    ln m 165.50 7,613.00 142.00 6,532.00 141.50 6,509.00    
701-05-I-01 side drain pipe (600 mm)(erosion) 46.0    ln m 165.50 7,613.00 142.00 6,532.00 141.50 6,509.00    
701-05-K side drain pipe (750 mm) 21.0    ln m 250.00 5,250.00 150.00 3,150.00 196.52 4,126.92    
701-05-K-01 side drain pipe (750 mm)(erosion) 21.0    ln m 250.00 5,250.00 150.00 3,150.00 196.52 4,126.92    
702-03-B catch basins (cb-02) 4      ea 3,500.00 14,000.00 3,500.00 14,000.00 3,700.00 14,800.00    
704-08-B guard rail transitions (double thrie beam) 30.48   ln m 195.50 5,958.84 150.00 4,572.00 159.50 4,861.56    
704-11-A guard rail end treatment (flared) 4      ea 2,270.00 9,080.00 2,600.00 10,400.00 2,750.00 11,000.00    
705-01 barbed wire fence 75      ln m 20.50 1,537.50 20.00 1,500.00 18.50 1,387.50    
711-01-D riprap (25 kg,460mm thick 405      sq m 74.00 29,970.00 78.00 31,590.00 49.00 19,845.00    
711-04 geotextile fabric 405      sq m 4.00 1,620.00 3.00 1,215.00 3.00 1,215.00    
713-01 temporary signs & barricades lump      lump 20,000.00 20,000.00 19,000.00 19,000.00 25,000.00 25,000.00    
716-01-A mulch (vegetative) 1,755.0    kg 1.00 1,755.00 1.00 1,755.00 2.00 3,510.00    
717-01 seeding 18      kg 20.50 369.00 100.00 1,800.00 38.50 693.00    
718-01 fertilizer 437      kg 1.25 546.25 4.00 1,748.00 2.75 1,201.75    
726-01 bedding material 359.4    cu m 230.00 82,662.00 80.00 28,752.00 135.00 48,519.00    
727-01 mobilization lump      lump 68,000.00 68,000.00 88,000.00 88,000.00 70,300.00 70,300.00    
729-16-B object marker assembly (type 2) 12      ea 74.00 888.00 75.00 900.00 71.50 858.00    
729-16-C object marker assembly (type 3) 4      ea 80.00 320.00 75.00 300.00 82.50 330.00    
740-01 construction layout lump      lump 11,000.00 11,000.00 12,000.00 12,000.00 25,000.00 25,000.00    
804-01-C precast concrete piles (400 mm) 380.0    ln m 200.00 76,000.00 195.00 74,100.00 205.66 78,150.80    
804-12 loading permanent piles 1      ea 1.00 1.00 0.00 0.00 11,000.00 11,000.00    
805-01-B class a concrete (box culvert headwalls) 106.35   cu m 1,475.00 156,866.25 1,310.00 139,318.50 1,600.00 170,160.00    
805-10-A bridge superstructure & substructure(8.5m clear
roadway, 45 degree crossing)(cip bents)
4      span 27,000.00 108,000.00 28,500.00 114,000.00 27,500.00 110,000.00    
805-12-I reinforced concrete box culverts (1500 mm x 1500 mm) 50.00   ln m 1,450.00 72,500.00 1,650.00 82,500.00 2,100.00 105,000.00    
805-12-S reinforced concrete box culverts (2400 mm x 2400 mm) 103.10   ln m 2,100.00 216,510.00 2,400.00 247,440.00 2,675.00 275,792.50    
806-01 deformed reinforcing steel 6,381      kg 2.50 15,952.50 2.50 15,952.50 2.00 12,762.00    
S-101 concrete approach slabs(8.5m clear roadway; 45 degree
crossing)
2      ea 9,500.00 19,000.00 8,500.00 17,000.00 9,400.00 18,800.00    
S-102 vibration monitoring(for all pile driving operations) lump      lump 3,500.00 3,500.00 6,000.00 6,000.00 7,500.00 7,500.00    
                       
 CONTRACTOR TOTAL       1,195,583.69   1,198,332.00   1,384,830.15    