| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - LOUISIANA BRIDGE, INC. |
- 2 - BEN ALLEN, INC. |
- 3 - RCS CONTRACTORS, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
34,000.00 |
34,000.00 |
16,000.00 |
16,000.00 |
20,000.00 |
20,000.00 |
|
|
| 202-02-A-01 |
removal of bridge(sta. 1+156.005,13.206m long x 7.450m
wide; 3-span timber bridge w/timber piles) |
1   |
ea |
7,500.00 |
7,500.00 |
3,500.00 |
3,500.00 |
20,000.00 |
20,000.00 |
|
|
| 202-02-A-02 |
removal of bridge(sta. 1+158.000,17.624m long x 8.5m
wide; 3-span timber bridge w/timber piles) |
1   |
ea |
7,500.00 |
7,500.00 |
3,500.00 |
3,500.00 |
20,000.00 |
20,000.00 |
|
|
| 202-02-A-03 |
removal of bridge(sta. 1+155.000,9.873m long x 7.145m
wide; 2-span timber bridge w/timber piles) |
1   |
ea |
7,500.00 |
7,500.00 |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
|
|
| 202-02-A-04 |
removal of bridge(sta. 1+154.700,9.102m long x 7.395m
wide; 2-span timber bridge w/timber piles) |
1   |
ea |
7,500.00 |
7,500.00 |
7,500.00 |
7,500.00 |
20,000.00 |
20,000.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
774.0 |
sq m |
8.00 |
6,192.00 |
6.50 |
5,031.00 |
5.80 |
4,489.20 |
|
|
| 203-05 |
excavation & embankment
|
lump |
lump |
47,500.00 |
47,500.00 |
89,000.00 |
89,000.00 |
75,000.00 |
75,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
75   |
ea |
8.00 |
600.00 |
0.00 |
0.00 |
10.00 |
750.00 |
|
|
| 204-03 |
temporary slope drains
|
100   |
ln m |
1.00 |
100.00 |
0.00 |
0.00 |
40.00 |
4,000.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
16   |
ea |
85.50 |
1,368.00 |
0.00 |
0.00 |
400.00 |
6,400.00 |
|
|
| 204-06 |
temporary silt fencing
|
125   |
ln m |
5.75 |
718.75 |
0.00 |
0.00 |
6.00 |
750.00 |
|
|
| 302-01 |
class ii base course
|
380.1 |
cu m |
121.00 |
45,992.10 |
120.00 |
45,612.00 |
130.00 |
49,413.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
34   |
cu m |
121.00 |
4,114.00 |
120.00 |
4,080.00 |
135.00 |
4,590.00 |
|
|
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
59.5 |
cu m |
121.00 |
7,199.50 |
120.00 |
7,140.00 |
120.00 |
7,140.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
348.4 |
Mg |
200.00 |
69,680.00 |
195.00 |
67,938.00 |
250.00 |
87,100.00 |
|
|
| 701-05-G |
side drain pipe (450 mm)
|
26.0 |
ln m |
122.25 |
3,178.50 |
112.00 |
2,912.00 |
120.00 |
3,120.00 |
|
|
| 701-05-G-01 |
side drain pipe (450 mm)(erosion)
|
26.0 |
ln m |
122.25 |
3,178.50 |
112.00 |
2,912.00 |
120.00 |
3,120.00 |
|
|
| 701-05-I |
side drain pipe (600 mm)
|
46.0 |
ln m |
165.50 |
7,613.00 |
142.00 |
6,532.00 |
141.50 |
6,509.00 |
|
|
| 701-05-I-01 |
side drain pipe (600 mm)(erosion)
|
46.0 |
ln m |
165.50 |
7,613.00 |
142.00 |
6,532.00 |
141.50 |
6,509.00 |
|
|
| 701-05-K |
side drain pipe (750 mm)
|
21.0 |
ln m |
250.00 |
5,250.00 |
150.00 |
3,150.00 |
196.52 |
4,126.92 |
|
|
| 701-05-K-01 |
side drain pipe (750 mm)(erosion)
|
21.0 |
ln m |
250.00 |
5,250.00 |
150.00 |
3,150.00 |
196.52 |
4,126.92 |
|
|
| 702-03-B |
catch basins (cb-02)
|
4   |
ea |
3,500.00 |
14,000.00 |
3,500.00 |
14,000.00 |
3,700.00 |
14,800.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
30.48 |
ln m |
195.50 |
5,958.84 |
150.00 |
4,572.00 |
159.50 |
4,861.56 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
ea |
2,270.00 |
9,080.00 |
2,600.00 |
10,400.00 |
2,750.00 |
11,000.00 |
|
|
| 705-01 |
barbed wire fence
|
75   |
ln m |
20.50 |
1,537.50 |
20.00 |
1,500.00 |
18.50 |
1,387.50 |
|
|
| 711-01-D |
riprap (25 kg,460mm thick
|
405   |
sq m |
74.00 |
29,970.00 |
78.00 |
31,590.00 |
49.00 |
19,845.00 |
|
|
| 711-04 |
geotextile fabric
|
405   |
sq m |
4.00 |
1,620.00 |
3.00 |
1,215.00 |
3.00 |
1,215.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
20,000.00 |
20,000.00 |
19,000.00 |
19,000.00 |
25,000.00 |
25,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
1,755.0 |
kg |
1.00 |
1,755.00 |
1.00 |
1,755.00 |
2.00 |
3,510.00 |
|
|
| 717-01 |
seeding
|
18   |
kg |
20.50 |
369.00 |
100.00 |
1,800.00 |
38.50 |
693.00 |
|
|
| 718-01 |
fertilizer
|
437   |
kg |
1.25 |
546.25 |
4.00 |
1,748.00 |
2.75 |
1,201.75 |
|
|
| 726-01 |
bedding material
|
359.4 |
cu m |
230.00 |
82,662.00 |
80.00 |
28,752.00 |
135.00 |
48,519.00 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
68,000.00 |
68,000.00 |
88,000.00 |
88,000.00 |
70,300.00 |
70,300.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
12   |
ea |
74.00 |
888.00 |
75.00 |
900.00 |
71.50 |
858.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
ea |
80.00 |
320.00 |
75.00 |
300.00 |
82.50 |
330.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
11,000.00 |
11,000.00 |
12,000.00 |
12,000.00 |
25,000.00 |
25,000.00 |
|
|
| 804-01-C |
precast concrete piles (400 mm)
|
380.0 |
ln m |
200.00 |
76,000.00 |
195.00 |
74,100.00 |
205.66 |
78,150.80 |
|
|
| 804-12 |
loading permanent piles
|
1   |
ea |
1.00 |
1.00 |
0.00 |
0.00 |
11,000.00 |
11,000.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
106.35 |
cu m |
1,475.00 |
156,866.25 |
1,310.00 |
139,318.50 |
1,600.00 |
170,160.00 |
|
|
| 805-10-A |
bridge superstructure & substructure(8.5m clear
roadway, 45 degree crossing)(cip bents) |
4   |
span |
27,000.00 |
108,000.00 |
28,500.00 |
114,000.00 |
27,500.00 |
110,000.00 |
|
|
| 805-12-I |
reinforced concrete box culverts (1500 mm x 1500 mm)
|
50.00 |
ln m |
1,450.00 |
72,500.00 |
1,650.00 |
82,500.00 |
2,100.00 |
105,000.00 |
|
|
| 805-12-S |
reinforced concrete box culverts (2400 mm x 2400 mm)
|
103.10 |
ln m |
2,100.00 |
216,510.00 |
2,400.00 |
247,440.00 |
2,675.00 |
275,792.50 |
|
|
| 806-01 |
deformed reinforcing steel
|
6,381   |
kg |
2.50 |
15,952.50 |
2.50 |
15,952.50 |
2.00 |
12,762.00 |
|
|
| S-101 |
concrete approach slabs(8.5m clear roadway; 45 degree
crossing) |
2   |
ea |
9,500.00 |
19,000.00 |
8,500.00 |
17,000.00 |
9,400.00 |
18,800.00 |
|
|
| S-102 |
vibration monitoring(for all pile driving operations)
|
lump |
lump |
3,500.00 |
3,500.00 |
6,000.00 |
6,000.00 |
7,500.00 |
7,500.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,195,583.69 |
|
1,198,332.00 |
|
1,384,830.15 |
|
|
|