| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-G |
removal of surfacing & stabilized base
|
3,810.1 |
SQYD |
10.00 |
38,101.00 |
11.00 |
41,911.10 |
14.00 |
53,341.40 |
|
|
| 202-02-H |
removal of guard rail
|
5,265   |
LNFT |
3.00 |
15,795.00 |
5.00 |
26,325.00 |
4.00 |
21,060.00 |
|
|
| 203-01 |
general excavation
|
633   |
CUYD |
15.00 |
9,495.00 |
21.00 |
13,293.00 |
53.00 |
33,549.00 |
|
|
| 203-07-B |
borrow (vehicular measurement)(plastic soil)
|
20,000   |
CUYD |
15.50 |
310,000.00 |
21.00 |
420,000.00 |
25.00 |
500,000.00 |
|
|
| 204-06 |
temporary silt fencing
|
111,302   |
LNFT |
1.50 |
166,953.00 |
1.50 |
166,953.00 |
1.50 |
166,953.00 |
|
|
| 302-02-G |
class ii base course (16" thick)
|
3,801.0 |
SQYD |
50.00 |
190,050.00 |
50.00 |
190,050.00 |
39.00 |
148,239.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
74,459.3 |
TON |
80.00 |
5,956,744.00 |
74.00 |
5,509,988.20 |
110.00 |
8,190,523.00 |
|
|
| 508-01 |
asphalt concrete (sma) wearing course
|
34,916.0 |
TON |
100.00 |
3,491,600.00 |
96.00 |
3,351,936.00 |
135.00 |
4,713,660.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
489,680   |
SQYD |
1.50 |
734,520.00 |
2.80 |
1,371,104.00 |
4.00 |
1,958,720.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 13,602   |
CUYD |
10.00 |
- 136,020.00 |
4.00 |
- 54,408.00 |
0.10 |
- 1,360.20 |
|
|
| 510-01-D |
pavement patching (18" minimum thickness)
|
300   |
SQYD |
250.00 |
75,000.00 |
200.00 |
60,000.00 |
400.00 |
120,000.00 |
|
|
| 701-15 |
concrete collar
|
46   |
EACH |
500.00 |
23,000.00 |
1,200.00 |
55,200.00 |
1,000.00 |
46,000.00 |
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
500.0 |
LNFT |
45.00 |
22,500.00 |
46.00 |
23,000.00 |
50.00 |
25,000.00 |
|
|
| 704-03 |
blocked out guard rail
|
3,300.0 |
LNFT |
20.00 |
66,000.00 |
19.00 |
62,700.00 |
20.00 |
66,000.00 |
|
|
| 704-06 |
guard rail anchor sections (trailing end)
|
25.0 |
LNFT |
80.00 |
2,000.00 |
70.00 |
1,750.00 |
80.00 |
2,000.00 |
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
25.0 |
LNFT |
90.00 |
2,250.00 |
87.00 |
2,175.00 |
90.00 |
2,250.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
400.0 |
LNFT |
60.00 |
24,000.00 |
53.00 |
21,200.00 |
60.00 |
24,000.00 |
|
|
| 704-10 |
guard rail anchor block
|
16   |
EACH |
900.00 |
14,400.00 |
2,000.00 |
32,000.00 |
850.00 |
13,600.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
24   |
EACH |
2,000.00 |
48,000.00 |
2,000.00 |
48,000.00 |
2,000.00 |
48,000.00 |
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
1,348.2 |
SQYD |
60.00 |
80,892.00 |
56.00 |
75,499.20 |
55.00 |
74,151.00 |
|
|
| 707-04 |
asphaltic curb
|
160.0 |
LNFT |
30.00 |
4,800.00 |
60.00 |
9,600.00 |
76.00 |
12,160.00 |
|
|
| 710-01 |
flowable fill
|
50   |
CUYD |
150.00 |
7,500.00 |
300.00 |
15,000.00 |
165.00 |
8,250.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
200,000.00 |
200,000.00 |
660,000.00 |
660,000.00 |
1,885,000.00 |
1,885,000.00 |
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
8,427   |
LNFT |
0.30 |
2,528.10 |
0.30 |
2,528.10 |
0.35 |
2,949.45 |
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
3,198   |
LNFT |
1.00 |
3,198.00 |
0.90 |
2,878.20 |
1.00 |
3,198.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
63.237 |
MILE |
10.00 |
632.37 |
200.00 |
12,647.40 |
95.00 |
6,007.52 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
63.237 |
MILE |
15.00 |
948.56 |
200.00 |
12,647.40 |
250.00 |
15,809.25 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
135.279 |
MILE |
30.00 |
4,058.37 |
300.00 |
40,583.70 |
500.00 |
67,639.50 |
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
12   |
EACH |
50.00 |
600.00 |
50.00 |
600.00 |
40.00 |
480.00 |
|
|
| 713-05-C |
temporary pavement legends and symbols (only)
|
12   |
EACH |
50.00 |
600.00 |
50.00 |
600.00 |
50.00 |
600.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
700,000.00 |
700,000.00 |
1,100,000.00 |
1,100,000.00 |
2,100,000.00 |
2,100,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
68   |
EACH |
70.00 |
4,760.00 |
70.00 |
4,760.00 |
70.00 |
4,760.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
32   |
EACH |
80.00 |
2,560.00 |
80.00 |
2,560.00 |
80.00 |
2,560.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
4,133   |
EACH |
5.50 |
22,731.50 |
5.40 |
22,318.20 |
6.00 |
24,798.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
2,809   |
LNFT |
1.00 |
2,809.00 |
1.00 |
2,809.00 |
1.00 |
2,809.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
1,066   |
LNFT |
4.00 |
4,264.00 |
4.00 |
4,264.00 |
4.50 |
4,797.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
45.093 |
MILE |
2,800.00 |
126,260.40 |
2,800.00 |
126,260.40 |
3,000.00 |
135,279.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
21.079 |
MILE |
800.00 |
16,863.20 |
800.00 |
16,863.20 |
1,000.00 |
21,079.00 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
4   |
EACH |
250.00 |
1,000.00 |
300.00 |
1,200.00 |
250.00 |
1,000.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
4   |
EACH |
300.00 |
1,200.00 |
300.00 |
1,200.00 |
300.00 |
1,200.00 |
|
|
| 732-05 |
removal of existing markings
|
1.500 |
MILE |
6,000.00 |
9,000.00 |
7,000.00 |
10,500.00 |
6,000.00 |
9,000.00 |
|
|
| 736-09 |
loop detector
|
300   |
LNFT |
15.00 |
4,500.00 |
20.00 |
6,000.00 |
17.00 |
5,100.00 |
|
|
| 737-03-D |
painted traffic striping (solid line)(12" width)
|
348   |
LNFT |
7.00 |
2,436.00 |
8.00 |
2,784.00 |
8.00 |
2,784.00 |
|
|
| 739-01 |
hydro-seeding
|
30.00 |
ACRE |
1,000.00 |
30,000.00 |
1,400.00 |
42,000.00 |
1,200.00 |
36,000.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
12,000.00 |
12,000.00 |
400,000.00 |
400,000.00 |
250,000.00 |
250,000.00 |
|
|
| S-001 |
rumble strips (ground-in)
|
41.1 |
MILE |
500.00 |
20,550.00 |
700.00 |
28,770.00 |
750.00 |
30,825.00 |
|
|
| S-002 |
concrete apron
|
47   |
EACH |
1,400.00 |
65,800.00 |
2,000.00 |
94,000.00 |
1,250.00 |
58,750.00 |
|
|
| S-003 |
exposing existing r.c. pipe
|
236   |
LNFT |
50.00 |
11,800.00 |
80.00 |
18,880.00 |
22.00 |
5,192.00 |
|
|
| S-004 |
dynamic message sign unit
|
6   |
EACH |
26,000.00 |
156,000.00 |
30,000.00 |
180,000.00 |
25,000.00 |
150,000.00 |
|
|
| S-005 |
remove and relocate sign posts and footings
|
2   |
EACH |
1,250.00 |
2,500.00 |
8,000.00 |
16,000.00 |
1,400.00 |
2,800.00 |
|
|
| S-101 |
barrier rail rehabilitation
|
4,432   |
LNFT |
40.00 |
177,280.00 |
36.00 |
159,552.00 |
38.00 |
168,416.00 |
|
|
| S-465 |
one cycle mowing (approximately 186 acres)
|
3   |
EACH |
6,000.00 |
18,000.00 |
15,000.00 |
45,000.00 |
12,000.00 |
36,000.00 |
|
|
| S-466 |
one cycle litter (approximately 186 acres)
|
3   |
EACH |
1,000.00 |
3,000.00 |
7,000.00 |
21,000.00 |
7,000.00 |
21,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
12,755,459.50 |
|
14,482,482.10 |
|
21,281,928.92 |
|
|
|