Lead Project: 454-04-0071
Parish: ST TAMMANY
Routes: I-12
Description: JCT. US 190 (COVINGTON) - BAYOU LACOMBE
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete pavement,
pavement patching, pavement widening, and related work.
Estimated Construction Cost: $13,212,647.05
 
RankLicenseBidderConstruction Bid
1 02179 BOH BROS. CONSTRUCTION CO., LLC. $12,755,459.50
2 06276 BARRIERE CONSTRUCTION CO., LLC. $14,482,482.10
3 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $21,281,928.92
 
Item Number Item Description Quantity Unit of Measure - 1 -
BOH BROS. CONSTRUCTION CO., LLC.
- 2 -
BARRIERE CONSTRUCTION CO., LLC.
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-G removal of surfacing & stabilized base 3,810.1    SQYD 10.00 38,101.00 11.00 41,911.10 14.00 53,341.40    
202-02-H removal of guard rail 5,265      LNFT 3.00 15,795.00 5.00 26,325.00 4.00 21,060.00    
203-01 general excavation 633      CUYD 15.00 9,495.00 21.00 13,293.00 53.00 33,549.00    
203-07-B borrow (vehicular measurement)(plastic soil) 20,000      CUYD 15.50 310,000.00 21.00 420,000.00 25.00 500,000.00    
204-06 temporary silt fencing 111,302      LNFT 1.50 166,953.00 1.50 166,953.00 1.50 166,953.00    
302-02-G class ii base course (16" thick) 3,801.0    SQYD 50.00 190,050.00 50.00 190,050.00 39.00 148,239.00    
502-01 superpave asphaltic concrete 74,459.3    TON 80.00 5,956,744.00 74.00 5,509,988.20 110.00 8,190,523.00    
508-01 asphalt concrete (sma) wearing course 34,916.0    TON 100.00 3,491,600.00 96.00 3,351,936.00 135.00 4,713,660.00    
509-01 cold planing asphaltic pavement 489,680      SQYD 1.50 734,520.00 2.80 1,371,104.00 4.00 1,958,720.00    
509-02 contractor retained reclaimed asphaltic pavement - 13,602      CUYD 10.00 - 136,020.00 4.00 - 54,408.00 0.10 - 1,360.20    
510-01-D pavement patching (18" minimum thickness) 300      SQYD 250.00 75,000.00 200.00 60,000.00 400.00 120,000.00    
701-15 concrete collar 46      EACH 500.00 23,000.00 1,200.00 55,200.00 1,000.00 46,000.00    
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 500.0    LNFT 45.00 22,500.00 46.00 23,000.00 50.00 25,000.00    
704-03 blocked out guard rail 3,300.0    LNFT 20.00 66,000.00 19.00 62,700.00 20.00 66,000.00    
704-06 guard rail anchor sections (trailing end) 25.0    LNFT 80.00 2,000.00 70.00 1,750.00 80.00 2,000.00    
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
25.0    LNFT 90.00 2,250.00 87.00 2,175.00 90.00 2,250.00    
704-08-B guard rail transitions (double thrie beam) 400.0    LNFT 60.00 24,000.00 53.00 21,200.00 60.00 24,000.00    
704-10 guard rail anchor block 16      EACH 900.00 14,400.00 2,000.00 32,000.00 850.00 13,600.00    
704-11-A guard rail end treatment (flared) 24      EACH 2,000.00 48,000.00 2,000.00 48,000.00 2,000.00 48,000.00    
706-03-A incidental concrete paving (4" thick) 1,348.2    SQYD 60.00 80,892.00 56.00 75,499.20 55.00 74,151.00    
707-04 asphaltic curb 160.0    LNFT 30.00 4,800.00 60.00 9,600.00 76.00 12,160.00    
710-01 flowable fill 50      CUYD 150.00 7,500.00 300.00 15,000.00 165.00 8,250.00    
713-01 temporary signs & barricades lump      LUMP 200,000.00 200,000.00 660,000.00 660,000.00 1,885,000.00 1,885,000.00    
713-02-C temporary pavement markings (8" width) 8,427      LNFT 0.30 2,528.10 0.30 2,528.10 0.35 2,949.45    
713-02-E temporary pavement markings (24" width) 3,198      LNFT 1.00 3,198.00 0.90 2,878.20 1.00 3,198.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
63.237  MILE 10.00 632.37 200.00 12,647.40 95.00 6,007.52    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
63.237  MILE 15.00 948.56 200.00 12,647.40 250.00 15,809.25    
713-04-A temporary pavement markings (solid line)(4" width) 135.279  MILE 30.00 4,058.37 300.00 40,583.70 500.00 67,639.50    
713-05-A temporary pavement legends and symbols (arrow) 12      EACH 50.00 600.00 50.00 600.00 40.00 480.00    
713-05-C temporary pavement legends and symbols (only) 12      EACH 50.00 600.00 50.00 600.00 50.00 600.00    
727-01 mobilization lump      LUMP 700,000.00 700,000.00 1,100,000.00 1,100,000.00 2,100,000.00 2,100,000.00    
729-16-B object marker assembly (type 2) 68      EACH 70.00 4,760.00 70.00 4,760.00 70.00 4,760.00    
729-16-C object marker assembly (type 3) 32      EACH 80.00 2,560.00 80.00 2,560.00 80.00 2,560.00    
731-02 reflectorized raised pavement markers 4,133      EACH 5.50 22,731.50 5.40 22,318.20 6.00 24,798.00    
732-01-C plastic pavement striping (8" width) 2,809      LNFT 1.00 2,809.00 1.00 2,809.00 1.00 2,809.00    
732-01-E plastic pavement striping (24" width) 1,066      LNFT 4.00 4,264.00 4.00 4,264.00 4.50 4,797.00    
732-02-A plastic pavement striping (solid line) (4" width) 45.093  MILE 2,800.00 126,260.40 2,800.00 126,260.40 3,000.00 135,279.00    
732-03-A plastic pavement striping (broken line)(4" width) 21.079  MILE 800.00 16,863.20 800.00 16,863.20 1,000.00 21,079.00    
732-04-A plastic pavement legends & symbols (arrow) 4      EACH 250.00 1,000.00 300.00 1,200.00 250.00 1,000.00    
732-04-C plastic pavement legends & symbols (only) 4      EACH 300.00 1,200.00 300.00 1,200.00 300.00 1,200.00    
732-05 removal of existing markings 1.500  MILE 6,000.00 9,000.00 7,000.00 10,500.00 6,000.00 9,000.00    
736-09 loop detector 300      LNFT 15.00 4,500.00 20.00 6,000.00 17.00 5,100.00    
737-03-D painted traffic striping (solid line)(12" width) 348      LNFT 7.00 2,436.00 8.00 2,784.00 8.00 2,784.00    
739-01 hydro-seeding 30.00   ACRE 1,000.00 30,000.00 1,400.00 42,000.00 1,200.00 36,000.00    
740-01 construction layout lump      LUMP 12,000.00 12,000.00 400,000.00 400,000.00 250,000.00 250,000.00    
S-001 rumble strips (ground-in) 41.1    MILE 500.00 20,550.00 700.00 28,770.00 750.00 30,825.00    
S-002 concrete apron 47      EACH 1,400.00 65,800.00 2,000.00 94,000.00 1,250.00 58,750.00    
S-003 exposing existing r.c. pipe 236      LNFT 50.00 11,800.00 80.00 18,880.00 22.00 5,192.00    
S-004 dynamic message sign unit 6      EACH 26,000.00 156,000.00 30,000.00 180,000.00 25,000.00 150,000.00    
S-005 remove and relocate sign posts and footings 2      EACH 1,250.00 2,500.00 8,000.00 16,000.00 1,400.00 2,800.00    
S-101 barrier rail rehabilitation 4,432      LNFT 40.00 177,280.00 36.00 159,552.00 38.00 168,416.00    
S-465 one cycle mowing (approximately 186 acres) 3      EACH 6,000.00 18,000.00 15,000.00 45,000.00 12,000.00 36,000.00    
S-466 one cycle litter (approximately 186 acres) 3      EACH 1,000.00 3,000.00 7,000.00 21,000.00 7,000.00 21,000.00    
                       
 CONTRACTOR TOTAL       12,755,459.50   14,482,482.10   21,281,928.92    