| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - BENTON & BROWN, LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-C |
removal of portland cement concrete pavement
|
1,760   |
SQYD |
50.00 |
88,000.00 |
30.00 |
52,800.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
657.0 |
LNFT |
8.00 |
5,256.00 |
9.50 |
6,241.50 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
4,654.5 |
SQYD |
5.00 |
23,272.50 |
16.00 |
74,472.00 |
|
|
|
|
| 202-02-I |
removal of concrete revetment
|
377.0 |
SQYD |
15.00 |
5,655.00 |
12.00 |
4,524.00 |
|
|
|
|
| 202-02-J |
remove existing sign support
|
83   |
EACH |
175.00 |
14,525.00 |
190.00 |
15,770.00 |
|
|
|
|
| 202-02-K |
removal of reinforced concrete headwalls
|
1   |
EACH |
2,500.00 |
2,500.00 |
5,400.00 |
5,400.00 |
|
|
|
|
| 202-02-L |
remove existing sign
|
99   |
EACH |
60.00 |
5,940.00 |
125.00 |
12,375.00 |
|
|
|
|
| 203-01 |
general excavation
|
775   |
CUYD |
20.00 |
15,500.00 |
30.00 |
23,250.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
48,315   |
CUYD |
8.50 |
410,677.50 |
16.00 |
773,040.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
300.00 |
1,200.00 |
240.00 |
960.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
124,276.7 |
TON |
70.00 |
8,699,369.00 |
85.00 |
10,563,519.50 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
69,617   |
SQYD |
1.50 |
104,425.50 |
2.00 |
139,234.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,001   |
CUYD |
1.00 |
- 3,001.00 |
1.00 |
- 3,001.00 |
|
|
|
|
| 601-01-G |
portland cement concrete pavement (8" thick)
|
365.2 |
SQYD |
90.00 |
32,868.00 |
105.00 |
38,346.00 |
|
|
|
|
| 601-01-I |
portland cement concrete pavement (9" thick)
|
914.6 |
SQYD |
95.00 |
86,887.00 |
115.00 |
105,179.00 |
|
|
|
|
| 602-05-G-02 |
full depth patching of jointed conc pvmt (8" thick)
(16.1-48.0 sq yds) |
58.4 |
SQYD |
135.00 |
7,884.00 |
160.00 |
9,344.00 |
|
|
|
|
| 602-05-G-03 |
full depth patching of jointed conc pvmt (8" thick)
(48.1 sq yds & over) |
629.3 |
SQYD |
115.00 |
72,369.50 |
140.00 |
88,102.00 |
|
|
|
|
| 602-05-I-01 |
full depth patching of jointed conc pvmt (9" thick)
(16.0 sq yds & under) |
169.8 |
SQYD |
135.00 |
22,923.00 |
160.00 |
27,168.00 |
|
|
|
|
| 602-05-I-02 |
full depth patching of jointed conc pvmt (9" thick)
(16.1 - 48.0 sq yds) |
408.7 |
SQYD |
125.00 |
51,087.50 |
150.00 |
61,305.00 |
|
|
|
|
| 602-05-I-03 |
full depth patching of jointed conc pvmt (9" thick)
(48.1 sq yds & over) |
1,455.1 |
SQYD |
105.00 |
152,785.50 |
125.00 |
181,887.50 |
|
|
|
|
| 702-07-D |
cross drain safety end (type 4)
|
2   |
EACH |
25,000.00 |
50,000.00 |
30,000.00 |
60,000.00 |
|
|
|
|
| 703-01 |
shoulder underdrain systems
|
65,585   |
LNFT |
5.40 |
354,159.00 |
15.00 |
983,775.00 |
|
|
|
|
| 703-02 |
shoulder outlet underdrains
|
220   |
EACH |
360.00 |
79,200.00 |
650.00 |
143,000.00 |
|
|
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
564.2 |
SQYD |
70.00 |
39,494.00 |
75.00 |
42,315.00 |
|
|
|
|
| 707-01 |
concrete curb
|
65.0 |
LNFT |
12.00 |
780.00 |
14.50 |
942.50 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
495,500.00 |
495,500.00 |
1,000,000.00 |
1,000,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
34.726 |
MILE |
250.00 |
8,681.50 |
360.00 |
12,501.36 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
17.363 |
MILE |
475.00 |
8,247.43 |
570.00 |
9,896.91 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
69.452 |
MILE |
795.00 |
55,214.34 |
955.00 |
66,326.66 |
|
|
|
|
| 713-08 |
temporary precast concrete barrier (department
furnished) |
250   |
EACH |
40.00 |
10,000.00 |
285.00 |
71,250.00 |
|
|
|
|
| 713-10 |
temporary precast concrete barrier movement
|
250   |
EACH |
40.00 |
10,000.00 |
70.00 |
17,500.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
89.8 |
TON |
550.00 |
49,390.00 |
775.00 |
69,595.00 |
|
|
|
|
| 726-01 |
bedding material
|
26.4 |
CUYD |
85.00 |
2,244.00 |
60.00 |
1,584.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
495,500.00 |
495,500.00 |
1,400,000.00 |
1,400,000.00 |
|
|
|
|
| 729-01 |
sign (type a)
|
581.8 |
SQFT |
17.00 |
9,890.60 |
23.00 |
13,381.40 |
|
|
|
|
| 729-02 |
sign (type b)
|
18.2 |
SQFT |
18.00 |
327.60 |
32.00 |
582.40 |
|
|
|
|
| 729-04 |
sign (type d)
|
2,190.0 |
SQFT |
19.00 |
41,610.00 |
29.00 |
63,510.00 |
|
|
|
|
| 729-05 |
sign (type e)
|
34.0 |
SQFT |
25.00 |
850.00 |
36.00 |
1,224.00 |
|
|
|
|
| 729-08-A |
mounting (2 1/2" post)
|
24   |
EACH |
600.00 |
14,400.00 |
900.00 |
21,600.00 |
|
|
|
|
| 729-08-B |
mounting (3 1/2" post)
|
15   |
EACH |
700.00 |
10,500.00 |
1,030.00 |
15,450.00 |
|
|
|
|
| 729-08-F |
mounting (w6 x 12)
|
35   |
EACH |
800.00 |
28,000.00 |
1,200.00 |
42,000.00 |
|
|
|
|
| 729-08-G |
mounting (w8 x 18)
|
16   |
EACH |
1,200.00 |
19,200.00 |
1,450.00 |
23,200.00 |
|
|
|
|
| 729-08-H |
mounting (w8 x 24)
|
10   |
EACH |
1,700.00 |
17,000.00 |
1,980.00 |
19,800.00 |
|
|
|
|
| 729-17 |
milepost assembly (ground mounted)
|
10   |
EACH |
270.00 |
2,700.00 |
110.00 |
1,100.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,719   |
EACH |
5.50 |
9,454.50 |
6.60 |
11,345.40 |
|
|
|
|
| 732-01-C |
plastic pavement striping (dotted line)(8" width)
|
266   |
LNFT |
0.95 |
252.70 |
1.15 |
305.90 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
26.237 |
MILE |
2,750.00 |
72,151.75 |
3,300.00 |
86,582.10 |
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.528 |
MILE |
5,900.00 |
3,115.20 |
7,100.00 |
3,748.80 |
|
|
|
|
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.100 |
MILE |
17,900.00 |
1,790.00 |
21,500.00 |
2,150.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
11.575 |
MILE |
910.00 |
10,533.25 |
1,095.00 |
12,674.63 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
3   |
EACH |
225.00 |
675.00 |
270.00 |
810.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
3   |
EACH |
250.00 |
750.00 |
300.00 |
900.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
1.000 |
MILE |
5,900.00 |
5,900.00 |
7,100.00 |
7,100.00 |
|
|
|
|
| 734-01 |
rubblizing portland cement concrete pavement
|
157,510   |
SQYD |
5.00 |
787,550.00 |
3.10 |
488,281.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
44.89 |
ACRE |
1,100.00 |
49,379.00 |
1,600.00 |
71,824.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
100,000.00 |
100,000.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
8.36 |
CUYD |
1,000.00 |
8,360.00 |
1,850.00 |
15,466.00 |
|
|
|
|
| 805-12-K |
reinforced concrete box culverts (7'x 5')
|
10.0 |
LNFT |
1,000.00 |
10,000.00 |
2,300.00 |
23,000.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
571   |
LB |
2.00 |
1,142.00 |
3.50 |
1,998.50 |
|
|
|
|
| S-001 |
hauling and stockpiling p.c.c. pavement
|
lump |
LUMP |
25,000.00 |
25,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-002 |
rubblization prep.
|
lump |
LUMP |
10,000.00 |
10,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| S-003 |
pccp joint membrane
|
1,044   |
LNFT |
5.00 |
5,220.00 |
12.00 |
12,528.00 |
|
|
|
|
| S-004 |
pccp sawcutting
|
156   |
LNFT |
20.00 |
3,120.00 |
18.00 |
2,808.00 |
|
|
|
|
| S-005 |
impact attenuators (construction zone)
|
4   |
EACH |
10,000.00 |
40,000.00 |
25,500.00 |
102,000.00 |
|
|
|
|
| S-006 |
dynamic message sign unit
|
6   |
EACH |
15,000.00 |
90,000.00 |
19,000.00 |
114,000.00 |
|
|
|
|
| S-007 |
rumble strips (ground-in)
|
23.2 |
MILE |
1,000.00 |
23,200.00 |
1,155.00 |
26,796.00 |
|
|
|
|
| S-008 |
soil mixing
|
lump |
LUMP |
65,000.00 |
65,000.00 |
55,000.00 |
55,000.00 |
|
|
|
|
| S-009 |
remove existing sign and u channel post
|
28   |
EACH |
30.00 |
840.00 |
90.00 |
2,520.00 |
|
|
|
|
| S-010 |
remove and remount existing sign
|
3   |
EACH |
200.00 |
600.00 |
1,100.00 |
3,300.00 |
|
|
|
|
| S-011 |
remove and remount existing logo
|
21   |
EACH |
40.00 |
840.00 |
135.00 |
2,835.00 |
|
|
|
|
| S-922 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
1,056   |
LNFT |
3.50 |
3,696.00 |
4.20 |
4,435.20 |
|
|
|
|
| S-923 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
2,400   |
LNFT |
3.50 |
8,400.00 |
4.20 |
10,080.00 |
|
|
|
|
| S-927 |
sawcuts in asphaltic concrete lifts
|
6,880   |
LNFT |
1.75 |
12,040.00 |
3.00 |
20,640.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
12,952,021.87 |
|
17,508,579.26 |
|
|
|
|
|