| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - COASTAL BRIDGE CO., L.L.C. |
- 3 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-07 |
borrow (vehicular measurement)
|
1,228   |
CUYD |
20.00 |
24,560.00 |
1.00 |
1,228.00 |
10.00 |
12,280.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
28   |
EACH |
15.00 |
420.00 |
12.00 |
336.00 |
10.00 |
280.00 |
|
|
| 204-06 |
temporary silt fencing
|
63,149   |
LNFT |
0.50 |
31,574.50 |
0.01 |
631.49 |
1.35 |
85,251.15 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
38   |
CUYD |
150.00 |
5,700.00 |
1.00 |
38.00 |
100.00 |
3,800.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
30,233.3 |
TON |
64.00 |
1,934,931.20 |
64.00 |
1,934,931.20 |
65.00 |
1,965,164.50 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
117.9 |
TON |
150.00 |
17,685.00 |
95.00 |
11,200.50 |
170.00 |
20,043.00 |
|
|
| 509-01 |
cold planing asphaltic pavement (2" deep)
|
153,679   |
SQYD |
1.20 |
184,414.80 |
1.35 |
207,466.65 |
2.00 |
307,358.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 6,403   |
CUYD |
15.00 |
- 96,045.00 |
1.00 |
- 6,403.00 |
0.01 |
- 64.03 |
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
422   |
SQYD |
50.00 |
21,100.00 |
50.00 |
21,100.00 |
35.00 |
14,770.00 |
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
1,579   |
SQYD |
80.00 |
126,320.00 |
90.00 |
142,110.00 |
70.00 |
110,530.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
50,000.00 |
50,000.00 |
102,000.00 |
102,000.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
17.940 |
MILE |
10.00 |
179.40 |
400.00 |
7,176.00 |
500.00 |
8,970.00 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
17.940 |
MILE |
20.00 |
358.80 |
300.00 |
5,382.00 |
10.00 |
179.40 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
24.760 |
MILE |
500.00 |
12,380.00 |
425.00 |
10,523.00 |
10.00 |
247.60 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
140,000.00 |
140,000.00 |
170,000.00 |
170,000.00 |
118,000.00 |
118,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
791   |
EACH |
5.50 |
4,350.50 |
5.20 |
4,113.20 |
7.00 |
5,537.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
12.240 |
MILE |
2,800.00 |
34,272.00 |
2,650.00 |
32,436.00 |
3,000.00 |
36,720.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.980 |
MILE |
750.00 |
4,485.00 |
720.00 |
4,305.60 |
1,000.00 |
5,980.00 |
|
|
| 739-01 |
hydro-seeding
|
8.70 |
ACRE |
900.00 |
7,830.00 |
1,000.00 |
8,700.00 |
1,000.00 |
8,700.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
15,000.00 |
15,000.00 |
25,300.00 |
25,300.00 |
|
|
| S-001 |
rumble strips (ground-in)
|
11.9 |
MILE |
700.00 |
8,330.00 |
1,000.00 |
11,900.00 |
1,000.00 |
11,900.00 |
|
|
| S-002 |
dynamic message sign unit
|
2   |
EACH |
5,000.00 |
10,000.00 |
15,000.00 |
30,000.00 |
8,000.00 |
16,000.00 |
|
|
| S-003 |
sawcutting asphaltic concrete patches (6" deep)
|
1,392.6 |
LNFT |
1.00 |
1,392.60 |
3.25 |
4,525.95 |
4.50 |
6,266.70 |
|
|
| S-004 |
sawcutting asphaltic concrete patches (12" deep)
|
5,210.7 |
LNFT |
2.00 |
10,421.40 |
3.75 |
19,540.13 |
5.00 |
26,053.50 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,509,660.20 |
|
2,686,240.72 |
|
2,891,266.82 |
|
|
|