Lead Project: 407-01-0041
Parish: LAFOURCHE
Routes: LA 308
Description: LA 308 (GALLIANO BRIDGE TO CUTOFF)
Type Const: grading, cold planing asphaltic concrete pavement, superpave asphaltic concrete
pavement, pavement patching, pavement widening, and related work.
Estimated Construction Cost: $1,653,820.17
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC $1,562,937.50
2 06487 HUEY STOCKSTILL, INC. $1,742,479.20
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
HUEY STOCKSTILL, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 464      LNFT 4.00 1,856.00 8.00 3,712.00        
203-07 borrow (vehicular measurement) 605      CUYD 5.00 3,025.00 16.00 9,680.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
1,028      CUYD 80.00 82,240.00 83.00 85,324.00        
502-01 superpave asphaltic concrete 14,913.1    TON 65.00 969,351.50 72.00 1,073,743.20        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
805.9    TON 65.00 52,383.50 150.00 120,885.00        
509-01 cold planing asphaltic pavement 79,060      SQYD 1.00 79,060.00 2.35 185,791.00        
509-02 contractor retained reclaimed asphaltic pavement - 3,294      CUYD 1.00 - 3,294.00 10.00 - 32,940.00        
510-01-B pavement patching (12" minimum thickness) 500      SQYD 70.00 35,000.00 110.00 55,000.00        
510-02 pavement widening 532.2    SQYD 40.00 21,288.00 60.00 31,932.00        
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 37.5    LNFT 60.00 2,250.00 60.00 2,250.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 256.0    LNFT 50.00 12,800.00 50.00 12,800.00        
704-03 blocked out guard rail 37.5    LNFT 22.00 825.00 22.00 825.00        
704-05 guard rail anchor sections (bct) 12.5    LNFT 85.00 1,062.50 85.00 1,062.50        
704-11-A guard rail end treatment (flared) 3      EACH 2,500.00 7,500.00 2,400.00 7,200.00        
713-01 temporary signs & barricades lump      LUMP 80,000.00 80,000.00 10,000.00 10,000.00        
713-02-A temporary pavement markings (4" width) 1,050      LNFT 0.10 105.00 0.15 157.50        
713-02-C temporary pavement markings (8" width) 150      LNFT 0.10 15.00 0.30 45.00        
713-02-E temporary pavement markings (24" width) 215      LNFT 1.00 215.00 1.00 215.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
5.280  MILE 150.00 792.00 600.00 3,168.00        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
4.210  MILE 100.00 421.00 600.00 2,526.00        
713-04-A temporary pavement markings (solid line)(4" width) 4.030  MILE 600.00 2,418.00 1,800.00 7,254.00        
713-05-A temporary pavement legends and symbols (arrow) 1      EACH 20.00 20.00 50.00 50.00        
713-05-C temporary pavement legends and symbols (only) 1      EACH 20.00 20.00 50.00 50.00        
727-01 mobilization lump      LUMP 150,000.00 150,000.00 106,000.00 106,000.00        
729-16-B object marker assembly (type 2) 72      EACH 20.00 1,440.00 55.00 3,960.00        
729-16-C object marker assembly (type 3) 4      EACH 80.00 320.00 90.00 360.00        
731-02 reflectorized raised pavement markers 727      EACH 6.00 4,362.00 5.50 3,998.50        
732-01-A plastic pavement striping (4" width) 1,050      LNFT 0.50 525.00 0.50 525.00        
732-01-C plastic pavement striping (8" width) 150      LNFT 1.00 150.00 1.00 150.00        
732-01-E plastic pavement striping (24" width) 215      LNFT 4.00 860.00 4.50 967.50        
732-02-A plastic pavement striping (solid line) (4" width) 4.030  MILE 6,000.00 24,180.00 5,000.00 20,150.00        
732-03-A plastic pavement striping (broken line)(4" width) 4.210  MILE 1,000.00 4,210.00 800.00 3,368.00        
732-04-A plastic pavement legends & symbols (arrow) 1      EACH 200.00 200.00 180.00 180.00        
732-04-C plastic pavement legends & symbols (only) 1      EACH 250.00 250.00 200.00 200.00        
735-01 mailboxes 112      EACH 1.00 112.00 5.00 560.00        
735-02 mailbox supports (single) 105      EACH 100.00 10,500.00 150.00 15,750.00        
735-03 mailbox supports (double) 5      EACH 175.00 875.00 180.00 900.00        
735-04 mailbox supports (multiple) 2      EACH 300.00 600.00 340.00 680.00        
740-01 construction layout lump      LUMP 15,000.00 15,000.00 4,000.00 4,000.00        
                       
 CONTRACTOR TOTAL       1,562,937.50   1,742,479.20        