| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - H & S CONSTRUCTION CO., INC. |
- 2 - W. E. MCDONALD & SON, LLC. |
- 3 - M. MATT DURAND, LLC |
- 4 - PRAIRIE CONTRACTORS INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
35,000.00 |
35,000.00 |
4,000.00 |
4,000.00 |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
50   |
SQYD |
10.00 |
500.00 |
20.00 |
1,000.00 |
12.00 |
600.00 |
30.00 |
1,500.00 |
| 202-02-H |
removal of guard rail
|
173   |
LNFT |
6.00 |
1,038.00 |
2.00 |
346.00 |
20.00 |
3,460.00 |
15.00 |
2,595.00 |
| 202-02-I |
removal of existing cross drains
|
880   |
LNFT |
16.50 |
14,520.00 |
12.00 |
10,560.00 |
25.00 |
22,000.00 |
10.00 |
8,800.00 |
| 203-07 |
borrow (vehicular measurement)
|
500   |
CUYD |
10.00 |
5,000.00 |
10.00 |
5,000.00 |
10.00 |
5,000.00 |
15.00 |
7,500.00 |
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
500   |
CUYD |
10.00 |
5,000.00 |
0.01 |
5.00 |
11.00 |
5,500.00 |
15.00 |
7,500.00 |
| 204-02 |
temporary hay or straw bales
|
133   |
EACH |
8.00 |
1,064.00 |
5.00 |
665.00 |
20.00 |
2,660.00 |
20.00 |
2,660.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
32   |
EACH |
75.00 |
2,400.00 |
250.00 |
8,000.00 |
120.00 |
3,840.00 |
500.00 |
16,000.00 |
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
85,979   |
SQYD |
4.75 |
408,400.25 |
5.95 |
511,575.05 |
6.50 |
558,863.50 |
7.00 |
601,853.00 |
| 303-02 |
removal of existing patches
|
4,837   |
SQYD |
2.00 |
9,674.00 |
0.01 |
48.37 |
6.00 |
29,022.00 |
5.00 |
24,185.00 |
| 304-01 |
lime
|
46.03 |
TON |
155.00 |
7,134.65 |
200.00 |
9,206.00 |
150.00 |
6,904.50 |
200.00 |
9,206.00 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
4,586   |
SQYD |
2.00 |
9,172.00 |
5.15 |
23,617.90 |
2.50 |
11,465.00 |
7.00 |
32,102.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,108   |
CUYD |
21.00 |
44,268.00 |
20.00 |
42,160.00 |
76.00 |
160,208.00 |
30.00 |
63,240.00 |
| 502-01 |
superpave asphaltic concrete
|
19,870.0 |
TON |
76.00 |
1,510,120.00 |
78.00 |
1,549,860.00 |
82.00 |
1,629,340.00 |
85.00 |
1,688,950.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,216.8 |
TON |
120.00 |
146,016.00 |
115.00 |
139,932.00 |
95.00 |
115,596.00 |
115.00 |
139,932.00 |
| 509-01 |
cold planing asphaltic pavement
|
68,399   |
SQYD |
1.00 |
68,399.00 |
1.15 |
78,658.85 |
1.70 |
116,278.30 |
2.00 |
136,798.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,494   |
CUYD |
0.01 |
- 24.94 |
0.01 |
- 24.94 |
2.00 |
- 4,988.00 |
0.01 |
- 24.94 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
60   |
SQYD |
185.00 |
11,100.00 |
150.00 |
9,000.00 |
83.00 |
4,980.00 |
150.00 |
9,000.00 |
| 701-01-I |
cross drain pipe (24" rcp)
|
296   |
LNFT |
139.70 |
41,351.20 |
117.00 |
34,632.00 |
60.00 |
17,760.00 |
100.00 |
29,600.00 |
| 701-01-M |
cross drain pipe (36" rcp/bccsp)
|
56   |
LNFT |
168.30 |
9,424.80 |
141.00 |
7,896.00 |
100.00 |
5,600.00 |
150.00 |
8,400.00 |
| 701-01-O |
cross drain pipe (48" rcp/bccsp)
|
352   |
LNFT |
216.70 |
76,278.40 |
181.00 |
63,712.00 |
142.00 |
49,984.00 |
250.00 |
88,000.00 |
| 701-01-P |
cross drain pipe (54" rcp/bccsp)
|
176   |
LNFT |
232.10 |
40,849.60 |
195.00 |
34,320.00 |
210.00 |
36,960.00 |
300.00 |
52,800.00 |
| 701-08 |
relaying pipe
|
232   |
LNFT |
176.00 |
40,832.00 |
150.00 |
34,800.00 |
50.00 |
11,600.00 |
150.00 |
34,800.00 |
| 704-03 |
blocked out guard rail
|
87.5 |
LNFT |
20.90 |
1,828.75 |
19.00 |
1,662.50 |
25.00 |
2,187.50 |
25.00 |
2,187.50 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
75.0 |
LNFT |
60.50 |
4,537.50 |
55.00 |
4,125.00 |
66.00 |
4,950.00 |
60.00 |
4,500.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
3   |
EACH |
2,607.00 |
7,821.00 |
2,370.00 |
7,110.00 |
3,000.00 |
9,000.00 |
2,500.00 |
7,500.00 |
| 704-11-D |
guard rail end treatment (bct)
|
1   |
EACH |
1,100.00 |
1,100.00 |
1,000.00 |
1,000.00 |
1,200.00 |
1,200.00 |
1,500.00 |
1,500.00 |
| 712-02 |
sacked concrete revetment
|
316   |
SQYD |
176.00 |
55,616.00 |
100.00 |
31,600.00 |
45.00 |
14,220.00 |
70.00 |
22,120.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
30,000.00 |
30,000.00 |
9,000.00 |
9,000.00 |
40,000.00 |
40,000.00 |
150,000.00 |
150,000.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
20.916 |
MILE |
220.00 |
4,601.52 |
400.00 |
8,366.40 |
350.00 |
7,320.60 |
400.00 |
8,366.40 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
20.916 |
MILE |
1.00 |
20.92 |
0.01 |
0.21 |
350.00 |
7,320.60 |
0.01 |
0.21 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
56.972 |
MILE |
1.00 |
56.97 |
0.01 |
0.57 |
600.00 |
34,183.20 |
0.01 |
0.57 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
15,000.00 |
15,000.00 |
5,000.00 |
5,000.00 |
| 726-01 |
bedding material
|
275.0 |
CUYD |
50.00 |
13,750.00 |
1.00 |
275.00 |
75.00 |
20,625.00 |
100.00 |
27,500.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
42,500.00 |
42,500.00 |
83,000.00 |
83,000.00 |
120,000.00 |
120,000.00 |
150,000.00 |
150,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
18   |
EACH |
66.00 |
1,188.00 |
60.00 |
1,080.00 |
13.00 |
234.00 |
70.00 |
1,260.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
77.00 |
616.00 |
70.00 |
560.00 |
60.00 |
480.00 |
80.00 |
640.00 |
| 731-02 |
reflectorized raised pavement markers
|
760   |
EACH |
5.72 |
4,347.20 |
4.50 |
3,420.00 |
6.00 |
4,560.00 |
6.00 |
4,560.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
14.243 |
MILE |
2,871.00 |
40,891.65 |
2,300.00 |
32,758.90 |
3,000.00 |
42,729.00 |
2,500.00 |
35,607.50 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.299 |
MILE |
869.00 |
4,604.83 |
700.00 |
3,709.30 |
950.00 |
5,034.05 |
1,000.00 |
5,299.00 |
| 732-05 |
removal of existing markings
|
0.036 |
MILE |
6,490.00 |
233.64 |
10,000.00 |
360.00 |
7,000.00 |
252.00 |
12,000.00 |
432.00 |
| 735-01 |
mailboxes
|
43   |
EACH |
1.10 |
47.30 |
1.00 |
43.00 |
60.00 |
2,580.00 |
2.00 |
86.00 |
| 735-02 |
mailbox supports (single)
|
33   |
EACH |
121.00 |
3,993.00 |
125.00 |
4,125.00 |
150.00 |
4,950.00 |
150.00 |
4,950.00 |
| 735-03 |
mailbox supports (double)
|
5   |
EACH |
176.00 |
880.00 |
185.00 |
925.00 |
210.00 |
1,050.00 |
300.00 |
1,500.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
4,500.00 |
4,500.00 |
8,000.00 |
8,000.00 |
50,000.00 |
50,000.00 |
10,000.00 |
10,000.00 |
| S-001 |
full depth sawcutting of concrete driveways
|
85   |
INFT |
27.50 |
2,337.50 |
8.00 |
680.00 |
1.30 |
110.50 |
12.00 |
1,020.00 |
| S-002 |
cleaning existing ditches
|
400   |
LNFT |
10.00 |
4,000.00 |
10.00 |
4,000.00 |
3.50 |
1,400.00 |
15.00 |
6,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,719,488.74 |
|
2,779,770.11 |
|
3,192,019.75 |
|
3,423,425.24 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - GILCHRIST CONSTRUCTION CO. LLC |
- 6 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
30,000.00 |
30,000.00 |
6,000.00 |
6,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
50   |
SQYD |
9.00 |
450.00 |
65.00 |
3,250.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
173   |
LNFT |
12.00 |
2,076.00 |
46.00 |
7,958.00 |
|
|
|
|
| 202-02-I |
removal of existing cross drains
|
880   |
LNFT |
8.10 |
7,128.00 |
20.00 |
17,600.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
500   |
CUYD |
30.00 |
15,000.00 |
13.00 |
6,500.00 |
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
500   |
CUYD |
30.00 |
15,000.00 |
13.00 |
6,500.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
133   |
EACH |
20.00 |
2,660.00 |
40.00 |
5,320.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
32   |
EACH |
175.00 |
5,600.00 |
300.00 |
9,600.00 |
|
|
|
|
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
85,979   |
SQYD |
7.50 |
644,842.50 |
7.50 |
644,842.50 |
|
|
|
|
| 303-02 |
removal of existing patches
|
4,837   |
SQYD |
1.00 |
4,837.00 |
11.00 |
53,207.00 |
|
|
|
|
| 304-01 |
lime
|
46.03 |
TON |
150.00 |
6,904.50 |
150.00 |
6,904.50 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
4,586   |
SQYD |
6.00 |
27,516.00 |
6.50 |
29,809.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,108   |
CUYD |
58.00 |
122,264.00 |
26.00 |
54,808.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
19,870.0 |
TON |
90.00 |
1,788,300.00 |
97.00 |
1,927,390.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,216.8 |
TON |
115.00 |
139,932.00 |
155.00 |
188,604.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
68,399   |
SQYD |
1.50 |
102,598.50 |
1.40 |
95,758.60 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,494   |
CUYD |
0.01 |
- 24.94 |
0.10 |
- 249.40 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
60   |
SQYD |
200.00 |
12,000.00 |
230.00 |
13,800.00 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp)
|
296   |
LNFT |
180.00 |
53,280.00 |
130.00 |
38,480.00 |
|
|
|
|
| 701-01-M |
cross drain pipe (36" rcp/bccsp)
|
56   |
LNFT |
260.00 |
14,560.00 |
160.00 |
8,960.00 |
|
|
|
|
| 701-01-O |
cross drain pipe (48" rcp/bccsp)
|
352   |
LNFT |
280.00 |
98,560.00 |
200.00 |
70,400.00 |
|
|
|
|
| 701-01-P |
cross drain pipe (54" rcp/bccsp)
|
176   |
LNFT |
300.00 |
52,800.00 |
225.00 |
39,600.00 |
|
|
|
|
| 701-08 |
relaying pipe
|
232   |
LNFT |
135.00 |
31,320.00 |
180.00 |
41,760.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
87.5 |
LNFT |
22.00 |
1,925.00 |
21.00 |
1,837.50 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
75.0 |
LNFT |
66.00 |
4,950.00 |
60.00 |
4,500.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
3   |
EACH |
2,800.00 |
8,400.00 |
2,500.00 |
7,500.00 |
|
|
|
|
| 704-11-D |
guard rail end treatment (bct)
|
1   |
EACH |
1,200.00 |
1,200.00 |
1,100.00 |
1,100.00 |
|
|
|
|
| 712-02 |
sacked concrete revetment
|
316   |
SQYD |
80.00 |
25,280.00 |
200.00 |
63,200.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
35,000.00 |
35,000.00 |
16,000.00 |
16,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
20.916 |
MILE |
400.00 |
8,366.40 |
150.00 |
3,137.40 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
20.916 |
MILE |
1.00 |
20.92 |
300.00 |
6,274.80 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
56.972 |
MILE |
1.00 |
56.97 |
550.00 |
31,334.60 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
12,000.00 |
12,000.00 |
6,500.00 |
6,500.00 |
|
|
|
|
| 726-01 |
bedding material
|
275.0 |
CUYD |
100.00 |
27,500.00 |
114.43 |
31,468.25 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
215,000.00 |
215,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
18   |
EACH |
70.00 |
1,260.00 |
75.00 |
1,350.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
80.00 |
640.00 |
80.00 |
640.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
760   |
EACH |
6.00 |
4,560.00 |
5.00 |
3,800.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
14.243 |
MILE |
3,000.00 |
42,729.00 |
2,500.00 |
35,607.50 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.299 |
MILE |
900.00 |
4,769.10 |
800.00 |
4,239.20 |
|
|
|
|
| 732-05 |
removal of existing markings
|
0.036 |
MILE |
6,500.00 |
234.00 |
11,000.00 |
396.00 |
|
|
|
|
| 735-01 |
mailboxes
|
43   |
EACH |
20.00 |
860.00 |
1.00 |
43.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
33   |
EACH |
140.00 |
4,620.00 |
150.00 |
4,950.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
5   |
EACH |
200.00 |
1,000.00 |
200.00 |
1,000.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
23,000.00 |
23,000.00 |
|
|
|
|
| S-001 |
full depth sawcutting of concrete driveways
|
85   |
INFT |
10.00 |
850.00 |
40.00 |
3,400.00 |
|
|
|
|
| S-002 |
cleaning existing ditches
|
400   |
LNFT |
13.00 |
5,200.00 |
12.00 |
4,800.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,599,024.95 |
|
3,732,880.45 |
|
|
|
|
|