Lead Project: 388-03-0010
Parish: ACADIA
Routes: LA 370
Description: SOUTH JUNCTION LA 1105 - LA 35
Type Const: grading, drainage structures, lime treatment, in-place cement stabilized base course,
cold planing asph pvmt, pavement patching, superpave ac ovly and related work.
Estimated Construction Cost: $3,828,823.82
 
RankLicenseBidderConstruction Bid
1 04089 H & S CONSTRUCTION CO., INC. $2,719,488.74
2 08815 W. E. MCDONALD & SON, LLC. $2,779,770.11
3 13086 M. MATT DURAND, LLC $3,192,019.75
4 34356 PRAIRIE CONTRACTORS INC. $3,423,425.24
5 12312 GILCHRIST CONSTRUCTION CO. LLC $3,599,024.95
6 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $3,732,880.45
 
Item Number Item Description Quantity Unit of Measure - 1 -
H & S CONSTRUCTION CO., INC.
- 2 -
W. E. MCDONALD & SON, LLC.
- 3 -
M. MATT DURAND, LLC
- 4 -
PRAIRIE CONTRACTORS INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 35,000.00 35,000.00 4,000.00 4,000.00 10,000.00 10,000.00 8,000.00 8,000.00
202-02-D removal of concrete walks & drives 50      SQYD 10.00 500.00 20.00 1,000.00 12.00 600.00 30.00 1,500.00
202-02-H removal of guard rail 173      LNFT 6.00 1,038.00 2.00 346.00 20.00 3,460.00 15.00 2,595.00
202-02-I removal of existing cross drains 880      LNFT 16.50 14,520.00 12.00 10,560.00 25.00 22,000.00 10.00 8,800.00
203-07 borrow (vehicular measurement) 500      CUYD 10.00 5,000.00 10.00 5,000.00 10.00 5,000.00 15.00 7,500.00
203-07-A borrow (vehicular meas.)(selected soils) 500      CUYD 10.00 5,000.00 0.01 5.00 11.00 5,500.00 15.00 7,500.00
204-02 temporary hay or straw bales 133      EACH 8.00 1,064.00 5.00 665.00 20.00 2,660.00 20.00 2,660.00
204-05-A temporary sediment check dams (hay) 32      EACH 75.00 2,400.00 250.00 8,000.00 120.00 3,840.00 500.00 16,000.00
303-01-B in-place cement stabilized base course (8 1/2" thick) 85,979      SQYD 4.75 408,400.25 5.95 511,575.05 6.50 558,863.50 7.00 601,853.00
303-02 removal of existing patches 4,837      SQYD 2.00 9,674.00 0.01 48.37 6.00 29,022.00 5.00 24,185.00
304-01 lime 46.03   TON 155.00 7,134.65 200.00 9,206.00 150.00 6,904.50 200.00 9,206.00
304-04-D lime treatment (type d) (12" thick) 4,586      SQYD 2.00 9,172.00 5.15 23,617.90 2.50 11,465.00 7.00 32,102.00
401-02 aggregate surface course (adjusted vehicular
measurement)
2,108      CUYD 21.00 44,268.00 20.00 42,160.00 76.00 160,208.00 30.00 63,240.00
502-01 superpave asphaltic concrete 19,870.0    TON 76.00 1,510,120.00 78.00 1,549,860.00 82.00 1,629,340.00 85.00 1,688,950.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,216.8    TON 120.00 146,016.00 115.00 139,932.00 95.00 115,596.00 115.00 139,932.00
509-01 cold planing asphaltic pavement 68,399      SQYD 1.00 68,399.00 1.15 78,658.85 1.70 116,278.30 2.00 136,798.00
509-02 contractor retained reclaimed asphaltic pavement - 2,494      CUYD 0.01 - 24.94 0.01 - 24.94 2.00 - 4,988.00 0.01 - 24.94
510-01-B pavement patching (12" minimum thickness) 60      SQYD 185.00 11,100.00 150.00 9,000.00 83.00 4,980.00 150.00 9,000.00
701-01-I cross drain pipe (24" rcp) 296      LNFT 139.70 41,351.20 117.00 34,632.00 60.00 17,760.00 100.00 29,600.00
701-01-M cross drain pipe (36" rcp/bccsp) 56      LNFT 168.30 9,424.80 141.00 7,896.00 100.00 5,600.00 150.00 8,400.00
701-01-O cross drain pipe (48" rcp/bccsp) 352      LNFT 216.70 76,278.40 181.00 63,712.00 142.00 49,984.00 250.00 88,000.00
701-01-P cross drain pipe (54" rcp/bccsp) 176      LNFT 232.10 40,849.60 195.00 34,320.00 210.00 36,960.00 300.00 52,800.00
701-08 relaying pipe 232      LNFT 176.00 40,832.00 150.00 34,800.00 50.00 11,600.00 150.00 34,800.00
704-03 blocked out guard rail 87.5    LNFT 20.90 1,828.75 19.00 1,662.50 25.00 2,187.50 25.00 2,187.50
704-08-B guard rail transitions (double thrie beam) 75.0    LNFT 60.50 4,537.50 55.00 4,125.00 66.00 4,950.00 60.00 4,500.00
704-11-B guard rail end treatment (tangent) 3      EACH 2,607.00 7,821.00 2,370.00 7,110.00 3,000.00 9,000.00 2,500.00 7,500.00
704-11-D guard rail end treatment (bct) 1      EACH 1,100.00 1,100.00 1,000.00 1,000.00 1,200.00 1,200.00 1,500.00 1,500.00
712-02 sacked concrete revetment 316      SQYD 176.00 55,616.00 100.00 31,600.00 45.00 14,220.00 70.00 22,120.00
713-01 temporary signs & barricades lump      LUMP 30,000.00 30,000.00 9,000.00 9,000.00 40,000.00 40,000.00 150,000.00 150,000.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
20.916  MILE 220.00 4,601.52 400.00 8,366.40 350.00 7,320.60 400.00 8,366.40
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
20.916  MILE 1.00 20.92 0.01 0.21 350.00 7,320.60 0.01 0.21
713-04-A temporary pavement markings (solid line)(4" width) 56.972  MILE 1.00 56.97 0.01 0.57 600.00 34,183.20 0.01 0.57
722-02 project site laboratory (equipped) 1      EACH 2,500.00 2,500.00 5,000.00 5,000.00 15,000.00 15,000.00 5,000.00 5,000.00
726-01 bedding material 275.0    CUYD 50.00 13,750.00 1.00 275.00 75.00 20,625.00 100.00 27,500.00
727-01 mobilization lump      LUMP 42,500.00 42,500.00 83,000.00 83,000.00 120,000.00 120,000.00 150,000.00 150,000.00
729-16-B object marker assembly (type 2) 18      EACH 66.00 1,188.00 60.00 1,080.00 13.00 234.00 70.00 1,260.00
729-16-C object marker assembly (type 3) 8      EACH 77.00 616.00 70.00 560.00 60.00 480.00 80.00 640.00
731-02 reflectorized raised pavement markers 760      EACH 5.72 4,347.20 4.50 3,420.00 6.00 4,560.00 6.00 4,560.00
732-02-A plastic pavement striping (solid line) (4" width) 14.243  MILE 2,871.00 40,891.65 2,300.00 32,758.90 3,000.00 42,729.00 2,500.00 35,607.50
732-03-A plastic pavement striping (broken line)(4" width) 5.299  MILE 869.00 4,604.83 700.00 3,709.30 950.00 5,034.05 1,000.00 5,299.00
732-05 removal of existing markings 0.036  MILE 6,490.00 233.64 10,000.00 360.00 7,000.00 252.00 12,000.00 432.00
735-01 mailboxes 43      EACH 1.10 47.30 1.00 43.00 60.00 2,580.00 2.00 86.00
735-02 mailbox supports (single) 33      EACH 121.00 3,993.00 125.00 4,125.00 150.00 4,950.00 150.00 4,950.00
735-03 mailbox supports (double) 5      EACH 176.00 880.00 185.00 925.00 210.00 1,050.00 300.00 1,500.00
740-01 construction layout lump      LUMP 4,500.00 4,500.00 8,000.00 8,000.00 50,000.00 50,000.00 10,000.00 10,000.00
S-001 full depth sawcutting of concrete driveways 85      INFT 27.50 2,337.50 8.00 680.00 1.30 110.50 12.00 1,020.00
S-002 cleaning existing ditches 400      LNFT 10.00 4,000.00 10.00 4,000.00 3.50 1,400.00 15.00 6,000.00
                       
 CONTRACTOR TOTAL       2,719,488.74   2,779,770.11   3,192,019.75   3,423,425.24
 
Item Number Item Description Quantity Unit of Measure - 5 -
GILCHRIST CONSTRUCTION CO. LLC
- 6 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 30,000.00 30,000.00 6,000.00 6,000.00        
202-02-D removal of concrete walks & drives 50      SQYD 9.00 450.00 65.00 3,250.00        
202-02-H removal of guard rail 173      LNFT 12.00 2,076.00 46.00 7,958.00        
202-02-I removal of existing cross drains 880      LNFT 8.10 7,128.00 20.00 17,600.00        
203-07 borrow (vehicular measurement) 500      CUYD 30.00 15,000.00 13.00 6,500.00        
203-07-A borrow (vehicular meas.)(selected soils) 500      CUYD 30.00 15,000.00 13.00 6,500.00        
204-02 temporary hay or straw bales 133      EACH 20.00 2,660.00 40.00 5,320.00        
204-05-A temporary sediment check dams (hay) 32      EACH 175.00 5,600.00 300.00 9,600.00        
303-01-B in-place cement stabilized base course (8 1/2" thick) 85,979      SQYD 7.50 644,842.50 7.50 644,842.50        
303-02 removal of existing patches 4,837      SQYD 1.00 4,837.00 11.00 53,207.00        
304-01 lime 46.03   TON 150.00 6,904.50 150.00 6,904.50        
304-04-D lime treatment (type d) (12" thick) 4,586      SQYD 6.00 27,516.00 6.50 29,809.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
2,108      CUYD 58.00 122,264.00 26.00 54,808.00        
502-01 superpave asphaltic concrete 19,870.0    TON 90.00 1,788,300.00 97.00 1,927,390.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,216.8    TON 115.00 139,932.00 155.00 188,604.00        
509-01 cold planing asphaltic pavement 68,399      SQYD 1.50 102,598.50 1.40 95,758.60        
509-02 contractor retained reclaimed asphaltic pavement - 2,494      CUYD 0.01 - 24.94 0.10 - 249.40        
510-01-B pavement patching (12" minimum thickness) 60      SQYD 200.00 12,000.00 230.00 13,800.00        
701-01-I cross drain pipe (24" rcp) 296      LNFT 180.00 53,280.00 130.00 38,480.00        
701-01-M cross drain pipe (36" rcp/bccsp) 56      LNFT 260.00 14,560.00 160.00 8,960.00        
701-01-O cross drain pipe (48" rcp/bccsp) 352      LNFT 280.00 98,560.00 200.00 70,400.00        
701-01-P cross drain pipe (54" rcp/bccsp) 176      LNFT 300.00 52,800.00 225.00 39,600.00        
701-08 relaying pipe 232      LNFT 135.00 31,320.00 180.00 41,760.00        
704-03 blocked out guard rail 87.5    LNFT 22.00 1,925.00 21.00 1,837.50        
704-08-B guard rail transitions (double thrie beam) 75.0    LNFT 66.00 4,950.00 60.00 4,500.00        
704-11-B guard rail end treatment (tangent) 3      EACH 2,800.00 8,400.00 2,500.00 7,500.00        
704-11-D guard rail end treatment (bct) 1      EACH 1,200.00 1,200.00 1,100.00 1,100.00        
712-02 sacked concrete revetment 316      SQYD 80.00 25,280.00 200.00 63,200.00        
713-01 temporary signs & barricades lump      LUMP 35,000.00 35,000.00 16,000.00 16,000.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
20.916  MILE 400.00 8,366.40 150.00 3,137.40        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
20.916  MILE 1.00 20.92 300.00 6,274.80        
713-04-A temporary pavement markings (solid line)(4" width) 56.972  MILE 1.00 56.97 550.00 31,334.60        
722-02 project site laboratory (equipped) 1      EACH 12,000.00 12,000.00 6,500.00 6,500.00        
726-01 bedding material 275.0    CUYD 100.00 27,500.00 114.43 31,468.25        
727-01 mobilization lump      LUMP 215,000.00 215,000.00 200,000.00 200,000.00        
729-16-B object marker assembly (type 2) 18      EACH 70.00 1,260.00 75.00 1,350.00        
729-16-C object marker assembly (type 3) 8      EACH 80.00 640.00 80.00 640.00        
731-02 reflectorized raised pavement markers 760      EACH 6.00 4,560.00 5.00 3,800.00        
732-02-A plastic pavement striping (solid line) (4" width) 14.243  MILE 3,000.00 42,729.00 2,500.00 35,607.50        
732-03-A plastic pavement striping (broken line)(4" width) 5.299  MILE 900.00 4,769.10 800.00 4,239.20        
732-05 removal of existing markings 0.036  MILE 6,500.00 234.00 11,000.00 396.00        
735-01 mailboxes 43      EACH 20.00 860.00 1.00 43.00        
735-02 mailbox supports (single) 33      EACH 140.00 4,620.00 150.00 4,950.00        
735-03 mailbox supports (double) 5      EACH 200.00 1,000.00 200.00 1,000.00        
740-01 construction layout lump      LUMP 15,000.00 15,000.00 23,000.00 23,000.00        
S-001 full depth sawcutting of concrete driveways 85      INFT 10.00 850.00 40.00 3,400.00        
S-002 cleaning existing ditches 400      LNFT 13.00 5,200.00 12.00 4,800.00        
                       
 CONTRACTOR TOTAL       3,599,024.95   3,732,880.45        