Letting of 9/26/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 319-01-0021
Parish: JACKSON
Routes: LA 155
Description: LA 542 - LA 146
Type Const: grading, drainage structures, in-place cement treated base course, cold planing
asph pavement, superpave asphaltic concrete overlay and related work.
Estimated Construction Cost: $2,454,512.63
 
RankLicenseBidderConstruction Bid
1 05789 D & J CONSTRUCTION CO., INC. $2,685,697.11
2 12312 GILCHRIST CONSTRUCTION CO. LLC $2,842,039.71
3 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,862,426.85
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 10,000.00 10,000.00 10,000.00 10,000.00 3,900.00 3,900.00    
202-02-D removal of concrete walks & drives 44      SQYD 18.00 792.00 40.00 1,760.00 26.00 1,144.00    
203-07 borrow (vehicular measurement) 2,105      CUYD 18.00 37,890.00 20.00 42,100.00 20.00 42,100.00    
203-07-A borrow (vehicular meas.)(selected soils) 2,689      CUYD 10.00 26,890.00 21.00 56,469.00 20.00 53,780.00    
308-01-A in-place cement treated base course (12" thick) 77,599      SQYD 10.00 775,990.00 9.50 737,190.50 11.25 872,988.75    
401-02 aggregate surface course (adjusted vehicular
measurement)
31      CUYD 85.00 2,635.00 100.00 3,100.00 105.00 3,255.00    
402-01 traffic maintenance aggregate (vehicular measurement) 722.7    CUYD 15.00 10,840.50 82.00 59,261.40 13.00 9,395.10    
502-01 superpave asphaltic concrete 12,058.2    TON 92.00 1,109,354.40 90.00 1,085,238.00 88.50 1,067,150.70    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,333.4    TON 92.00 122,672.80 130.00 173,342.00 125.00 166,675.00    
509-01 cold planing asphaltic pavement 67,950      SQYD 2.00 135,900.00 1.70 115,515.00 2.00 135,900.00    
509-02 contractor retained reclaimed asphaltic pavement - 1,866      CUYD 0.01 - 18.66 0.01 - 18.66 0.10 - 186.60    
701-01-M cross drain pipe (36" rcp/pcp) 92      LNFT 150.00 13,800.00 175.00 16,100.00 150.00 13,800.00    
701-01-N cross drain pipe (42" rcp/pcp) 100      LNFT 210.00 21,000.00 200.00 20,000.00 160.00 16,000.00    
701-05-I side drain pipe (24") 32      LNFT 95.00 3,040.00 150.00 4,800.00 80.00 2,560.00    
701-12-I corrugated metal pipe (extension)(24") 46      LNFT 165.00 7,590.00 150.00 6,900.00 150.00 6,900.00    
701-12-M corrugated metal pipe (extension)(36") 10      LNFT 175.00 1,750.00 180.00 1,800.00 150.00 1,500.00    
701-12-O corrugated metal pipe (extension)(48") 26      LNFT 220.00 5,720.00 200.00 5,200.00 160.00 4,160.00    
701-15 concrete collar 7      EACH 900.00 6,300.00 1,100.00 7,700.00 700.00 4,900.00    
702-02-B manholes (r-cb-11) 2      EACH 3,500.00 7,000.00 7,500.00 15,000.00 3,500.00 7,000.00    
702-03-A catch basins (cb-01) 1      EACH 3,200.00 3,200.00 4,000.00 4,000.00 3,500.00 3,500.00    
706-02-C concrete drive (6" thick) 36.2    SQYD 80.00 2,896.00 90.00 3,258.00 75.00 2,715.00    
713-01 temporary signs & barricades lump      LUMP 75,000.00 75,000.00 35,000.00 35,000.00 12,000.00 12,000.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
11.462  MILE 250.00 2,865.50 300.00 3,438.60 150.00 1,719.30    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
1.568  MILE 400.00 627.20 350.00 548.80 350.00 548.80    
713-04-A temporary pavement markings (solid line)(4" width) 44.068  MILE 1.00 44.07 1.00 44.07 700.00 30,847.60    
716-01-A mulch (vegetative) 11.07   ACRE 650.00 7,195.50 700.00 7,749.00 750.00 8,302.50    
717-01 seeding 498      LB 8.50 4,233.00 8.30 4,133.40 8.00 3,984.00    
718-01 fertilizer 11,070      LB 0.40 4,428.00 0.50 5,535.00 0.45 4,981.50    
726-01 bedding material 156.8    CUYD 90.00 14,112.00 100.00 15,680.00 100.00 15,680.00    
727-01 mobilization lump      LUMP 130,000.00 130,000.00 270,000.00 270,000.00 240,000.00 240,000.00    
729-16-B object marker assembly (type 2) 18      EACH 80.00 1,440.00 70.00 1,260.00 120.00 2,160.00    
731-02 reflectorized raised pavement markers 758      EACH 10.00 7,580.00 6.00 4,548.00 5.00 3,790.00    
732-02-A plastic pavement striping (solid line) (4" width) 22.034  MILE 3,000.00 66,102.00 3,000.00 66,102.00 2,500.00 55,085.00    
732-03-A plastic pavement striping (broken line)(4" width) 0.784  MILE 2,200.00 1,724.80 900.00 705.60 800.00 627.20    
735-01 mailboxes 14      EACH 2.00 28.00 20.00 280.00 1.00 14.00    
735-02 mailbox supports (single) 5      EACH 175.00 875.00 200.00 1,000.00 175.00 875.00    
735-03 mailbox supports (double) 3      EACH 200.00 600.00 250.00 750.00 225.00 675.00    
735-04 mailbox supports (multiple) 1      EACH 350.00 350.00 500.00 500.00 400.00 400.00    
740-01 construction layout lump      LUMP 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00    
S-001 cleaning existing ditches 550      LNFT 15.00 8,250.00 11.00 6,050.00 12.00 6,600.00    
S-002 tree trimming lump      LUMP 25,000.00 25,000.00 20,000.00 20,000.00 25,000.00 25,000.00    
                       
 CONTRACTOR TOTAL       2,685,697.11   2,842,039.71   2,862,426.85    