| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 4 - COASTAL BRIDGE CO., L.L.C. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,340.68 |
5,340.68 |
500.00 |
500.00 |
650.00 |
650.00 |
25,000.00 |
25,000.00 |
| 202-02-H |
removal of guard rail
|
100   |
LNFT |
8.00 |
800.00 |
8.00 |
800.00 |
20.00 |
2,000.00 |
8.00 |
800.00 |
| 202-02-I |
removal of asphalt drives
|
1,000   |
SQYD |
1.00 |
1,000.00 |
5.00 |
5,000.00 |
19.00 |
19,000.00 |
10.00 |
10,000.00 |
| 203-07 |
borrow (vehicular measurement)
|
500   |
CUYD |
10.00 |
5,000.00 |
8.00 |
4,000.00 |
15.00 |
7,500.00 |
10.00 |
5,000.00 |
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
3,960   |
CUYD |
5.00 |
19,800.00 |
8.00 |
31,680.00 |
15.00 |
59,400.00 |
15.00 |
59,400.00 |
| 204-02 |
temporary hay or straw bales
|
52   |
EACH |
8.00 |
416.00 |
8.00 |
416.00 |
47.00 |
2,444.00 |
8.00 |
416.00 |
| 204-06 |
temporary silt fencing
|
8,102   |
LNFT |
1.35 |
10,937.70 |
1.50 |
12,153.00 |
2.75 |
22,280.50 |
1.50 |
12,153.00 |
| 303-02 |
removal of existing patches
|
1,400   |
SQYD |
2.00 |
2,800.00 |
4.00 |
5,600.00 |
22.00 |
30,800.00 |
15.00 |
21,000.00 |
| 308-01-A |
in-place cement treated base course (12" thick)
|
70,932   |
SQYD |
7.80 |
553,269.60 |
8.00 |
567,456.00 |
7.20 |
510,710.40 |
8.50 |
602,922.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,027   |
CUYD |
10.00 |
10,270.00 |
20.00 |
20,540.00 |
31.00 |
31,837.00 |
94.00 |
96,538.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
5.00 |
2,500.00 |
10.00 |
5,000.00 |
66.00 |
33,000.00 |
1.00 |
500.00 |
| 502-01 |
superpave asphaltic concrete
|
13,160.6 |
TON |
65.00 |
855,439.00 |
65.00 |
855,439.00 |
70.00 |
921,242.00 |
72.00 |
947,563.20 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,209.9 |
TON |
100.00 |
120,990.00 |
130.00 |
157,287.00 |
130.00 |
157,287.00 |
100.00 |
120,990.00 |
| 509-01 |
cold planing asphaltic pavement
|
53,411   |
SQYD |
1.75 |
93,469.25 |
2.00 |
106,822.00 |
1.50 |
80,116.50 |
2.00 |
106,822.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,484   |
CUYD |
1.00 |
- 1,484.00 |
0.01 |
- 14.84 |
0.10 |
- 148.40 |
0.00 |
0.00 |
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
52   |
LNFT |
150.00 |
7,800.00 |
200.00 |
10,400.00 |
110.00 |
5,720.00 |
100.00 |
5,200.00 |
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
35.00 |
1,750.00 |
35.00 |
1,750.00 |
33.00 |
1,650.00 |
25.00 |
1,250.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,800.00 |
11,200.00 |
2,800.00 |
11,200.00 |
2,600.00 |
10,400.00 |
2,800.00 |
11,200.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
65,000.00 |
65,000.00 |
50,800.00 |
50,800.00 |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
| 713-02-E |
temporary pavement markings (24" width)
|
108   |
LNFT |
1.00 |
108.00 |
0.25 |
27.00 |
0.70 |
75.60 |
1.00 |
108.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
13.500 |
MILE |
1.00 |
13.50 |
500.00 |
6,750.00 |
150.00 |
2,025.00 |
400.00 |
5,400.00 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
9.780 |
MILE |
1.00 |
9.78 |
10.00 |
97.80 |
300.00 |
2,934.00 |
320.00 |
3,129.60 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
42.090 |
MILE |
1.00 |
42.09 |
10.00 |
420.90 |
600.00 |
25,254.00 |
480.00 |
20,203.20 |
| 722-01 |
project site laboratory
|
1   |
EACH |
500.00 |
500.00 |
2,000.00 |
2,000.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
| 726-01 |
bedding material
|
6.4 |
CUYD |
5.00 |
32.00 |
120.00 |
768.00 |
110.00 |
704.00 |
100.00 |
640.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
170,000.00 |
170,000.00 |
49,300.00 |
49,300.00 |
100,000.00 |
100,000.00 |
60,000.00 |
60,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
40   |
EACH |
80.00 |
3,200.00 |
80.00 |
3,200.00 |
88.00 |
3,520.00 |
75.00 |
3,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
854   |
EACH |
5.20 |
4,440.80 |
6.00 |
5,124.00 |
5.00 |
4,270.00 |
6.00 |
5,124.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
36   |
LNFT |
3.90 |
140.40 |
4.00 |
144.00 |
3.50 |
126.00 |
4.50 |
162.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
14.030 |
MILE |
2,650.00 |
37,179.50 |
2,800.00 |
39,284.00 |
2,500.00 |
35,075.00 |
3,000.00 |
42,090.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.260 |
MILE |
795.00 |
2,591.70 |
900.00 |
2,934.00 |
800.00 |
2,608.00 |
1,000.00 |
3,260.00 |
| 735-01 |
mailboxes
|
103   |
EACH |
1.00 |
103.00 |
5.00 |
515.00 |
1.00 |
103.00 |
10.00 |
1,030.00 |
| 735-02 |
mailbox supports (single)
|
103   |
EACH |
100.00 |
10,300.00 |
140.00 |
14,420.00 |
125.00 |
12,875.00 |
125.00 |
12,875.00 |
| 739-01 |
hydro-seeding
|
7.64 |
ACRE |
900.00 |
6,876.00 |
1,000.00 |
7,640.00 |
1,000.00 |
7,640.00 |
1,000.00 |
7,640.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
47,700.00 |
47,700.00 |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
| S-001 |
adjusting guardrail
|
150.0 |
LNFT |
18.00 |
2,700.00 |
20.00 |
3,000.00 |
17.00 |
2,550.00 |
40.00 |
6,000.00 |
| S-002 |
u-channel post installation
|
61   |
EACH |
45.00 |
2,745.00 |
50.00 |
3,050.00 |
50.00 |
3,050.00 |
85.00 |
5,185.00 |
| S-003 |
cleaning existing ditches
|
200   |
LNFT |
10.00 |
2,000.00 |
10.00 |
2,000.00 |
3.00 |
600.00 |
12.00 |
2,400.00 |
| S-004 |
sawcuts in concrete/asphalt driveways and turnouts
(full depth) |
72   |
LNFT |
10.00 |
720.00 |
20.00 |
1,440.00 |
50.00 |
3,600.00 |
20.00 |
1,440.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,035,000.00 |
|
2,036,642.86 |
|
2,147,898.60 |
|
2,261,441.00 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - BARBER BROS. CONTRACTING CO., L.L.C |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
100   |
LNFT |
12.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-I |
removal of asphalt drives
|
1,000   |
SQYD |
10.00 |
10,000.00 |
|
|
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
500   |
CUYD |
25.00 |
12,500.00 |
|
|
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
3,960   |
CUYD |
10.00 |
39,600.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
52   |
EACH |
20.00 |
1,040.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
8,102   |
LNFT |
2.00 |
16,204.00 |
|
|
|
|
|
|
| 303-02 |
removal of existing patches
|
1,400   |
SQYD |
15.00 |
21,000.00 |
|
|
|
|
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
70,932   |
SQYD |
7.50 |
531,990.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,027   |
CUYD |
65.00 |
66,755.00 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
70.00 |
35,000.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
13,160.6 |
TON |
75.00 |
987,045.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,209.9 |
TON |
100.00 |
120,990.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
53,411   |
SQYD |
2.00 |
106,822.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,484   |
CUYD |
0.00 |
0.00 |
|
|
|
|
|
|
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
52   |
LNFT |
250.00 |
13,000.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
25.00 |
1,250.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,400.00 |
9,600.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
60,000.00 |
60,000.00 |
|
|
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
108   |
LNFT |
2.00 |
216.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
13.500 |
MILE |
350.00 |
4,725.00 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
9.780 |
MILE |
350.00 |
3,423.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
42.090 |
MILE |
500.00 |
21,045.00 |
|
|
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
6.4 |
CUYD |
100.00 |
640.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
50,000.00 |
50,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
40   |
EACH |
80.00 |
3,200.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
854   |
EACH |
6.00 |
5,124.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
36   |
LNFT |
5.00 |
180.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
14.030 |
MILE |
3,200.00 |
44,896.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.260 |
MILE |
1,000.00 |
3,260.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
103   |
EACH |
25.00 |
2,575.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
103   |
EACH |
220.00 |
22,660.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
7.64 |
ACRE |
1,500.00 |
11,460.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| S-001 |
adjusting guardrail
|
150.0 |
LNFT |
50.00 |
7,500.00 |
|
|
|
|
|
|
| S-002 |
u-channel post installation
|
61   |
EACH |
60.00 |
3,660.00 |
|
|
|
|
|
|
| S-003 |
cleaning existing ditches
|
200   |
LNFT |
25.00 |
5,000.00 |
|
|
|
|
|
|
| S-004 |
sawcuts in concrete/asphalt driveways and turnouts
(full depth) |
72   |
LNFT |
25.00 |
1,800.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,270,360.00 |
|
|
|
|
|
|
|