| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
830   |
LNFT |
5.00 |
4,150.00 |
9.50 |
7,885.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
2,000   |
CUYD |
10.00 |
20,000.00 |
17.00 |
34,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
26   |
EACH |
8.00 |
208.00 |
46.00 |
1,196.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
4,699   |
LNFT |
1.35 |
6,343.65 |
2.50 |
11,747.50 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,455   |
CUYD |
25.00 |
36,375.00 |
22.00 |
32,010.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
CUYD |
5.00 |
500.00 |
120.00 |
12,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
13,916.8 |
TON |
65.00 |
904,592.00 |
62.50 |
869,800.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,820.5 |
TON |
1.00 |
1,820.50 |
135.00 |
245,767.50 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
69,475   |
SQYD |
1.50 |
104,212.50 |
1.10 |
76,422.50 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,171   |
CUYD |
10.00 |
- 21,710.00 |
0.10 |
- 217.10 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
3,760   |
SQYD |
67.00 |
251,920.00 |
71.00 |
266,960.00 |
|
|
|
|
| 510-02 |
pavement widening
|
187.8 |
SQYD |
20.00 |
3,756.00 |
97.00 |
18,216.60 |
|
|
|
|
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
80   |
LNFT |
125.00 |
10,000.00 |
95.00 |
7,600.00 |
|
|
|
|
| 701-02-E |
cross drain pipe arch (30" equiv. rcpa)
|
124   |
LNFT |
175.00 |
21,700.00 |
115.00 |
14,260.00 |
|
|
|
|
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
268   |
LNFT |
200.00 |
53,600.00 |
135.00 |
36,180.00 |
|
|
|
|
| 701-02-I |
cross drain pipe arch (54" equiv. rcpa)
|
96   |
LNFT |
300.00 |
28,800.00 |
300.00 |
28,800.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
300.0 |
LNFT |
35.00 |
10,500.00 |
50.00 |
15,000.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
234.0 |
LNFT |
49.00 |
11,466.00 |
6.00 |
1,404.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
318.8 |
LNFT |
18.00 |
5,738.40 |
22.00 |
7,013.60 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,200.00 |
8,800.00 |
2,500.00 |
10,000.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
8   |
EACH |
2,500.00 |
20,000.00 |
2,600.00 |
20,800.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
119,978.65 |
119,978.65 |
25,000.00 |
25,000.00 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
288   |
LNFT |
1.00 |
288.00 |
0.65 |
187.20 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
14.880 |
MILE |
175.00 |
2,604.00 |
140.00 |
2,083.20 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
12.000 |
MILE |
325.00 |
3,900.00 |
300.00 |
3,600.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
41.430 |
MILE |
5.00 |
207.15 |
600.00 |
24,858.00 |
|
|
|
|
| 713-05-D |
temporary pavement legends and symbols (rr crossing)
|
6   |
EACH |
225.00 |
1,350.00 |
225.00 |
1,350.00 |
|
|
|
|
| 726-01 |
bedding material
|
116.0 |
CUYD |
20.00 |
2,320.00 |
70.00 |
8,120.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
163,000.00 |
163,000.00 |
126,600.00 |
126,600.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
48   |
EACH |
70.00 |
3,360.00 |
90.00 |
4,320.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
784   |
EACH |
5.25 |
4,116.00 |
5.00 |
3,920.00 |
|
|
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
588   |
LNFT |
0.45 |
264.60 |
0.55 |
323.40 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
96   |
LNFT |
3.35 |
321.60 |
3.25 |
312.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
13.810 |
MILE |
2,900.00 |
40,049.00 |
2,500.00 |
34,525.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.000 |
MILE |
790.00 |
3,160.00 |
750.00 |
3,000.00 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
425.00 |
850.00 |
450.00 |
900.00 |
|
|
|
|
| 735-01 |
mailboxes
|
80   |
EACH |
1.00 |
80.00 |
1.00 |
80.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
80   |
EACH |
100.00 |
8,000.00 |
115.00 |
9,200.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
6.01 |
ACRE |
895.00 |
5,378.95 |
1,100.00 |
6,611.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
45,000.00 |
45,000.00 |
27,000.00 |
27,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,887,000.00 |
|
1,998,835.40 |
|
|
|
|
|