| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
2,725   |
LNFT |
9.00 |
24,525.00 |
9.00 |
24,525.00 |
|
|
|
|
| 202-02-J |
removal of cattleguard (rt of c.s.l.m. 12.78)
|
1   |
EACH |
2,200.00 |
2,200.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
3,109   |
CUYD |
19.00 |
59,071.00 |
20.00 |
62,180.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
24   |
EACH |
50.00 |
1,200.00 |
10.00 |
240.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
5,000   |
LNFT |
2.25 |
11,250.00 |
2.00 |
10,000.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
532   |
CUYD |
60.00 |
31,920.00 |
70.00 |
37,240.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
12,250.2 |
TON |
71.00 |
869,764.20 |
72.00 |
882,014.40 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,415.7 |
TON |
110.00 |
155,727.00 |
72.00 |
101,930.40 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
1,147   |
SQYD |
17.00 |
19,499.00 |
3.00 |
3,441.00 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
523   |
SQYD |
85.00 |
44,455.00 |
85.00 |
44,455.00 |
|
|
|
|
| 701-02-D/E |
cross drain pipe arch (24" equiv. rcpa or 30" equiv.
cmpa) |
65   |
LNFT |
90.00 |
5,850.00 |
200.00 |
13,000.00 |
|
|
|
|
| 701-02-G/H |
cross drain pipe arch (42" equiv. rcpa or 48" equiv.
cmpa) |
52   |
LNFT |
185.00 |
9,620.00 |
300.00 |
15,600.00 |
|
|
|
|
| 701-05-G-01 |
side drain pipe (18") (erosion)
|
80   |
LNFT |
60.00 |
4,800.00 |
80.00 |
6,400.00 |
|
|
|
|
| 701-05-M |
side drain pipe (36")
|
40   |
LNFT |
125.00 |
5,000.00 |
200.00 |
8,000.00 |
|
|
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 702-04-D |
adjusting gas valve
|
2   |
EACH |
1,100.00 |
2,200.00 |
200.00 |
400.00 |
|
|
|
|
| 702-04-E |
adjusting water valve
|
2   |
EACH |
950.00 |
1,900.00 |
200.00 |
400.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
562.5 |
LNFT |
35.00 |
19,687.50 |
55.00 |
30,937.50 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
860.0 |
LNFT |
55.00 |
47,300.00 |
40.00 |
34,400.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
875.0 |
LNFT |
13.00 |
11,375.00 |
22.00 |
19,250.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
24   |
EACH |
1,990.00 |
47,760.00 |
2,500.00 |
60,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
14,000.00 |
14,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
7.470 |
MILE |
150.00 |
1,120.50 |
130.00 |
971.10 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.470 |
MILE |
300.00 |
2,241.00 |
30.00 |
224.10 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
56.100 |
MILE |
500.00 |
28,050.00 |
50.00 |
2,805.00 |
|
|
|
|
| 726-01 |
bedding material
|
40.2 |
CUYD |
90.00 |
3,618.00 |
70.00 |
2,814.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
94,745.00 |
94,745.00 |
70,000.00 |
70,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
64   |
EACH |
75.00 |
4,800.00 |
90.00 |
5,760.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
718   |
EACH |
5.50 |
3,949.00 |
6.00 |
4,308.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
18.700 |
MILE |
3,000.00 |
56,100.00 |
2,800.00 |
52,360.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.490 |
MILE |
825.00 |
2,054.25 |
900.00 |
2,241.00 |
|
|
|
|
| 735-01 |
mailboxes
|
13   |
EACH |
1.00 |
13.00 |
5.00 |
65.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
13   |
EACH |
125.00 |
1,625.00 |
150.00 |
1,950.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
1.32 |
ACRE |
1,250.00 |
1,650.00 |
1,500.00 |
1,980.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
26,000.00 |
26,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-001 |
cleaning existing ditches
|
400   |
LNFT |
3.25 |
1,300.00 |
8.00 |
3,200.00 |
|
|
|
|
| S-002 |
u-channel post installation
|
95   |
EACH |
55.00 |
5,225.00 |
55.00 |
5,225.00 |
|
|
|
|
| S-003 |
surface preparation
|
lump |
LUMP |
42,000.00 |
42,000.00 |
120,000.00 |
120,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,664,594.45 |
|
1,694,316.50 |
|
|
|
|
|