| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - D & J CONSTRUCTION CO., INC. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
2,400.00 |
2,400.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
42   |
SQYD |
69.00 |
2,898.00 |
10.00 |
420.00 |
45.00 |
1,890.00 |
|
|
| 202-02-H |
removal of guard rail
|
1,524   |
LNFT |
10.00 |
15,240.00 |
9.00 |
13,716.00 |
10.00 |
15,240.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
527   |
CUYD |
20.00 |
10,540.00 |
20.00 |
10,540.00 |
18.00 |
9,486.00 |
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
598   |
CUYD |
20.00 |
11,960.00 |
15.00 |
8,970.00 |
20.00 |
11,960.00 |
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
10,728   |
SQYD |
11.25 |
120,690.00 |
11.00 |
118,008.00 |
8.75 |
93,870.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,071   |
CUYD |
54.00 |
111,834.00 |
16.00 |
33,136.00 |
60.00 |
124,260.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
14,216.6 |
TON |
85.00 |
1,208,411.00 |
90.00 |
1,279,494.00 |
95.00 |
1,350,577.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,044.1 |
TON |
125.00 |
130,512.50 |
120.00 |
125,292.00 |
150.00 |
156,615.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
79,776   |
SQYD |
1.25 |
99,720.00 |
2.00 |
159,552.00 |
2.50 |
199,440.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,330   |
CUYD |
0.10 |
- 333.00 |
0.01 |
- 33.30 |
0.01 |
- 33.30 |
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
1,204   |
SQYD |
92.00 |
110,768.00 |
100.00 |
120,400.00 |
115.00 |
138,460.00 |
|
|
| 704-03 |
blocked out guard rail
|
1,174.6 |
LNFT |
18.00 |
21,142.80 |
18.00 |
21,142.80 |
20.00 |
23,492.00 |
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
150.0 |
LNFT |
40.00 |
6,000.00 |
36.00 |
5,400.00 |
40.00 |
6,000.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
300.0 |
LNFT |
55.00 |
16,500.00 |
55.00 |
16,500.00 |
60.00 |
18,000.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
12   |
EACH |
2,000.00 |
24,000.00 |
2,100.00 |
25,200.00 |
2,000.00 |
24,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
9,000.00 |
9,000.00 |
125,000.00 |
125,000.00 |
100,000.00 |
100,000.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
14.763 |
MILE |
150.00 |
2,214.45 |
225.00 |
3,321.68 |
500.00 |
7,381.50 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
14.168 |
MILE |
3.50 |
49.59 |
350.00 |
4,958.80 |
600.00 |
8,500.80 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
31.335 |
MILE |
700.00 |
21,934.50 |
1.00 |
31.34 |
900.00 |
28,201.50 |
|
|
| 716-01-A |
mulch (vegetative)
|
19.1 |
TON |
400.00 |
7,640.00 |
400.00 |
7,640.00 |
450.00 |
8,595.00 |
|
|
| 717-01 |
seeding
|
430   |
LB |
7.00 |
3,010.00 |
8.00 |
3,440.00 |
8.00 |
3,440.00 |
|
|
| 718-01 |
fertilizer
|
9,550   |
LB |
0.45 |
4,297.50 |
0.38 |
3,629.00 |
0.50 |
4,775.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
195,000.00 |
195,000.00 |
150,000.00 |
150,000.00 |
260,000.00 |
260,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
12   |
EACH |
75.00 |
900.00 |
75.00 |
900.00 |
85.00 |
1,020.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
651   |
EACH |
5.00 |
3,255.00 |
8.00 |
5,208.00 |
6.50 |
4,231.50 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
10.445 |
MILE |
2,500.00 |
26,112.50 |
3,000.00 |
31,335.00 |
3,000.00 |
31,335.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.723 |
MILE |
850.00 |
4,014.55 |
1,600.00 |
7,556.80 |
950.00 |
4,486.85 |
|
|
| 735-01 |
mailboxes
|
22   |
EACH |
1.00 |
22.00 |
2.00 |
44.00 |
25.00 |
550.00 |
|
|
| 735-02 |
mailbox supports (single)
|
15   |
EACH |
150.00 |
2,250.00 |
150.00 |
2,250.00 |
225.00 |
3,375.00 |
|
|
| 735-03 |
mailbox supports (double)
|
3   |
EACH |
200.00 |
600.00 |
200.00 |
600.00 |
275.00 |
825.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
350.00 |
350.00 |
350.00 |
350.00 |
375.00 |
375.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
13,000.00 |
13,000.00 |
11,000.00 |
11,000.00 |
25,000.00 |
25,000.00 |
|
|
| S-001 |
rumble strips (ground-in)
|
0.2 |
MILE |
35,000.00 |
7,000.00 |
4,000.00 |
800.00 |
30,000.00 |
6,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,192,933.39 |
|
2,305,802.12 |
|
2,681,348.85 |
|
|
|