| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - FORBY CONTRACTING, INC. |
- 2 - URETEK USA, INC. |
- 3 - KNISH CORPORATION |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 601-04 |
portland cement concrete pavement coring
|
15   |
EACH |
75.00 |
1,125.00 |
275.00 |
4,125.00 |
100.00 |
1,500.00 |
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
24,984   |
LNFT |
1.50 |
37,476.00 |
1.65 |
41,223.60 |
1.75 |
43,722.00 |
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
29,980   |
LNFT |
1.75 |
52,465.00 |
1.93 |
57,861.40 |
1.75 |
52,465.00 |
|
|
| 602-03 |
cleaning and sealing cracks
|
3,570   |
LNFT |
3.00 |
10,710.00 |
3.30 |
11,781.00 |
3.00 |
10,710.00 |
|
|
| 602-05-G-01 |
full depth patching of jointed conc pvmt (8" thick)
(16.0 sq yds & under) |
700.0 |
SQYD |
195.00 |
136,500.00 |
214.50 |
150,150.00 |
250.00 |
175,000.00 |
|
|
| 602-05-G-02 |
full depth patching of jointed conc pvmt (8" thick)
(16.1-48.0 sq yds) |
925.0 |
SQYD |
175.00 |
161,875.00 |
203.50 |
188,237.50 |
250.00 |
231,250.00 |
|
|
| 602-05-G-03 |
full depth patching of jointed conc pvmt (8" thick)
(48.1 sq yds & over) |
1,800.0 |
SQYD |
150.00 |
270,000.00 |
192.50 |
346,500.00 |
250.00 |
450,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
75,000.00 |
75,000.00 |
70,812.50 |
70,812.50 |
283,750.00 |
283,750.00 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.500 |
MILE |
286.00 |
715.00 |
275.00 |
687.50 |
286.00 |
715.00 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
2.500 |
MILE |
572.00 |
1,430.00 |
550.00 |
1,375.00 |
572.00 |
1,430.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
180,000.00 |
180,000.00 |
100,000.00 |
100,000.00 |
75,000.00 |
75,000.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
24   |
LNFT |
2.98 |
71.52 |
110.00 |
2,640.00 |
2.98 |
71.52 |
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
450.00 |
900.00 |
2,200.00 |
4,400.00 |
450.00 |
900.00 |
|
|
| 735-01 |
mailboxes
|
5   |
EACH |
1.00 |
5.00 |
110.00 |
550.00 |
100.00 |
500.00 |
|
|
| 735-02 |
mailbox supports (single)
|
4   |
EACH |
150.00 |
600.00 |
165.00 |
660.00 |
250.00 |
1,000.00 |
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
195.00 |
195.00 |
214.50 |
214.50 |
250.00 |
250.00 |
|
|
| S-001 |
raising and/or undersealing concrete slabs
(polyurethane) |
225,000   |
LB |
4.60 |
1,035,000.00 |
4.50 |
1,012,500.00 |
3.75 |
843,750.00 |
|
|
| S-002 |
sawing existing pavement joints
|
25,428   |
LNFT |
2.50 |
63,570.00 |
4.95 |
125,868.60 |
1.00 |
25,428.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,027,637.52 |
|
2,119,586.60 |
|
2,197,441.52 |
|
|
|