Lead Project: 034-02-0039
Parish: SABINE
Routes: LA 6
Description: CAMINO REAL HISTORICAL HIGHWAY SIGN
Type Const: installation of interpretive sign, sidewalks, parking lot, landscaping and related
work.
Estimated Construction Cost: $255,058.75
 
RankLicenseBidderConstruction Bid
1 32044 QUALITY DESIGN & CONSTRUCTION, INC. $263,522.23
 27239 APECK CONSTRUCTION, INC. IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
QUALITY DESIGN & CONSTRUCTION, INC.

APECK CONSTRUCTION, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 15,000.00 15,000.00 5,000.00 5,000.00        
202-02-G removal of surfacing & stabilized base 135.0    SQYD 14.00 1,890.00 26.00 3,510.00        
203-05 excavation and embankment lump      LUMP 12,300.00 12,300.00 7,088.00 7,088.00        
203-08 geotextile fabric 1,750      SQYD 1.55 2,712.50 1.30 2,275.00        
204-02 temporary hay or straw bales 50      EACH 14.00 700.00 13.00 650.00        
204-06 temporary silt fencing 500      LNFT 2.10 1,050.00 3.00 1,500.00        
302-02-B class ii base course (6" thick) 1,749.5    SQYD 21.20 37,089.40 12.83 22,446.09        
306-02-A scarifying and compacting roadbed (6" thick) 1,750      SQYD 2.80 4,900.00 1.50 2,625.00        
706-01-A concrete walk (4" thick) 140.1    SQYD 43.30 6,066.33 44.10 6,178.41        
706-02-C concrete drive (6" thick) 1,641.4    SQYD 51.00 83,711.40 49.50 81,249.30        
713-01 temporary signs & barricades lump      LUMP 7,890.00 7,890.00 350.00 350.00        
717-01 seeding 50      LB 7.40 370.00 6.98 349.00        
718-01 fertilizer 500      LB 1.10 550.00 0.52 260.00        
718-02 agricultural lime 0.5    TON 1,050.00 525.00 302.64 151.32        
719-01-A plants (pride of mobile azalea, rhododendron indicum,
3 gal)
38      EACH 13.20 501.60 14.90 566.20        
719-01-B plants (green liriope, liriope muscari, 4" pot) 270      EACH 2.50 675.00 3.36 907.20        
719-01-C plants (bridal wreath spiria, spiraea vanhoutti, 12"
spread, 3 gal)
9      EACH 13.00 117.00 14.90 134.10        
719-01-D plants (foster holly, ilex attenuata forsteri, 8'-10'
ht, tree form, 15 gal)
1      EACH 138.00 138.00 91.96 91.96        
719-01-E plants (loropetalum, loropetalum chinense, 3 gal) 11      EACH 13.00 143.00 14.90 163.90        
719-01-F plants (natchez crape myrtle, lagerstormia indica,
8'-10' ht, 1 - 1 1/2" caliper, min 5 canes)
6      EACH 220.00 1,320.00 209.52 1,257.12        
719-01-G plants (miscanthus grass, miscanthus sinensis, 4"
spread, 3 gal)
12      EACH 28.00 336.00 14.90 178.80        
719-01-H plants (aspidistria, aspidistra elatior, 18" spread,
3 gal)
18      EACH 28.00 504.00 14.90 268.20        
719-01-I plants (hydrangea (pink), hydrangea macrophylia, 3 gal) 3      EACH 13.00 39.00 16.99 50.97        
719-01-J plants (frost proof gardinia, gardenia jasminoides
"frost proof", 18" spread, 3 gal)
18      EACH 13.00 234.00 14.90 268.20        
719-01-K plants (lantana, lantana montevidensis, 4" pot) 72      EACH 2.50 180.00 3.36 241.92        
719-01-L plants (river birch, brtula nigra, 1 1/2"-2" canes
(3 min.), 30 gal)
3      EACH 250.00 750.00 261.90 785.70        
719-02-A top dressing mulch (4" depth) 139      SQYD 7.90 1,098.10 3.20 444.80        
719-03-A bed preparation (12" depth) 139      SQYD 26.10 3,627.90 4.42 614.38        
727-01 mobilization lump      LUMP 6,500.00 6,500.00 1,050.00 1,050.00        
730-09 electrical system lump      LUMP 20,650.00 20,650.00 10,690.00 10,690.00        
737-03-A painted traffic striping (solid line)(4" width) 370      LNFT 4.20 1,554.00 2.00 740.00        
740-01 construction layout lump      LUMP 6,400.00 6,400.00 2,500.00 2,500.00        
S-001 irrigation system lump      LUMP 3,500.00 3,500.00 6,052.80 6,052.80        
S-002 sign structure lump      LUMP 40,500.00 40,500.00 35,000.00 35,000.00        
                       
 CONTRACTOR TOTAL       263,522.23   IRREGULAR        