| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
25,000.00 |
25,000.00 |
19,000.00 |
19,000.00 |
50,000.00 |
50,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
243   |
SQYD |
25.00 |
6,075.00 |
34.00 |
8,262.00 |
40.00 |
9,720.00 |
|
|
| 202-02-E |
removal of concrete curbs
|
356.0 |
LNFT |
10.00 |
3,560.00 |
11.00 |
3,916.00 |
20.00 |
7,120.00 |
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
778.7 |
LNFT |
15.00 |
11,680.50 |
17.00 |
13,237.90 |
25.00 |
19,467.50 |
|
|
| 502-01 |
superpave asphaltic concrete
|
4,826.4 |
TON |
106.00 |
511,598.40 |
103.00 |
497,119.20 |
125.00 |
603,300.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
434.1 |
TON |
132.00 |
57,301.20 |
225.00 |
97,672.50 |
175.00 |
75,967.50 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
47,821   |
SQYD |
3.00 |
143,463.00 |
3.50 |
167,373.50 |
2.95 |
141,071.95 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,997   |
CUYD |
0.01 |
- 19.97 |
0.10 |
- 199.70 |
0.01 |
- 19.97 |
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
156   |
SQYD |
200.00 |
31,200.00 |
268.00 |
41,808.00 |
190.00 |
29,640.00 |
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
13,878   |
LNFT |
2.20 |
30,531.60 |
2.75 |
38,164.50 |
1.50 |
20,817.00 |
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
5,568   |
LNFT |
2.65 |
14,755.20 |
3.25 |
18,096.00 |
1.70 |
9,465.60 |
|
|
| 602-05-G-01 |
full depth patching of jointed conc pvmt (8" thick)
(16.0 sq yds & under) |
121.7 |
SQYD |
180.00 |
21,906.00 |
275.00 |
33,467.50 |
180.00 |
21,906.00 |
|
|
| 602-05-G-02 |
full depth patching of jointed conc pvmt (8" thick)
(16.1-48.0 sq yds) |
157.4 |
SQYD |
165.00 |
25,971.00 |
250.00 |
39,350.00 |
170.00 |
26,758.00 |
|
|
| 602-05-G-03 |
full depth patching of jointed conc pvmt (8" thick)
(48.1 sq yds & over) |
173.3 |
SQYD |
155.00 |
26,861.50 |
225.00 |
38,992.50 |
150.00 |
25,995.00 |
|
|
| 702-04-A |
adjusting manholes
|
2   |
EACH |
2,000.00 |
4,000.00 |
3,500.00 |
7,000.00 |
875.00 |
1,750.00 |
|
|
| 702-04-B |
adjusting catch basins
|
10   |
EACH |
3,500.00 |
35,000.00 |
5,750.00 |
57,500.00 |
875.00 |
8,750.00 |
|
|
| 706-01-A |
concrete walk (4" thick)
|
379.1 |
SQYD |
75.00 |
28,432.50 |
100.00 |
37,910.00 |
75.00 |
28,432.50 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
9.6 |
SQYD |
100.00 |
960.00 |
125.00 |
1,200.00 |
200.00 |
1,920.00 |
|
|
| 707-01 |
concrete curb
|
248.5 |
LNFT |
30.00 |
7,455.00 |
38.00 |
9,443.00 |
25.00 |
6,212.50 |
|
|
| 707-03 |
combination concrete curb & gutter
|
401.1 |
LNFT |
45.00 |
18,049.50 |
60.00 |
24,066.00 |
44.00 |
17,648.40 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
136,000.00 |
136,000.00 |
45,000.00 |
45,000.00 |
115,000.00 |
115,000.00 |
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
1,142   |
LNFT |
3.00 |
3,426.00 |
0.83 |
947.86 |
1.30 |
1,484.60 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.052 |
MILE |
250.00 |
763.00 |
200.00 |
610.40 |
440.00 |
1,342.88 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.106 |
MILE |
350.00 |
2,137.10 |
400.00 |
2,442.40 |
620.00 |
3,785.72 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
12.210 |
MILE |
450.00 |
5,494.50 |
700.00 |
8,547.00 |
990.00 |
12,087.90 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
136,000.00 |
136,000.00 |
125,000.00 |
125,000.00 |
145,000.00 |
145,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,688   |
EACH |
9.00 |
24,192.00 |
6.00 |
16,128.00 |
6.50 |
17,472.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
571   |
LNFT |
12.00 |
6,852.00 |
4.00 |
2,284.00 |
5.00 |
2,855.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.857 |
MILE |
3,500.00 |
27,499.50 |
2,600.00 |
20,428.20 |
3,400.00 |
26,713.80 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.929 |
MILE |
2,000.00 |
7,858.00 |
1,200.00 |
4,714.80 |
1,000.00 |
3,929.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
12,000.00 |
12,000.00 |
75,000.00 |
75,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,364,002.53 |
|
1,391,481.56 |
|
1,510,592.88 |
|
|
|