| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - D & J CONSTRUCTION CO., INC. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-F |
removal of concrete combination curb & gutter
|
601.0 |
LNFT |
18.00 |
10,818.00 |
16.00 |
9,616.00 |
10.00 |
6,010.00 |
|
|
| 202-02-H |
removal of guard rail
|
208   |
LNFT |
17.50 |
3,640.00 |
14.00 |
2,912.00 |
20.00 |
4,160.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
11,352.3 |
TON |
91.00 |
1,033,059.30 |
95.00 |
1,078,468.50 |
108.00 |
1,226,048.40 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
520.1 |
TON |
175.00 |
91,017.50 |
95.00 |
49,409.50 |
150.00 |
78,015.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
70,639   |
SQYD |
2.50 |
176,597.50 |
2.25 |
158,937.75 |
1.60 |
113,022.40 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,950   |
CUYD |
0.10 |
- 295.00 |
0.01 |
- 29.50 |
0.01 |
- 29.50 |
|
|
| 510-01-C |
pavement patching (18" minimum thickness)
|
2,197   |
SQYD |
110.00 |
241,670.00 |
150.00 |
329,550.00 |
90.00 |
197,730.00 |
|
|
| 702-04-A |
adjusting manholes
|
7   |
EACH |
2,000.00 |
14,000.00 |
2,000.00 |
14,000.00 |
1,000.00 |
7,000.00 |
|
|
| 702-04-B |
adjusting catch basins
|
8   |
EACH |
3,500.00 |
28,000.00 |
3,200.00 |
25,600.00 |
1,300.00 |
10,400.00 |
|
|
| 704-03 |
blocked out guard rail
|
25.0 |
LNFT |
25.00 |
625.00 |
20.00 |
500.00 |
22.00 |
550.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
50.0 |
LNFT |
55.00 |
2,750.00 |
55.00 |
2,750.00 |
55.00 |
2,750.00 |
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
2   |
EACH |
2,650.00 |
5,300.00 |
2,600.00 |
5,200.00 |
2,600.00 |
5,200.00 |
|
|
| 707-03 |
combination concrete curb & gutter
|
601.0 |
LNFT |
50.00 |
30,050.00 |
50.00 |
30,050.00 |
33.00 |
19,833.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
70,000.00 |
70,000.00 |
80,000.00 |
80,000.00 |
130,000.00 |
130,000.00 |
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
460   |
LNFT |
0.20 |
92.00 |
2.00 |
920.00 |
0.50 |
230.00 |
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
310   |
LNFT |
0.60 |
186.00 |
4.00 |
1,240.00 |
1.00 |
310.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
9.944 |
MILE |
135.00 |
1,342.44 |
225.00 |
2,237.40 |
400.00 |
3,977.60 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
13.954 |
MILE |
265.00 |
3,697.81 |
250.00 |
3,488.50 |
1.00 |
13.95 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
21.592 |
MILE |
600.00 |
12,955.20 |
350.00 |
7,557.20 |
1.00 |
21.59 |
|
|
| 713-05-D |
temporary pavement legends and symbols (rr crossing)
|
10   |
EACH |
225.00 |
2,250.00 |
275.00 |
2,750.00 |
1.00 |
10.00 |
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
2,626   |
EACH |
0.40 |
1,050.40 |
2.00 |
5,252.00 |
1.00 |
2,626.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
0.7 |
TON |
1,600.00 |
1,120.00 |
4,200.00 |
2,940.00 |
1,800.00 |
1,260.00 |
|
|
| 717-01 |
seeding
|
15   |
LB |
13.00 |
195.00 |
110.00 |
1,650.00 |
14.00 |
210.00 |
|
|
| 718-01 |
fertilizer
|
331   |
LB |
3.00 |
993.00 |
5.00 |
1,655.00 |
3.00 |
993.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
150,000.00 |
150,000.00 |
84,000.00 |
84,000.00 |
200,000.00 |
200,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
2   |
EACH |
80.00 |
160.00 |
75.00 |
150.00 |
80.00 |
160.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
3,472   |
EACH |
5.00 |
17,360.00 |
6.50 |
22,568.00 |
5.50 |
19,096.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
230   |
LNFT |
1.25 |
287.50 |
6.00 |
1,380.00 |
1.00 |
230.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
743   |
LNFT |
3.25 |
2,414.75 |
7.50 |
5,572.50 |
3.90 |
2,897.70 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
10.795 |
MILE |
2,500.00 |
26,987.50 |
2,500.00 |
26,987.50 |
3,200.00 |
34,544.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
6.877 |
MILE |
800.00 |
5,501.60 |
1,400.00 |
9,627.80 |
900.00 |
6,189.30 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
30   |
EACH |
150.00 |
4,500.00 |
300.00 |
9,000.00 |
200.00 |
6,000.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
150.00 |
300.00 |
500.00 |
1,000.00 |
290.00 |
580.00 |
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
5   |
EACH |
500.00 |
2,500.00 |
1,100.00 |
5,500.00 |
490.00 |
2,450.00 |
|
|
| 736-09 |
loop detector
|
371   |
LNFT |
17.00 |
6,307.00 |
15.00 |
5,565.00 |
18.00 |
6,678.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
12,000.00 |
12,000.00 |
7,000.00 |
7,000.00 |
40,000.00 |
40,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,959,432.50 |
|
1,995,005.15 |
|
2,129,166.44 |
|
|
|