Letting of 9/26/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 012-09-0014
Parish: ACADIA
Routes: US 190
Description: JEFFERSON DAVIS PARISH LINE - EVANGELINE PARISH LINE
Type Const: asphaltic surface treatment, pavement patching, superpave asphaltic concrete pavement
overlay, and related work
Estimated Construction Cost: $471,990.80
 
RankLicenseBidderConstruction Bid
1 00183 R. E. HEIDT CONSTRUCTION CO., INC. $406,518.59
2 34356 PRAIRIE CONTRACTORS INC. $534,056.70
3 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $565,663.80
4 12312 GILCHRIST CONSTRUCTION CO. LLC $627,950.94
 
Item Number Item Description Quantity Unit of Measure - 1 -
R. E. HEIDT CONSTRUCTION CO., INC.
- 2 -
PRAIRIE CONTRACTORS INC.
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 4 -
GILCHRIST CONSTRUCTION CO. LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-07 borrow (vehicular measurement) 350      CUYD 10.00 3,500.00 50.00 17,500.00 18.00 6,300.00 25.00 8,750.00
204-05-A temporary sediment check dams (hay) 4      EACH 174.00 696.00 200.00 800.00 350.00 1,400.00 200.00 800.00
401-02 aggregate surface course (adjusted vehicular
measurement)
10      CUYD 598.00 5,980.00 100.00 1,000.00 120.00 1,200.00 200.00 2,000.00
502-01 superpave asphaltic concrete 3,029.3    TON 78.50 237,800.05 88.00 266,578.40 98.00 296,871.40 110.00 333,223.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
100.0    TON 122.00 12,200.00 150.00 15,000.00 150.00 15,000.00 230.00 23,000.00
507-01 asphaltic material (type e) 8,537      GAL 2.63 22,452.31 3.00 25,611.00 4.50 38,416.50 4.25 36,282.25
507-02-B aggregate (s2) 12,554      SQYD 2.37 29,752.98 2.50 31,385.00 1.65 20,714.10 1.90 23,852.60
507-02-C aggregate (s3) 12,554      SQYD 2.10 26,363.40 2.50 31,385.00 1.50 18,831.00 1.75 21,969.50
509-01 cold planing asphaltic pavement 1,200      SQYD 4.45 5,340.00 13.00 15,600.00 11.50 13,800.00 8.00 9,600.00
509-02 contractor retained reclaimed asphaltic pavement - 25      CUYD 8.17 - 204.25 0.01 - 0.25 0.10 - 2.50 0.01 - 0.25
510-01-C pavement patching (15" minimum thickness) 200      SQYD 85.00 17,000.00 140.00 28,000.00 157.00 31,400.00 160.00 32,000.00
713-01 temporary signs & barricades lump      LUMP 2,625.00 2,625.00 30,000.00 30,000.00 7,000.00 7,000.00 10,000.00 10,000.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
1.646  MILE 564.00 928.34 400.00 658.40 150.00 246.90 350.00 576.10
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
1.646  MILE 262.50 432.08 0.01 0.02 300.00 493.80 1.00 1.65
713-04-A temporary pavement markings (solid line)(4" width) 3.292  MILE 577.50 1,901.13 0.01 0.03 600.00 1,975.20 1.00 3.29
713-06-A temporary reflectorized raised pavement markers (tabs) 222      EACH 0.37 82.14 2.00 444.00 2.50 555.00 2.00 444.00
727-01 mobilization lump      LUMP 8,700.00 8,700.00 30,000.00 30,000.00 56,500.00 56,500.00 60,000.00 60,000.00
729-16-B object marker assembly (type 2) 4      EACH 145.00 580.00 100.00 400.00 65.00 260.00 70.00 280.00
731-02 reflectorized raised pavement markers 112      EACH 10.50 1,176.00 15.00 1,680.00 12.00 1,344.00 6.00 672.00
732-02-A plastic pavement striping (solid line) (4" width) 1.646  MILE 4,200.00 6,913.20 4,000.00 6,584.00 5,000.00 8,230.00 2,900.00 4,773.40
732-03-A plastic pavement striping (broken line)(4" width) 0.823  MILE 735.00 604.91 700.00 576.10 800.00 658.40 800.00 658.40
735-01 mailboxes 5      EACH 1.05 5.25 1.00 5.00 1.00 5.00 25.00 125.00
735-02 mailbox supports (single) 4      EACH 173.25 693.00 200.00 800.00 200.00 800.00 200.00 800.00
735-03 mailbox supports (double) 1      EACH 204.75 204.75 300.00 300.00 225.00 225.00 240.00 240.00
739-01 hydro-seeding 0.60   ACRE 3,308.00 1,984.80 5,000.00 3,000.00 5,000.00 3,000.00 4,000.00 2,400.00
740-01 construction layout lump      LUMP 2,165.00 2,165.00 4,000.00 4,000.00 6,500.00 6,500.00 12,000.00 12,000.00
S-001 rumble strips (ground-in) 1.7    MILE 2,625.00 4,462.50 7,500.00 12,750.00 3,200.00 5,440.00 5,000.00 8,500.00
S-002 surface preparation lump      LUMP 12,180.00 12,180.00 10,000.00 10,000.00 28,500.00 28,500.00 35,000.00 35,000.00
                       
 CONTRACTOR TOTAL       406,518.59   534,056.70   565,663.80   627,950.94