| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - R. E. HEIDT CONSTRUCTION CO., INC. |
- 2 - PRAIRIE CONTRACTORS INC. |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 4 - GILCHRIST CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-07 |
borrow (vehicular measurement)
|
350   |
CUYD |
10.00 |
3,500.00 |
50.00 |
17,500.00 |
18.00 |
6,300.00 |
25.00 |
8,750.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
174.00 |
696.00 |
200.00 |
800.00 |
350.00 |
1,400.00 |
200.00 |
800.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
10   |
CUYD |
598.00 |
5,980.00 |
100.00 |
1,000.00 |
120.00 |
1,200.00 |
200.00 |
2,000.00 |
| 502-01 |
superpave asphaltic concrete
|
3,029.3 |
TON |
78.50 |
237,800.05 |
88.00 |
266,578.40 |
98.00 |
296,871.40 |
110.00 |
333,223.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
100.0 |
TON |
122.00 |
12,200.00 |
150.00 |
15,000.00 |
150.00 |
15,000.00 |
230.00 |
23,000.00 |
| 507-01 |
asphaltic material (type e)
|
8,537   |
GAL |
2.63 |
22,452.31 |
3.00 |
25,611.00 |
4.50 |
38,416.50 |
4.25 |
36,282.25 |
| 507-02-B |
aggregate (s2)
|
12,554   |
SQYD |
2.37 |
29,752.98 |
2.50 |
31,385.00 |
1.65 |
20,714.10 |
1.90 |
23,852.60 |
| 507-02-C |
aggregate (s3)
|
12,554   |
SQYD |
2.10 |
26,363.40 |
2.50 |
31,385.00 |
1.50 |
18,831.00 |
1.75 |
21,969.50 |
| 509-01 |
cold planing asphaltic pavement
|
1,200   |
SQYD |
4.45 |
5,340.00 |
13.00 |
15,600.00 |
11.50 |
13,800.00 |
8.00 |
9,600.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 25   |
CUYD |
8.17 |
- 204.25 |
0.01 |
- 0.25 |
0.10 |
- 2.50 |
0.01 |
- 0.25 |
| 510-01-C |
pavement patching (15" minimum thickness)
|
200   |
SQYD |
85.00 |
17,000.00 |
140.00 |
28,000.00 |
157.00 |
31,400.00 |
160.00 |
32,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
2,625.00 |
2,625.00 |
30,000.00 |
30,000.00 |
7,000.00 |
7,000.00 |
10,000.00 |
10,000.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
1.646 |
MILE |
564.00 |
928.34 |
400.00 |
658.40 |
150.00 |
246.90 |
350.00 |
576.10 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.646 |
MILE |
262.50 |
432.08 |
0.01 |
0.02 |
300.00 |
493.80 |
1.00 |
1.65 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
3.292 |
MILE |
577.50 |
1,901.13 |
0.01 |
0.03 |
600.00 |
1,975.20 |
1.00 |
3.29 |
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
222   |
EACH |
0.37 |
82.14 |
2.00 |
444.00 |
2.50 |
555.00 |
2.00 |
444.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
8,700.00 |
8,700.00 |
30,000.00 |
30,000.00 |
56,500.00 |
56,500.00 |
60,000.00 |
60,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
145.00 |
580.00 |
100.00 |
400.00 |
65.00 |
260.00 |
70.00 |
280.00 |
| 731-02 |
reflectorized raised pavement markers
|
112   |
EACH |
10.50 |
1,176.00 |
15.00 |
1,680.00 |
12.00 |
1,344.00 |
6.00 |
672.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
1.646 |
MILE |
4,200.00 |
6,913.20 |
4,000.00 |
6,584.00 |
5,000.00 |
8,230.00 |
2,900.00 |
4,773.40 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.823 |
MILE |
735.00 |
604.91 |
700.00 |
576.10 |
800.00 |
658.40 |
800.00 |
658.40 |
| 735-01 |
mailboxes
|
5   |
EACH |
1.05 |
5.25 |
1.00 |
5.00 |
1.00 |
5.00 |
25.00 |
125.00 |
| 735-02 |
mailbox supports (single)
|
4   |
EACH |
173.25 |
693.00 |
200.00 |
800.00 |
200.00 |
800.00 |
200.00 |
800.00 |
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
204.75 |
204.75 |
300.00 |
300.00 |
225.00 |
225.00 |
240.00 |
240.00 |
| 739-01 |
hydro-seeding
|
0.60 |
ACRE |
3,308.00 |
1,984.80 |
5,000.00 |
3,000.00 |
5,000.00 |
3,000.00 |
4,000.00 |
2,400.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
2,165.00 |
2,165.00 |
4,000.00 |
4,000.00 |
6,500.00 |
6,500.00 |
12,000.00 |
12,000.00 |
| S-001 |
rumble strips (ground-in)
|
1.7 |
MILE |
2,625.00 |
4,462.50 |
7,500.00 |
12,750.00 |
3,200.00 |
5,440.00 |
5,000.00 |
8,500.00 |
| S-002 |
surface preparation
|
lump |
LUMP |
12,180.00 |
12,180.00 |
10,000.00 |
10,000.00 |
28,500.00 |
28,500.00 |
35,000.00 |
35,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
406,518.59 |
|
534,056.70 |
|
565,663.80 |
|
627,950.94 |
|