| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - R. E. HEIDT CONSTRUCTION CO., INC. |
- 2 - PRAIRIE CONTRACTORS INC. |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 4 - GILCHRIST CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
2,100.00 |
2,100.00 |
2,000.00 |
2,000.00 |
4,000.00 |
4,000.00 |
8,000.00 |
8,000.00 |
| 202-02-B |
removal of concrete box culverts
|
1   |
EACH |
5,250.00 |
5,250.00 |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
6,000.00 |
6,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
37   |
SQYD |
26.25 |
971.25 |
25.00 |
925.00 |
36.00 |
1,332.00 |
30.00 |
1,110.00 |
| 203-07 |
borrow (vehicular measurement)
|
1,037   |
CUYD |
21.00 |
21,777.00 |
30.00 |
31,110.00 |
22.00 |
22,814.00 |
28.00 |
29,036.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
100   |
CUYD |
104.00 |
10,400.00 |
125.00 |
12,500.00 |
90.00 |
9,000.00 |
95.00 |
9,500.00 |
| 502-01 |
superpave asphaltic concrete
|
27,350.7 |
TON |
76.00 |
2,078,653.20 |
84.00 |
2,297,458.80 |
81.75 |
2,235,919.73 |
85.00 |
2,324,809.50 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,177.7 |
TON |
75.75 |
164,960.78 |
100.00 |
217,770.00 |
150.00 |
326,655.00 |
90.00 |
195,993.00 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
537   |
SQYD |
65.00 |
34,905.00 |
90.00 |
48,330.00 |
110.00 |
59,070.00 |
110.00 |
59,070.00 |
| 510-03 |
pavement joint repair
|
10.0 |
TON |
396.00 |
3,960.00 |
300.00 |
3,000.00 |
250.00 |
2,500.00 |
680.00 |
6,800.00 |
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
60   |
LNFT |
194.25 |
11,655.00 |
200.00 |
12,000.00 |
200.00 |
12,000.00 |
210.00 |
12,600.00 |
| 701-05-G |
side drain pipe (18")
|
60   |
LNFT |
84.00 |
5,040.00 |
80.00 |
4,800.00 |
90.00 |
5,400.00 |
70.00 |
4,200.00 |
| 701-05-I |
side drain pipe (24")
|
32   |
LNFT |
89.25 |
2,856.00 |
85.00 |
2,720.00 |
95.00 |
3,040.00 |
90.00 |
2,880.00 |
| 701-05-K |
side drain pipe (30")
|
86   |
LNFT |
126.00 |
10,836.00 |
120.00 |
10,320.00 |
130.00 |
11,180.00 |
125.00 |
10,750.00 |
| 701-05-M |
side drain pipe (36")
|
24   |
LNFT |
141.75 |
3,402.00 |
140.00 |
3,360.00 |
145.00 |
3,480.00 |
140.00 |
3,360.00 |
| 701-06-G |
side drain pipe arch (42" equiv.)
|
32   |
LNFT |
220.50 |
7,056.00 |
225.00 |
7,200.00 |
230.00 |
7,360.00 |
240.00 |
7,680.00 |
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
10   |
LNFT |
110.25 |
1,102.50 |
115.00 |
1,150.00 |
115.00 |
1,150.00 |
120.00 |
1,200.00 |
| 701-14 |
cleaning existing pipes
|
173   |
LNFT |
26.25 |
4,541.25 |
50.00 |
8,650.00 |
28.00 |
4,844.00 |
25.00 |
4,325.00 |
| 701-15 |
concrete collar
|
2   |
EACH |
840.00 |
1,680.00 |
800.00 |
1,600.00 |
900.00 |
1,800.00 |
900.00 |
1,800.00 |
| 702-02-B |
manholes (r-cb-11)
|
1   |
EACH |
3,360.00 |
3,360.00 |
3,500.00 |
3,500.00 |
3,500.00 |
3,500.00 |
3,800.00 |
3,800.00 |
| 702-03-A |
catch basins (cb-01)
|
3   |
EACH |
2,625.00 |
7,875.00 |
2,500.00 |
7,500.00 |
2,700.00 |
8,100.00 |
2,800.00 |
8,400.00 |
| 702-03-B |
catch basins (cb-02)
|
1   |
EACH |
4,200.00 |
4,200.00 |
4,000.00 |
4,000.00 |
4,500.00 |
4,500.00 |
4,300.00 |
4,300.00 |
| 702-08-A |
side drain safety end (type 1)
|
2   |
EACH |
2,625.00 |
5,250.00 |
3,000.00 |
6,000.00 |
2,700.00 |
5,400.00 |
2,800.00 |
5,600.00 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
300.0 |
LNFT |
57.75 |
17,325.00 |
85.00 |
25,500.00 |
85.00 |
25,500.00 |
88.00 |
26,400.00 |
| 704-03 |
blocked out guard rail
|
512.5 |
LNFT |
23.10 |
11,838.75 |
20.00 |
10,250.00 |
18.00 |
9,225.00 |
19.00 |
9,737.50 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,468.00 |
9,872.00 |
2,000.00 |
8,000.00 |
2,000.00 |
8,000.00 |
2,200.00 |
8,800.00 |
| 707-01 |
concrete curb
|
500.0 |
LNFT |
36.75 |
18,375.00 |
40.00 |
20,000.00 |
38.00 |
19,000.00 |
45.00 |
22,500.00 |
| 710-01 |
flowable fill
|
153   |
CUYD |
99.75 |
15,261.75 |
100.00 |
15,300.00 |
100.00 |
15,300.00 |
105.00 |
16,065.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
7,560.00 |
7,560.00 |
100,000.00 |
100,000.00 |
15,000.00 |
15,000.00 |
25,000.00 |
25,000.00 |
| 713-02-C |
temporary pavement markings (8" width)
|
380   |
LNFT |
0.21 |
79.80 |
1.00 |
380.00 |
0.22 |
83.60 |
0.50 |
190.00 |
| 713-02-E |
temporary pavement markings (24" width)
|
572   |
LNFT |
0.63 |
360.36 |
1.00 |
572.00 |
0.65 |
371.80 |
1.00 |
572.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
17.096 |
MILE |
163.00 |
2,786.65 |
400.00 |
6,838.40 |
135.00 |
2,307.96 |
450.00 |
7,693.20 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
23.712 |
MILE |
262.50 |
6,224.40 |
0.01 |
0.24 |
260.00 |
6,165.12 |
1.00 |
23.71 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
34.754 |
MILE |
577.50 |
20,070.44 |
0.01 |
0.35 |
575.00 |
19,983.55 |
1.00 |
34.75 |
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
8   |
EACH |
73.50 |
588.00 |
100.00 |
800.00 |
80.00 |
640.00 |
100.00 |
800.00 |
| 717-01 |
seeding
|
7   |
LB |
21.00 |
147.00 |
20.00 |
140.00 |
27.00 |
189.00 |
25.00 |
175.00 |
| 718-01 |
fertilizer
|
110   |
LB |
3.15 |
346.50 |
5.00 |
550.00 |
2.25 |
247.50 |
4.00 |
440.00 |
| 726-01 |
bedding material
|
25.6 |
CUYD |
94.50 |
2,419.20 |
100.00 |
2,560.00 |
100.00 |
2,560.00 |
100.00 |
2,560.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
31,900.00 |
31,900.00 |
100,000.00 |
100,000.00 |
138,000.00 |
138,000.00 |
150,000.00 |
150,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
63.00 |
126.00 |
70.00 |
140.00 |
65.00 |
130.00 |
70.00 |
140.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
73.50 |
588.00 |
80.00 |
640.00 |
75.00 |
600.00 |
80.00 |
640.00 |
| 731-02 |
reflectorized raised pavement markers
|
1,130   |
EACH |
4.75 |
5,367.50 |
5.00 |
5,650.00 |
5.00 |
5,650.00 |
5.50 |
6,215.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
190   |
LNFT |
1.05 |
199.50 |
1.00 |
190.00 |
1.10 |
209.00 |
1.10 |
209.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
286   |
LNFT |
3.15 |
900.90 |
3.00 |
858.00 |
3.25 |
929.50 |
3.50 |
1,001.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
17.377 |
MILE |
2,415.00 |
41,965.46 |
2,300.00 |
39,967.10 |
2,500.00 |
43,442.50 |
3,200.00 |
55,606.40 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
11.856 |
MILE |
735.00 |
8,714.16 |
700.00 |
8,299.20 |
750.00 |
8,892.00 |
850.00 |
10,077.60 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
4   |
EACH |
147.00 |
588.00 |
150.00 |
600.00 |
150.00 |
600.00 |
175.00 |
700.00 |
| 735-01 |
mailboxes
|
40   |
EACH |
1.05 |
42.00 |
30.00 |
1,200.00 |
21.00 |
840.00 |
25.00 |
1,000.00 |
| 735-02 |
mailbox supports (single)
|
40   |
EACH |
122.85 |
4,914.00 |
200.00 |
8,000.00 |
200.00 |
8,000.00 |
200.00 |
8,000.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
4,333.00 |
4,333.00 |
7,500.00 |
7,500.00 |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
| S-001 |
surface preparation
|
lump |
LUMP |
12,420.00 |
12,420.00 |
60,000.00 |
60,000.00 |
170,000.00 |
170,000.00 |
190,000.00 |
190,000.00 |
| S-002 |
rumble strips (ground-in)
|
17.0 |
MILE |
474.70 |
8,069.90 |
800.00 |
13,600.00 |
800.00 |
13,600.00 |
550.00 |
9,350.00 |
| S-003 |
cleaning curb gutters
|
8,126   |
LNFT |
1.00 |
8,126.00 |
3.25 |
26,409.50 |
2.85 |
23,159.10 |
3.00 |
24,378.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,633,340.25 |
|
3,154,838.59 |
|
3,292,670.36 |
|
3,309,521.66 |
|