Lead Project: 008-04-0060
Parish: ST LANDRY
Routes: US 190
Description: US 190 OVER US 71 BRIDGE REHABILITATION
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete overlay,
bridge rehabilitation, and related work.
Estimated Construction Cost: $3,689,684.20
 
RankLicenseBidderConstruction Bid
1 00481 COASTAL BRIDGE CO., L.L.C. $4,257,964.40
2 02179 BOH BROS. CONSTRUCTION CO., LLC. $4,399,496.52
3 12312 GILCHRIST CONSTRUCTION CO. LLC $6,651,114.85
 
Item Number Item Description Quantity Unit of Measure - 1 -
COASTAL BRIDGE CO., L.L.C.
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 70,000.00 70,000.00 10,000.00 10,000.00 80,000.00 80,000.00    
202-02-01 removal of concrete deck and bridge rail 1,883      SQYD 140.00 263,620.00 130.00 244,790.00 150.00 282,450.00    
202-02-02 removal of concrete approach slabs 4      EACH 10,000.00 40,000.00 2,000.00 8,000.00 4,500.00 18,000.00    
202-02-03 partial removal of bents no. 1 & 6 lump      LUMP 30,000.00 30,000.00 20,000.00 20,000.00 12,000.00 12,000.00    
202-02-04 removal of asphaltic concrete curbs 806.0    LNFT 7.00 5,642.00 4.00 3,224.00 8.00 6,448.00    
203-01 general excavation 250      CUYD 12.00 3,000.00 14.00 3,500.00 17.00 4,250.00    
203-03 embankment 6,760      CUYD 22.00 148,720.00 21.00 141,960.00 22.00 148,720.00    
204-05-A temporary sediment check dams (hay) 6      EACH 400.00 2,400.00 160.00 960.00 170.00 1,020.00    
204-06 temporary silt fencing 1,494      LNFT 4.00 5,976.00 2.20 3,286.80 4.00 5,976.00    
502-01 superpave asphaltic concrete 5,882.0    TON 86.00 505,852.00 95.50 561,731.00 100.00 588,200.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
381.2    TON 125.00 47,650.00 139.00 52,986.80 120.00 45,744.00    
509-01 cold planing asphaltic pavement 8,374      SQYD 4.00 33,496.00 4.60 38,520.40 5.20 43,544.80    
509-02 contractor retained reclaimed asphaltic pavement - 465      CUYD 1.00 - 465.00 1.00 - 465.00 0.01 - 4.65    
704-11-C guard rail end treatment (bi-directional) 2      EACH 6,500.00 13,000.00 6,000.00 12,000.00 6,500.00 13,000.00    
707-04 asphaltic curb 1,680.0    LNFT 10.00 16,800.00 12.00 20,160.00 20.00 33,600.00    
712-01-A concrete cast-in-place revetment (4" thick) 36      SQYD 85.00 3,060.00 180.00 6,480.00 100.00 3,600.00    
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00 100,000.00 100,000.00 150,000.00 150,000.00    
713-04-A-01 temporary pavement markings (solid line) (4" width)
(type i removable)
5.108  MILE 17,500.00 89,390.00 17,200.00 87,857.60 15,800.00 80,706.40    
713-06 temporary reflectorized raised pavement markers 564      EACH 0.50 282.00 8.90 5,019.60 5.50 3,102.00    
713-08 temporary precast concrete barrier (department
furnished)
240      EACH 400.00 96,000.00 434.00 104,160.00 150.00 36,000.00    
722-01 project site laboratory 1      EACH 10,000.00 10,000.00 20,000.00 20,000.00 50,000.00 50,000.00    
725-01 temporary detour roads 979.5    SQYD 130.00 127,335.00 120.00 117,540.00 90.00 88,155.00    
726-01 bedding material 22.8    CUYD 60.00 1,368.00 112.00 2,553.60 120.00 2,736.00    
727-01 mobilization lump      LUMP 370,000.00 370,000.00 472,000.00 472,000.00 2,200,000.00 2,200,000.00    
729-16-B object marker assembly (type 2) 8      EACH 100.00 800.00 95.00 760.00 80.00 640.00    
731-01 nonreflectorized raised pavement markers 252      EACH 15.00 3,780.00 14.40 3,628.80 14.00 3,528.00    
731-02 reflectorized raised pavement markers 358      EACH 6.50 2,327.00 5.70 2,040.60 6.00 2,148.00    
732-01-C plastic pavement striping (8" width) 620      LNFT 1.20 744.00 1.00 620.00 1.00 620.00    
732-01-D plastic pavement striping (12" width) 210      LNFT 2.00 420.00 1.60 336.00 1.50 315.00    
732-01-E plastic pavement striping (24" width) 60      LNFT 5.00 300.00 3.70 222.00 3.50 210.00    
732-02-A plastic pavement striping (solid line) (4" width) 3.333  MILE 3,500.00 11,665.50 2,800.00 9,332.40 2,800.00 9,332.40    
732-03-A plastic pavement striping (broken line) (4" width) 1.622  MILE 1,500.00 2,433.00 720.00 1,167.84 750.00 1,216.50    
732-05 removal of existing markings 0.568  MILE 7,500.00 4,260.00 6,500.00 3,692.00 6,000.00 3,408.00    
739-01 hydro-seeding 1.55   ACRE 2,000.00 3,100.00 3,000.00 4,650.00 1,200.00 1,860.00    
740-01 construction layout lump      LUMP 100,000.00 100,000.00 60,000.00 60,000.00 110,000.00 110,000.00    
804-01-B precast concrete piles (14") 240      LNFT 57.00 13,680.00 50.00 12,000.00 80.00 19,200.00    
804-01-F precast concrete piles (24") 960      LNFT 115.00 110,400.00 199.00 191,040.00 125.00 120,000.00    
805-01-C class a concrete (retaining walls) 8.61   CUYD 1,400.00 12,054.00 1,100.00 9,471.00 900.00 7,749.00    
805-01-F class a concrete (bents) 89.58   CUYD 1,500.00 134,370.00 1,200.00 107,496.00 1,400.00 125,412.00    
805-03 class aa concrete 523.00   CUYD 740.00 387,020.00 800.00 418,400.00 1,000.00 523,000.00    
805-11 strip seal joints 644.88   LNFT 120.00 77,385.60 120.00 77,385.60 150.00 96,732.00    
806-01 deformed reinforcing steel 136,644      LB 0.95 129,811.80 0.95 129,811.80 1.00 136,644.00    
807-08 structural metalwork lump      LUMP 350,000.00 350,000.00 255,000.00 255,000.00 550,000.00 550,000.00    
810-01 concrete railing (f-shape pl-2) 1,084.00   LNFT 80.00 86,720.00 61.00 66,124.00 60.00 65,040.00    
813-01 concrete approach slabs 684.46   SQYD 225.00 154,003.50 226.00 154,687.96 300.00 205,338.00    
S-001 dynamic message sign unit 2      EACH 30,000.00 60,000.00 12,300.00 24,600.00 18,000.00 36,000.00    
S-002 concrete drainage channel 185      LNFT 100.00 18,500.00 87.00 16,095.00 60.00 11,100.00    
S-003 impact attenuators (construction zone) 6      EACH 25,000.00 150,000.00 20,000.00 120,000.00 22,000.00 132,000.00    
S-004 temporary traffic signal lump      LUMP 100,000.00 100,000.00 85,000.00 85,000.00 75,000.00 75,000.00    
S-101 relocating guard rail 1,320.8    LNFT 30.00 39,624.00 28.40 37,510.72 18.00 23,774.40    
S-102 new drilled and epoxied joint anchor bolts at end
bents
16      EACH 225.00 3,600.00 100.00 1,600.00 500.00 8,000.00    
S-103 handling of existing girders & diaphragms lump      LUMP 115,000.00 115,000.00 310,000.00 310,000.00 250,000.00 250,000.00    
S-104 top flange treatment for girder ends 100      EACH 280.00 28,000.00 500.00 50,000.00 920.00 92,000.00    
S-105 bottom flange treatment for girder ends 100      EACH 900.00 90,000.00 1,400.00 140,000.00 800.00 80,000.00    
S-106 new drilled & epoxied girder anchor bolts 8      EACH 225.00 1,800.00 150.00 1,200.00 750.00 6,000.00    
S-107 extension of existing girder anchor bolts 192      EACH 120.00 23,040.00 80.00 15,360.00 200.00 38,400.00    
S-108 concrete risers 60      EACH 1,000.00 60,000.00 900.00 54,000.00 320.00 19,200.00    
                       
 CONTRACTOR TOTAL       4,257,964.40   4,399,496.52   6,651,114.85    