| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - FORBY CONTRACTING, INC. |
- 2 - CERES ENVIRONMENTAL SERVICES,INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
2,500.00 |
2,500.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
95   |
SQYD |
15.00 |
1,425.00 |
21.00 |
1,995.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
70.0 |
SQYD |
15.00 |
1,050.00 |
21.00 |
1,470.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
165   |
CUYD |
65.00 |
10,725.00 |
28.00 |
4,620.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
30   |
CUYD |
100.00 |
3,000.00 |
85.00 |
2,550.00 |
|
|
|
|
| 701-06-B |
side drain pipe arch (18" equiv.)(bccspa)
|
152   |
LNFT |
150.00 |
22,800.00 |
95.00 |
14,440.00 |
|
|
|
|
| 706-01-C |
concrete walk (6" thick)(including stamp brick)
|
820.0 |
SQYD |
95.00 |
77,900.00 |
75.00 |
61,500.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
7,000.00 |
7,000.00 |
|
|
|
|
| 723-02 |
granular material (vehicular measurement)
|
100   |
CUYD |
80.00 |
8,000.00 |
85.00 |
8,500.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
25,000.00 |
25,000.00 |
55,000.00 |
55,000.00 |
|
|
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
612   |
LNFT |
0.50 |
306.00 |
2.40 |
1,468.80 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
205   |
LNFT |
1.55 |
317.75 |
6.00 |
1,230.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
96   |
LNFT |
3.25 |
312.00 |
12.00 |
1,152.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
2,500.00 |
2,500.00 |
9,000.00 |
9,000.00 |
|
|
|
|
| S-001 |
excavation and linear grading
|
lump |
LUMP |
12,000.00 |
12,000.00 |
28,000.00 |
28,000.00 |
|
|
|
|
| S-002 |
replace catch basin top (type 1)
|
2   |
EACH |
3,500.00 |
7,000.00 |
1,700.00 |
3,400.00 |
|
|
|
|
| S-003 |
replace catch basin top (type 2)
|
4   |
EACH |
3,000.00 |
12,000.00 |
2,450.00 |
9,800.00 |
|
|
|
|
| S-004 |
special detail no. 1 catch basin
|
3   |
EACH |
4,000.00 |
12,000.00 |
6,000.00 |
18,000.00 |
|
|
|
|
| S-005 |
saw cut
|
748   |
LNFT |
8.00 |
5,984.00 |
10.00 |
7,480.00 |
|
|
|
|
| S-006 |
clean and varnish exist. catch basin frame and grate
|
10   |
EACH |
250.00 |
2,500.00 |
250.00 |
2,500.00 |
|
|
|
|
| S-007 |
8" drain pipe tie-in to side of catch basin
|
3   |
EACH |
750.00 |
2,250.00 |
1,150.00 |
3,450.00 |
|
|
|
|
| S-008 |
ramp texture pattern (truncated domes)
|
7   |
EACH |
400.00 |
2,800.00 |
2,700.00 |
18,900.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
222,369.75 |
|
276,455.80 |
|
|
|
|
|