| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - C W & W CONTRACTORS, INC. |
- 3 - GUINN BROTHERS, LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
20,000.00 |
20,000.00 |
5,000.00 |
5,000.00 |
20,000.00 |
20,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
7,000.00 |
7,000.00 |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
|
|
| 202-02-A-01 |
removal of bridge(sta. 15+00; 21.5'w x 94.5' l timber
bridge) |
1   |
EACH |
50,000.00 |
50,000.00 |
5,000.00 |
5,000.00 |
20,000.00 |
20,000.00 |
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
40,000.00 |
40,000.00 |
35,000.00 |
35,000.00 |
25,000.00 |
25,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
5   |
EACH |
1.00 |
5.00 |
5.00 |
25.00 |
1.00 |
5.00 |
|
|
| 204-03 |
temporary slope drains
|
160   |
LNFT |
1.00 |
160.00 |
10.00 |
1,600.00 |
1.00 |
160.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
1.00 |
4.00 |
75.00 |
300.00 |
1.00 |
4.00 |
|
|
| 204-06 |
temporary silt fencing
|
1,335   |
LNFT |
1.00 |
1,335.00 |
1.00 |
1,335.00 |
0.00 |
0.00 |
|
|
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
191.8 |
CUYD |
65.00 |
12,467.00 |
100.00 |
19,180.00 |
110.00 |
21,098.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
75.0 |
LNFT |
60.00 |
4,500.00 |
73.00 |
5,475.00 |
75.00 |
5,625.00 |
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
75.0 |
LNFT |
35.00 |
2,625.00 |
39.00 |
2,925.00 |
35.00 |
2,625.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
2,600.00 |
2,600.00 |
3,300.00 |
3,300.00 |
3,200.00 |
3,200.00 |
|
|
| 705-01 |
barbed wire fence
|
150   |
LNFT |
7.50 |
1,125.00 |
15.00 |
2,250.00 |
15.00 |
2,250.00 |
|
|
| 711-01-D |
riprap (55 lb,18" thick)
|
340   |
SQYD |
71.00 |
24,140.00 |
95.00 |
32,300.00 |
85.00 |
28,900.00 |
|
|
| 711-04 |
geotextile fabric
|
340   |
SQYD |
4.00 |
1,360.00 |
3.00 |
1,020.00 |
5.00 |
1,700.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
11,000.00 |
11,000.00 |
7,500.00 |
7,500.00 |
12,000.00 |
12,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
0.3 |
TON |
2,250.00 |
675.00 |
5,000.00 |
1,500.00 |
8,500.00 |
2,550.00 |
|
|
| 717-01 |
seeding
|
6   |
LB |
30.00 |
180.00 |
100.00 |
600.00 |
100.00 |
600.00 |
|
|
| 718-01 |
fertilizer
|
130   |
LB |
2.00 |
260.00 |
5.00 |
650.00 |
4.00 |
520.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
25,000.00 |
25,000.00 |
50,000.00 |
50,000.00 |
52,500.00 |
52,500.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
7   |
EACH |
80.00 |
560.00 |
100.00 |
700.00 |
95.00 |
665.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
8,000.00 |
8,000.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
|
|
| 804-01-B |
precast concrete piles (14")
|
1,368   |
LNFT |
22.00 |
30,096.00 |
104.00 |
142,272.00 |
62.00 |
84,816.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
500.00 |
500.00 |
1.00 |
1.00 |
|
|
| 805-10-A |
bridge superstructure & substructure(24' clear roadway;
90 degree crossing) |
7   |
SPAN |
25,000.00 |
175,000.00 |
22,500.00 |
157,500.00 |
28,000.00 |
196,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
418,093.00 |
|
485,932.00 |
|
496,219.00 |
|
|
|