| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COASTAL BRIDGE CO., L.L.C. |
- 2 - F. MILLER CONSTRUCTION LLC |
- 3 - CERES ENVIRONMENTAL SERVICES,INC. |
- 4 - BOH BROS. CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
LUMP |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
24,000.00 |
24,000.00 |
20,000.00 |
20,000.00 |
| 202-02-A-01 |
removal of bridge (sta. 100+00, 23.8' wide x 159.0'
long bridge with conc. spans, removable center span, timber piles) |
1   |
EACH |
140,000.00 |
140,000.00 |
45,500.00 |
45,500.00 |
42,000.00 |
42,000.00 |
55,000.00 |
55,000.00 |
| 202-02-G |
removal of surfacing and stabilized base
|
350.1 |
SQYD |
10.00 |
3,501.00 |
11.50 |
4,026.15 |
14.00 |
4,901.40 |
8.00 |
2,800.80 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
10,000.00 |
10,000.00 |
7,700.00 |
7,700.00 |
16,800.00 |
16,800.00 |
12,000.00 |
12,000.00 |
| 204-02 |
temporary hay or straw bales
|
10   |
EACH |
20.00 |
200.00 |
20.00 |
200.00 |
25.00 |
250.00 |
25.00 |
250.00 |
| 204-03 |
temporary slope drains
|
100   |
LNFT |
20.00 |
2,000.00 |
40.00 |
4,000.00 |
60.00 |
6,000.00 |
15.00 |
1,500.00 |
| 204-05-A |
temporary sediment check dam (hay)
|
4   |
EACH |
250.00 |
1,000.00 |
174.50 |
698.00 |
165.00 |
660.00 |
120.00 |
480.00 |
| 204-06 |
temporary silt fencing
|
380   |
LNFT |
3.00 |
1,140.00 |
3.40 |
1,292.00 |
4.50 |
1,710.00 |
2.80 |
1,064.00 |
| 302-01-A |
class ii base course (stone or rpcc)
|
90.9 |
CUYD |
100.00 |
9,090.00 |
134.00 |
12,180.60 |
100.00 |
9,090.00 |
132.00 |
11,998.80 |
| 502-01 |
superpave asphaltic concrete
|
71.7 |
TON |
190.00 |
13,623.00 |
688.00 |
49,329.60 |
280.00 |
20,076.00 |
225.00 |
16,132.50 |
| 707-03 |
conbination concrete curb and gutter
|
43.5 |
LNFT |
50.00 |
2,175.00 |
118.00 |
5,133.00 |
75.00 |
3,262.50 |
30.00 |
1,305.00 |
| 711-01-C |
riprap (30 lb., 14" thick)
|
160   |
SQYD |
62.00 |
9,920.00 |
122.00 |
19,520.00 |
55.00 |
8,800.00 |
80.00 |
12,800.00 |
| 711-04 |
geotextile fabric
|
160   |
SQYD |
3.00 |
480.00 |
5.20 |
832.00 |
3.00 |
480.00 |
3.50 |
560.00 |
| 713-01 |
temporary signs and barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
8,770.00 |
8,770.00 |
8,500.00 |
8,500.00 |
14,000.00 |
14,000.00 |
| 716-01-A |
mulch (vegetative)
|
0.1 |
TON |
1,500.00 |
150.00 |
8,060.00 |
806.00 |
7,200.00 |
720.00 |
7,000.00 |
700.00 |
| 717-01 |
seeding
|
3   |
LB |
50.00 |
150.00 |
134.25 |
402.75 |
120.00 |
360.00 |
110.00 |
330.00 |
| 718-01 |
fertilizer
|
59   |
LB |
1.00 |
59.00 |
2.70 |
159.30 |
2.50 |
147.50 |
2.30 |
135.70 |
| 727-01 |
mobilization
|
lump |
LUMP |
80,000.00 |
80,000.00 |
65,000.00 |
65,000.00 |
160,000.00 |
160,000.00 |
500,000.00 |
500,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
100.00 |
400.00 |
107.00 |
428.00 |
90.00 |
360.00 |
100.00 |
400.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
6,900.00 |
6,900.00 |
105,000.00 |
105,000.00 |
30,000.00 |
30,000.00 |
| 804-01-B |
precast concrete piles (14")
|
180   |
LNFT |
60.00 |
10,800.00 |
100.00 |
18,000.00 |
65.00 |
11,700.00 |
95.00 |
17,100.00 |
| 804-01-C |
precast concrete piles (16")
|
990   |
LNFT |
62.50 |
61,875.00 |
83.00 |
82,170.00 |
80.00 |
79,200.00 |
121.00 |
119,790.00 |
| 804-01-F |
precast concrete piles (24")
|
732   |
LNFT |
120.00 |
87,840.00 |
212.00 |
155,184.00 |
155.00 |
113,460.00 |
218.00 |
159,576.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
100.00 |
100.00 |
100.00 |
100.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
| 805-01-F |
class a concrete (bents)
|
72.33 |
CUYD |
1,400.00 |
101,262.00 |
1,334.00 |
96,488.22 |
1,900.00 |
137,427.00 |
840.00 |
60,757.20 |
| 805-03 |
class aa concrete
|
134.73 |
CUYD |
1,300.00 |
175,149.00 |
1,200.00 |
161,676.00 |
1,900.00 |
255,987.00 |
840.00 |
113,173.20 |
| 805-08-B |
precast-prestressed concrete girder (type ii)
|
594.0 |
LNFT |
110.00 |
65,340.00 |
128.50 |
76,329.00 |
150.00 |
89,100.00 |
152.00 |
90,288.00 |
| 806-01 |
deformed reinforcing steel
|
45,791   |
LB |
0.95 |
43,501.45 |
1.50 |
68,686.50 |
2.15 |
98,450.65 |
0.92 |
42,127.72 |
| 807-08 |
structural metalwork
|
lump |
LUMP |
10,000.00 |
10,000.00 |
9,365.00 |
9,365.00 |
9,000.00 |
9,000.00 |
10,000.00 |
10,000.00 |
| 810-01-A |
concrete railing (barrier)
|
150.03 |
LNFT |
100.00 |
15,003.00 |
154.00 |
23,104.62 |
165.00 |
24,754.95 |
61.00 |
9,151.83 |
| 810-04 |
steel and concrete railing
|
149.97 |
LNFT |
200.00 |
29,994.00 |
261.00 |
39,142.17 |
355.00 |
53,239.35 |
145.00 |
21,745.65 |
| 813-01-A |
concrete approach slab (with sidewalk parapet)
|
31.89 |
SQYD |
300.00 |
9,567.00 |
364.00 |
11,607.96 |
335.00 |
10,683.15 |
195.00 |
6,218.55 |
| 813-01-B |
concrete approach slab(with sidewalk and flared
turnout) |
38.07 |
SQYD |
275.00 |
10,469.25 |
335.00 |
12,753.45 |
365.00 |
13,895.55 |
195.00 |
7,423.65 |
| S-101 |
retroreflective sheeting panels
|
lump |
lump |
500.00 |
500.00 |
93.00 |
93.00 |
3,300.00 |
3,300.00 |
500.00 |
500.00 |
| S-102 |
vibration monitoring
|
lump |
lump |
5,000.00 |
5,000.00 |
2,700.00 |
2,700.00 |
5,500.00 |
5,500.00 |
58,000.00 |
58,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
925,288.70 |
|
996,277.32 |
|
1,328,815.05 |
|
1,402,308.60 |
|