Bid Tabs Error processing SSI file
Bid Tabulations Error processing SSI file
February 06, 2014 Error processing SSI file

Letting of 8/29/2007 LA DOTD Headquarters


REBID
go back
Go Back
DBE GOAL FED
Lead Project: 123-04-0022
Parish: WINN
Routes:
Description: WINNFIELD SIDEWALK IMPROVEMENTS - PHASE II
Type Const: conrete sidewalks and related work
Estimated Construction Cost: $197,654.70
 
RankLicenseBidderConstruction Bid
1 21982 FORBY CONTRACTING, INC. $223,243.50
2 18546 C W & W CONTRACTORS, INC. $261,682.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
FORBY CONTRACTING, INC.
- 2 -
C W & W CONTRACTORS, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 5,000.00 5,000.00 2,500.00 2,500.00        
202-01 removal of structures & obstructions lump      LUMP 2,500.00 2,500.00 4,500.00 4,500.00        
202-02-D removal of concrete walks & drives 2,192      SQYD 11.50 25,208.00 10.00 21,920.00        
202-02-E removal of concrete curbs 39.0    LNFT 15.00 585.00 10.00 390.00        
202-02-I removal of concrete retaining wall 212.0    LNFT 10.00 2,120.00 20.00 4,240.00        
202-02-J removal of concrete steps (plan view surface area) 21.3    SQYD 25.00 532.50 50.00 1,065.00        
202-03 relocation of stop sign (rt. of sta. 204+96.5) 1      EACH 500.00 500.00 500.00 500.00        
203-05 excavation & embankment lump      LUMP 5,000.00 5,000.00 7,500.00 7,500.00        
701-07-A yard drain pipe (4" pvc) 11      LNFT 10.00 110.00 50.00 550.00        
706-01-A concrete walk (4" thick) 2,026.0    SQYD 55.00 111,430.00 55.00 111,430.00        
706-02-C concrete drive (6" thick) 77.8    SQYD 70.00 5,446.00 65.00 5,057.00        
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00 10,000.00 10,000.00        
727-01 mobilization lump      LUMP 25,000.00 25,000.00 40,000.00 40,000.00        
732-01-E plastic pavement striping (24" width) 296      LNFT 17.00 5,032.00 25.00 7,400.00        
740-01 construction layout lump      LUMP 2,500.00 2,500.00 5,000.00 5,000.00        
S-001 concrete retaining wall 106      LNFT 100.00 10,600.00 200.00 21,200.00        
S-002 concrete steps (plan view surface area) 5.1    SQYD 500.00 2,550.00 500.00 2,550.00        
S-003 painted steel handrails 242.6    LNFT 50.00 12,130.00 50.00 12,130.00        
S-004 sawcutting existing asphalt or concrete (full depth) 250      LNFT 8.00 2,000.00 15.00 3,750.00        
                       
 CONTRACTOR TOTAL       223,243.50   261,682.00        