| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BENTON & BROWN, LLC. |
- 2 - MADDEN CONTRACTING CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
42   |
SQYD |
75.00 |
3,150.00 |
40.00 |
1,680.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
200   |
LNFT |
4.00 |
800.00 |
5.50 |
1,100.00 |
|
|
|
|
| 202-02-I |
removal of culvert pipe
|
70   |
LNFT |
6.00 |
420.00 |
50.00 |
3,500.00 |
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
24,000.00 |
24,000.00 |
16,000.00 |
16,000.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
6,000   |
CUYD |
15.00 |
90,000.00 |
14.00 |
84,000.00 |
|
|
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
55,286   |
SQYD |
6.40 |
353,830.40 |
8.85 |
489,281.10 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
620   |
CUYD |
33.00 |
20,460.00 |
45.00 |
27,900.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
15,291.7 |
TON |
70.00 |
1,070,419.00 |
78.25 |
1,196,575.53 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
3,000.0 |
TON |
80.00 |
240,000.00 |
120.45 |
361,350.00 |
|
|
|
|
| 507-01-A |
asphaltic material (crs-2p cold applied emulsion)
|
16,498   |
GAL |
2.00 |
32,996.00 |
2.20 |
36,295.60 |
|
|
|
|
| 507-02-C |
aggregate (s3)
|
53,218   |
SQYD |
2.30 |
122,401.40 |
2.60 |
138,366.80 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
47,027   |
SQYD |
1.20 |
56,432.40 |
1.90 |
89,351.30 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 980   |
CUYD |
0.90 |
- 882.00 |
1.00 |
- 980.00 |
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
1,000   |
SQYD |
41.00 |
41,000.00 |
58.00 |
58,000.00 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
64   |
LNFT |
170.00 |
10,880.00 |
140.00 |
8,960.00 |
|
|
|
|
| 701-08 |
relaying pipe
|
132   |
LNFT |
225.00 |
29,700.00 |
130.00 |
17,160.00 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
22   |
LNFT |
175.00 |
3,850.00 |
150.00 |
3,300.00 |
|
|
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
4   |
LNFT |
185.00 |
740.00 |
180.00 |
720.00 |
|
|
|
|
| 701-15 |
concrete collar
|
23   |
EACH |
990.00 |
22,770.00 |
700.00 |
16,100.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
150.0 |
LNFT |
71.50 |
10,725.00 |
58.00 |
8,700.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
75.0 |
LNFT |
26.40 |
1,980.00 |
20.00 |
1,500.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
EACH |
2,640.00 |
10,560.00 |
2,400.00 |
9,600.00 |
|
|
|
|
| 712-04 |
flexible revetment
|
450   |
SQYD |
73.00 |
32,850.00 |
90.00 |
40,500.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
65,000.00 |
65,000.00 |
118,500.00 |
118,500.00 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
100   |
LNFT |
1.00 |
100.00 |
0.01 |
1.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
14.800 |
MILE |
345.00 |
5,106.00 |
400.00 |
5,920.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.275 |
MILE |
325.00 |
2,039.38 |
1.00 |
6.28 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
48.041 |
MILE |
545.00 |
26,182.35 |
1.00 |
48.04 |
|
|
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
930   |
EACH |
2.00 |
1,860.00 |
1.35 |
1,255.50 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
40.0 |
TON |
800.00 |
32,000.00 |
550.00 |
22,000.00 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
5,750.00 |
5,750.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
75,000.00 |
75,000.00 |
118,500.00 |
118,500.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
71.50 |
286.00 |
60.00 |
240.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
6   |
EACH |
110.00 |
660.00 |
70.00 |
420.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,012   |
EACH |
5.60 |
5,667.20 |
5.10 |
5,161.20 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
60   |
LNFT |
3.20 |
192.00 |
2.90 |
174.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
23.885 |
MILE |
2,650.00 |
63,295.25 |
2,410.00 |
57,562.85 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.266 |
MILE |
760.00 |
2,482.16 |
690.00 |
2,253.54 |
|
|
|
|
| 735-01 |
mailboxes
|
75   |
EACH |
1.10 |
82.50 |
1.00 |
75.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
43   |
EACH |
135.00 |
5,805.00 |
125.00 |
5,375.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
16   |
EACH |
190.00 |
3,040.00 |
175.00 |
2,800.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
20.24 |
ACRE |
1,675.00 |
33,902.00 |
1,100.00 |
22,264.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
35,000.00 |
35,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-001 |
sawcutting existing concrete drives (4" minimum depth)
|
296   |
LNFT |
15.00 |
4,440.00 |
18.00 |
5,328.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,546,972.04 |
|
3,006,844.74 |
|
|
|
|
|