Letting of 8/29/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 045-31-0024
Parish: CADDO
Routes: LA 169
Description: JUNCTION LA 767 - JUNCTION US 71
Type Const: cold planing asphaltic pavement, in-place cement treated base course, superpave
asphaltic concrete pavement, pavement patching and related work.
Estimated Construction Cost: $2,271,723.63
 
RankLicenseBidderConstruction Bid
1 36374 BEST-YET BUILDERS, LLC $2,074,614.41
2 17464 BENTON & BROWN, LLC. $2,238,211.61
3 08584 MADDEN CONTRACTING CO., INC. $2,692,056.43
 
Item Number Item Description Quantity Unit of Measure - 1 -
BEST-YET BUILDERS, LLC
- 2 -
BENTON & BROWN, LLC.
- 3 -
MADDEN CONTRACTING CO., INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 12      SQYD 10.00 120.00 70.00 840.00 50.00 600.00    
202-02-H removal of guard rail 692      LNFT 4.00 2,768.00 4.40 3,044.80 3.50 2,422.00    
202-02-I removal of culvert pipe 4      LNFT 150.00 600.00 25.00 100.00 100.00 400.00    
203-05 excavation and embankment lump      LUMP 50,000.00 50,000.00 20,000.00 20,000.00 47,500.00 47,500.00    
203-07 borrow (vehicular measurement) 4,500      CUYD 6.00 27,000.00 18.00 81,000.00 15.50 69,750.00    
308-01-A in-place cement treated base course (12" thick) 23,420      SQYD 7.50 175,650.00 7.70 180,334.00 9.80 229,516.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
131      CUYD 45.00 5,895.00 40.00 5,240.00 106.50 13,951.50    
402-01 traffic maintenance aggregate (vehicular measurement) 15.0    CUYD 100.00 1,500.00 20.50 307.50 75.00 1,125.00    
502-01 superpave asphaltic concrete 14,533.1    TON 70.00 1,017,317.00 75.00 1,089,982.50 78.50 1,140,848.35    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,022.7    TON 80.00 81,816.00 85.00 86,929.50 150.50 153,916.35    
507-01-A asphaltic material (crs-2p emulsion) 30,982      GAL 1.91 59,175.62 1.90 58,865.80 2.00 61,964.00    
507-02-B aggregate (s2) 34,885      SQYD 2.30 80,235.50 2.30 80,235.50 2.35 81,979.75    
507-02-C aggregate (s3) 58,305      SQYD 1.54 89,789.70 1.54 89,789.70 1.60 93,288.00    
509-01 cold planing asphaltic pavement 70,126      SQYD 1.50 105,189.00 1.25 87,657.50 1.85 129,733.10    
509-02 contractor retained reclaimed asphaltic pavement - 1,104      CUYD 0.10 - 110.40 0.90 - 993.60 1.00 - 1,104.00    
510-01-A pavement patching (6" minimum thickness) 410      SQYD 65.00 26,650.00 50.00 20,500.00 68.50 28,085.00    
701-01-K/M cross drain pipe (30" rcp/pcp or 36" cmp) 56      LNFT 200.00 11,200.00 255.00 14,280.00 180.00 10,080.00    
701-08 relaying pipe 8      LNFT 110.00 880.00 120.00 960.00 135.00 1,080.00    
701-10-G reinforced concrete pipe (extension)(18") 16      LNFT 100.00 1,600.00 140.00 2,240.00 175.00 2,800.00    
701-10-I reinforced concrete pipe (extension)(24") 26      LNFT 125.00 3,250.00 180.00 4,680.00 195.00 5,070.00    
701-10-K reinforced concrete pipe (extension)(30") 140      LNFT 150.00 21,000.00 185.00 25,900.00 220.00 30,800.00    
701-12-N corrugated metal pipe (extension)(42") 48      LNFT 200.00 9,600.00 230.00 11,040.00 520.00 24,960.00    
701-15 concrete collar 4      EACH 1,000.00 4,000.00 850.00 3,400.00 1,000.00 4,000.00    
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 200.0    LNFT 34.50 6,900.00 46.00 9,200.00 31.00 6,200.00    
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 456.0    LNFT 52.25 23,826.00 62.50 28,500.00 47.50 21,660.00    
704-03 blocked out guard rail 237.5    LNFT 19.25 4,571.88 27.50 6,531.25 17.50 4,156.25    
704-11-B guard rail end treatment (tangent) 8      EACH 2,585.00 20,680.00 2,700.00 21,600.00 2,350.00 18,800.00    
710-01 flowable fill 8      CUYD 100.00 800.00 275.00 2,200.00 725.00 5,800.00    
712-02 sacked concrete revetment 358      SQYD 100.00 35,800.00 80.00 28,640.00 140.00 50,120.00    
713-01 temporary signs & barricades lump      LUMP 50,000.00 50,000.00 55,000.00 55,000.00 157,500.00 157,500.00    
713-02-E temporary pavement markings (24" width) 77      LNFT 1.00 77.00 1.00 77.00 0.01 0.77    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
10.038  MILE 250.00 2,509.50 345.00 3,463.11 325.00 3,262.35    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
5.624  MILE 1.00 5.62 325.00 1,827.80 1.00 5.62    
713-04-A temporary pavement markings (solid line)(4" width) 40.735  MILE 1.00 40.74 500.00 20,367.50 1.00 40.74    
713-05-D temporary pavement legends and symbols (rr crossing) 2      EACH 55.00 110.00 55.00 110.00 1.00 2.00    
713-06-A temporary reflectorized raised pavement markers (tabs) 831      EACH 1.10 914.10 1.50 1,246.50 1.35 1,121.85    
716-01-A mulch (vegetative) 20.00   TON 5.25 105.00 820.00 16,400.00 700.00 14,000.00    
722-02 project site laboratory (equipped) 1      EACH 10,000.00 10,000.00 5,750.00 5,750.00 10,000.00 10,000.00    
727-01 mobilization lump      LUMP 25,000.00 25,000.00 55,000.00 55,000.00 157,500.00 157,500.00    
729-16-B object marker assembly (type 2) 2      EACH 75.00 150.00 65.00 130.00 65.00 130.00    
729-16-C object marker assembly (type 3) 8      EACH 85.00 680.00 100.00 800.00 75.00 600.00    
731-02 reflectorized raised pavement markers 952      EACH 5.50 5,236.00 5.60 5,331.20 4.50 4,284.00    
732-01-E plastic pavement striping (24" width) 77      LNFT 3.60 277.20 3.60 277.20 3.00 231.00    
732-02-A plastic pavement striping (solid line) (4" width) 22.952  MILE 2,850.00 65,413.20 2,750.00 63,118.00 2,150.00 49,346.80    
732-03-A plastic pavement striping (broken line)(4" width) 3.490  MILE 875.00 3,053.75 875.00 3,053.75 700.00 2,443.00    
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 475.00 950.00 465.00 930.00 400.00 800.00    
735-01 mailboxes 41      EACH 10.00 410.00 1.10 45.10 1.00 41.00    
735-02 mailbox supports (single) 23      EACH 50.00 1,150.00 150.00 3,450.00 135.00 3,105.00    
735-03 mailbox supports (double) 9      EACH 100.00 900.00 200.00 1,800.00 180.00 1,620.00    
739-01 hydro-seeding 10.00   ACRE 1,800.00 18,000.00 1,675.00 16,750.00 1,500.00 15,000.00    
740-01 construction layout lump      LUMP 20,000.00 20,000.00 15,000.00 15,000.00 25,000.00 25,000.00    
805-01-B class a concrete (box culvert headwalls) 0.65   CUYD 1,000.00 650.00 4,600.00 2,990.00 7,700.00 5,005.00    
806-01 deformed reinforcing steel 79      LB 1.00 79.00 10.00 790.00 4.00 316.00    
S-001 saw cutting concrete drives (4" depth) 60      LNFT 20.00 1,200.00 25.00 1,500.00 20.00 1,200.00    
                       
 CONTRACTOR TOTAL       2,074,614.41   2,238,211.61   2,692,056.43    