| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - VANTEL, INC |
- 2 - RCS CONTRACTORS, INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
15,000.00 |
15,000.00 |
NO BID |
NO BID |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
3,275   |
SQYD |
15.00 |
49,125.00 |
14.00 |
45,850.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
565.0 |
LNFT |
15.00 |
8,475.00 |
7.00 |
3,955.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
950   |
CUYD |
30.00 |
28,500.00 |
20.00 |
19,000.00 |
|
|
|
|
| 701-01-F |
cross drain pipe (15" rcp)
|
180   |
LNFT |
83.00 |
14,940.00 |
200.00 |
36,000.00 |
|
|
|
|
| 701-01-G |
cross drain pipe (18" rcp)
|
9   |
LNFT |
90.00 |
810.00 |
200.00 |
1,800.00 |
|
|
|
|
| 701-01-M |
cross drain pipe (36" rcp)
|
16   |
LNFT |
150.00 |
2,400.00 |
200.00 |
3,200.00 |
|
|
|
|
| 701-07-B-01 |
yard drain pipe (6" pvc-outfall)
|
20   |
LNFT |
25.00 |
500.00 |
60.00 |
1,200.00 |
|
|
|
|
| 701-07-C-01 |
yard drain pipe (8" pvc-outfall)
|
60   |
LNFT |
30.00 |
1,800.00 |
60.00 |
3,600.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
8,000.00 |
8,000.00 |
3,300.00 |
3,300.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
5,920.0 |
SQYD |
49.00 |
290,080.00 |
51.12 |
302,630.40 |
|
|
|
|
| 706-01-C |
concrete walk (6" thick)
|
500.0 |
SQYD |
64.00 |
32,000.00 |
83.90 |
41,950.00 |
|
|
|
|
| 707-01 |
concrete curb
|
565.0 |
LNFT |
22.00 |
12,430.00 |
35.00 |
19,775.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 715-01 |
topsoil
|
11   |
CUYD |
40.00 |
440.00 |
30.00 |
330.00 |
|
|
|
|
| 717-01 |
seeding
|
45   |
LB |
20.00 |
900.00 |
20.00 |
900.00 |
|
|
|
|
| 718-01 |
fertilizer
|
1,000   |
LB |
5.00 |
5,000.00 |
1.00 |
1,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
27,570.00 |
27,570.00 |
26,600.00 |
26,600.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
7,000.00 |
7,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| S-001 |
sawcutting of existing hard surface
|
500   |
LNFT |
7.00 |
3,500.00 |
16.00 |
8,000.00 |
|
|
|
|
| S-002 |
truncated domes for handicap ramps
|
93.5 |
SQYD |
300.00 |
28,050.00 |
500.00 |
46,750.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
551,520.00 |
|
590,840.40 |
|
|
|
|
|