Letting of 8/29/2007 LA DOTD Headquarters


READV
go back
Go Back
 
Lead Project: 033-01-0034
Parish: AVOYELLES
Routes: LA 115
Description: CITY OF MARKSVILLE SIDEWALKS
Type Const: concrete sidewalks and related work.
Estimated Construction Cost: $545,031.00
 
RankLicenseBidderConstruction Bid
1 37477 VANTEL, INC $551,520.00
2 25088 RCS CONTRACTORS, INC. $590,840.40
 
Item Number Item Description Quantity Unit of Measure - 1 -
VANTEL, INC
- 2 -
RCS CONTRACTORS, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 15,000.00 15,000.00 NO BID NO BID        
202-02-D removal of concrete walks & drives 3,275      SQYD 15.00 49,125.00 14.00 45,850.00        
202-02-E removal of concrete curbs 565.0    LNFT 15.00 8,475.00 7.00 3,955.00        
203-07 borrow (vehicular measurement) 950      CUYD 30.00 28,500.00 20.00 19,000.00        
701-01-F cross drain pipe (15" rcp) 180      LNFT 83.00 14,940.00 200.00 36,000.00        
701-01-G cross drain pipe (18" rcp) 9      LNFT 90.00 810.00 200.00 1,800.00        
701-01-M cross drain pipe (36" rcp) 16      LNFT 150.00 2,400.00 200.00 3,200.00        
701-07-B-01 yard drain pipe (6" pvc-outfall) 20      LNFT 25.00 500.00 60.00 1,200.00        
701-07-C-01 yard drain pipe (8" pvc-outfall) 60      LNFT 30.00 1,800.00 60.00 3,600.00        
702-03-A catch basins (cb-01) 1      EACH 8,000.00 8,000.00 3,300.00 3,300.00        
706-01-A concrete walk (4" thick) 5,920.0    SQYD 49.00 290,080.00 51.12 302,630.40        
706-01-C concrete walk (6" thick) 500.0    SQYD 64.00 32,000.00 83.90 41,950.00        
707-01 concrete curb 565.0    LNFT 22.00 12,430.00 35.00 19,775.00        
713-01 temporary signs & barricades lump      LUMP 15,000.00 15,000.00 15,000.00 15,000.00        
715-01 topsoil 11      CUYD 40.00 440.00 30.00 330.00        
717-01 seeding 45      LB 20.00 900.00 20.00 900.00        
718-01 fertilizer 1,000      LB 5.00 5,000.00 1.00 1,000.00        
727-01 mobilization lump      LUMP 27,570.00 27,570.00 26,600.00 26,600.00        
740-01 construction layout lump      LUMP 7,000.00 7,000.00 10,000.00 10,000.00        
S-001 sawcutting of existing hard surface 500      LNFT 7.00 3,500.00 16.00 8,000.00        
S-002 truncated domes for handicap ramps 93.5    SQYD 300.00 28,050.00 500.00 46,750.00        
                       
 CONTRACTOR TOTAL       551,520.00   590,840.40        