| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-C |
removal of portland cement concrete pavement
|
123   |
SQYD |
20.00 |
2,460.00 |
|
|
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
1,906   |
SQYD |
20.00 |
38,120.00 |
|
|
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
680.0 |
LNFT |
10.00 |
6,800.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
1,343.3 |
SQYD |
24.00 |
32,239.20 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
929   |
LNFT |
3.75 |
3,483.75 |
|
|
|
|
|
|
| 202-02-I |
removal of catch basin
|
1   |
each |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
1,100   |
CUYD |
24.55 |
27,005.00 |
|
|
|
|
|
|
| 302-02-C |
class ii base course (8" thick)
|
1,519.7 |
SQYD |
62.00 |
94,221.40 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
3,895.2 |
TON |
91.00 |
354,463.20 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
216.0 |
TON |
54.70 |
11,815.20 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
5,012   |
SQYD |
6.00 |
30,072.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 139   |
CUYD |
1.00 |
- 139.00 |
|
|
|
|
|
|
| 602-05-I-03 |
full depth patching of jointed concrete pavement, 9"
thick, 48.1 square yards and over |
100.0 |
SQYD |
150.00 |
15,000.00 |
|
|
|
|
|
|
| 702-03-A |
catch basin (cb-01)
|
1   |
EACH |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 702-03-C |
catch basin (cb-06)
|
1   |
EACH |
3,500.00 |
3,500.00 |
|
|
|
|
|
|
| 702-04-B |
adjusting catch basins
|
1   |
EACH |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 704-01-C |
guard rail (double thrie beam) (3'-1 1/2" post spacing)
|
62.5 |
LNFT |
44.00 |
2,750.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
100.0 |
LNFT |
19.00 |
1,900.00 |
|
|
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end) (single
thrie beam) |
12.5 |
LNFT |
82.00 |
1,025.00 |
|
|
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
100.0 |
LNFT |
37.00 |
3,700.00 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
52.00 |
10,400.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
10   |
EACH |
1,900.00 |
19,000.00 |
|
|
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
1,667.7 |
SQYD |
60.00 |
100,062.00 |
|
|
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
4.2 |
SQYD |
100.00 |
420.00 |
|
|
|
|
|
|
| 707-01 |
concrete curb
|
632.0 |
LNFT |
10.00 |
6,320.00 |
|
|
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
6,867.0 |
LNFT |
34.92 |
239,795.64 |
|
|
|
|
|
|
| 712-03 |
stone revetment
|
14   |
SQYD |
100.00 |
1,400.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
84,000.00 |
84,000.00 |
|
|
|
|
|
|
| 713-02-D |
temporary pavement markings (24" width)
|
217   |
LNFT |
0.30 |
65.10 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line) (4" width)
(4' length) |
0.994 |
MILE |
400.00 |
397.60 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line) (4" width)
(10' length) |
3.230 |
MILE |
300.00 |
969.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line) (4" width)
|
1.614 |
MILE |
550.00 |
887.70 |
|
|
|
|
|
|
| 713-05-D |
temporary pavement legends and symbols (rr crossing)
|
2   |
EACH |
200.00 |
400.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
4.0 |
TON |
600.00 |
2,400.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
84,000.00 |
84,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
10   |
EACH |
70.00 |
700.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
585   |
EACH |
4.70 |
2,749.50 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
217   |
LNFT |
3.00 |
651.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.230 |
MILE |
2,300.00 |
7,429.00 |
|
|
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.033 |
MILE |
5,280.00 |
174.24 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.083 |
MILE |
800.00 |
866.40 |
|
|
|
|
|
|
| 732-03-C |
plastic pavement striping (broken line)(8" width)
|
0.033 |
MILE |
1,600.00 |
52.80 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
150.00 |
300.00 |
|
|
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
21   |
EACH |
170.00 |
3,570.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
150.00 |
300.00 |
|
|
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
400.00 |
800.00 |
|
|
|
|
|
|
| 736-09 |
loop detector
|
1,014   |
LNFT |
22.00 |
22,308.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
1.60 |
ACRE |
1,500.00 |
2,400.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
24,000.00 |
24,000.00 |
|
|
|
|
|
|
| S-001 |
box culvert extension
|
1   |
each |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| S-002 |
sawcutting (6" depth)
|
828   |
LNFT |
16.00 |
13,248.00 |
|
|
|
|
|
|
| S-003 |
surface preparation
|
lump |
LUMP |
86,000.00 |
86,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,360,481.73 |
|
|
|
|
|
|
|