| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - D & J CONSTRUCTION CO., INC. |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
6,000.00 |
6,000.00 |
7,500.00 |
7,500.00 |
32,000.00 |
32,000.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
3,896.9 |
SQYD |
5.00 |
19,484.50 |
8.50 |
33,123.65 |
7.00 |
27,278.30 |
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
165,000.00 |
165,000.00 |
115,000.00 |
115,000.00 |
100,000.00 |
100,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
26   |
EACH |
40.00 |
1,040.00 |
60.00 |
1,560.00 |
56.00 |
1,456.00 |
|
|
| 204-06 |
temporary silt fencing
|
2,920   |
LNFT |
2.50 |
7,300.00 |
6.00 |
17,520.00 |
3.55 |
10,366.00 |
|
|
| 302-02-D |
class ii base course (8 1/2" thick)
|
4,221.6 |
SQYD |
25.00 |
105,540.00 |
25.00 |
105,540.00 |
26.00 |
109,761.60 |
|
|
| 304-01 |
lime
|
11.97 |
TON |
250.00 |
2,992.50 |
145.00 |
1,735.65 |
235.00 |
2,812.95 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
844   |
SQYD |
7.00 |
5,908.00 |
10.00 |
8,440.00 |
15.00 |
12,660.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
487   |
CUYD |
25.00 |
12,175.00 |
50.00 |
24,350.00 |
100.00 |
48,700.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,300.0 |
CUYD |
45.00 |
58,500.00 |
40.00 |
52,000.00 |
50.00 |
65,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
1,286.0 |
TON |
120.00 |
154,320.00 |
110.00 |
141,460.00 |
120.00 |
154,320.00 |
|
|
| 712-02 |
sacked concrete revetment
|
10   |
SQYD |
130.00 |
1,300.00 |
400.00 |
4,000.00 |
625.00 |
6,250.00 |
|
|
| 712-04 |
flexible revetment
|
36   |
SQYD |
100.00 |
3,600.00 |
100.00 |
3,600.00 |
240.00 |
8,640.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
7,500.00 |
7,500.00 |
45,000.00 |
45,000.00 |
21,000.00 |
21,000.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.277 |
MILE |
100.00 |
27.70 |
300.00 |
83.10 |
300.00 |
83.10 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
0.554 |
MILE |
1,000.00 |
554.00 |
1.00 |
0.55 |
1,100.00 |
609.40 |
|
|
| 716-01-A |
mulch (vegetative)
|
3.7 |
TON |
450.00 |
1,665.00 |
400.00 |
1,480.00 |
400.00 |
1,480.00 |
|
|
| 717-01 |
seeding
|
222   |
LB |
10.00 |
2,220.00 |
8.00 |
1,776.00 |
10.00 |
2,220.00 |
|
|
| 718-01 |
fertilizer
|
3,700   |
LB |
0.50 |
1,850.00 |
0.40 |
1,480.00 |
0.50 |
1,850.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
700   |
SQYD |
1.50 |
1,050.00 |
1.50 |
1,050.00 |
1.50 |
1,050.00 |
|
|
| 725-03 |
low profile runaround
|
1   |
EACH |
42,000.00 |
42,000.00 |
75,000.00 |
75,000.00 |
35,000.00 |
35,000.00 |
|
|
| 726-01 |
bedding material
|
94.2 |
CUYD |
200.00 |
18,840.00 |
95.00 |
8,949.00 |
115.00 |
10,833.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
70,000.00 |
70,000.00 |
75,000.00 |
75,000.00 |
75,000.00 |
75,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
100.00 |
200.00 |
78.00 |
156.00 |
125.00 |
250.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
37   |
EACH |
12.00 |
444.00 |
26.00 |
962.00 |
27.54 |
1,018.98 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.554 |
MILE |
5,500.00 |
3,047.00 |
7,500.00 |
4,155.00 |
13,770.20 |
7,628.69 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.277 |
MILE |
2,000.00 |
554.00 |
5,400.00 |
1,495.80 |
1,377.00 |
381.43 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
16,000.00 |
16,000.00 |
10,000.00 |
10,000.00 |
11,704.67 |
11,704.67 |
|
|
| 805-12-I |
reinforced concrete box culverts (5'x 5')
|
100.0 |
LNFT |
700.00 |
70,000.00 |
480.00 |
48,000.00 |
550.81 |
55,081.00 |
|
|
| S-001 |
full depth sawcut in asphaltic concrete roadway
|
48   |
LNFT |
10.00 |
480.00 |
15.00 |
720.00 |
39.95 |
1,917.60 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
779,591.70 |
|
791,136.75 |
|
806,352.72 |
|
|
|