Letting of 8/29/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 015-08-0026
Parish: OUACHITA
Routes: US 165
Description: LA 841 - RILLA
Type Const: grading, drainage struct, lime treat, class ii base course, portland cement concrete
pavement (alt. a-1), superpave asphaltic concrete pavement (alt. a-2) and related work.
Estimated Construction Cost: $19,696,574.78
Maximum Number of Days Allowed for Construction: 625
Calculated Daily User Cost: $4,600.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Life Cycle
Cost
Total Bid
1 05789 D & J CONSTRUCTION CO., INC. $15,856,654.46 525 $1,690,600.00 $19,962,254.46
2 34567 JAMES CONSTRUCTION GROUP LLC $18,471,969.65 625 $1,690,600.00 $23,037,569.65
3 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $18,681,860.09 625 $1,690,600.00 $23,247,460.09
4 42076 AUSTIN BRIDGE & ROAD, LP $18,895,908.98 550 $599,700.00 $22,025,608.98
5 12312 GILCHRIST CONSTRUCTION CO. LLC $19,892,702.19 625 $1,690,600.00 $24,458,302.19
6 39462 DENTON-JAMES LLC $20,982,298.38 625 $1,690,600.00 $25,547,898.38
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 4 -
AUSTIN BRIDGE & ROAD, LP
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 150,000.00 150,000.00 615,000.00 615,000.00 500,000.00 500,000.00 60,000.00 60,000.00
202-01 removal of structures & obstructions lump      LUMP 40,000.00 40,000.00 35,000.00 35,000.00 30,000.00 30,000.00 39,735.44 39,735.44
202-02-B-01 removal of 4' x 2' x 46' concrete box culvert (rt. of
sta. 358+67)
1      EACH 2,200.00 2,200.00 3,750.00 3,750.00 6,500.00 6,500.00 3,227.03 3,227.03
202-02-B-02 removal of 4' x 3' x 47' concrete box culvert (rt. of
sta. 392+27)
1      EACH 2,200.00 2,200.00 3,750.00 3,750.00 3,200.00 3,200.00 3,442.18 3,442.18
202-02-B-03 removal of 4' x 2' x 53' concrete box culvert (rt. of
sta. 398+42)
1      EACH 2,200.00 2,200.00 3,850.00 3,850.00 3,200.00 3,200.00 3,227.03 3,227.03
202-02-B-04 removal of 4' x 2' x 49' concrete box culvert (rt. of
sta. 446+94)
1      EACH 2,200.00 2,200.00 3,775.00 3,775.00 3,200.00 3,200.00 3,227.03 3,227.03
202-02-B-05 removal of 3' x 2' x 47' concrete box culvert (rt. of
sta. 458+57)
1      EACH 2,200.00 2,200.00 3,750.00 3,750.00 3,200.00 3,200.00 2,366.51 2,366.51
202-02-B-06 removal of 3' x 2' x 46' concrete box culvert (rt. of
sta. 482+18)
1      EACH 2,200.00 2,200.00 3,725.00 3,725.00 3,200.00 3,200.00 2,366.51 2,366.51
202-02-B-07 removal of 5' x 2' x 46' concrete box culvert (rt. of
sta. 601+24)
1      EACH 2,200.00 2,200.00 3,725.00 3,725.00 3,200.00 3,200.00 3,872.46 3,872.46
202-02-C-01 removal of portland cement concrete pavement with hmac
overlay
19,558      SQYD 4.00 78,232.00 8.00 156,464.00 6.00 117,348.00 6.73 131,625.34
202-02-E removal of concrete curbs 742.0    LNFT 5.00 3,710.00 3.00 2,226.00 8.75 6,492.50 4.35 3,227.70
202-02-G removal of surfacing & stabilized base 26,456.9    SQYD 4.00 105,827.60 4.50 119,056.05 4.60 121,701.74 4.67 123,553.72
202-02-H removal of guard rail 411      LNFT 4.00 1,644.00 6.00 2,466.00 10.00 4,110.00 5.38 2,211.18
202-02-I-01 removal of 149' x 41' concrete slab (lt. of sta.
336+11)
1      EACH 2,600.00 2,600.00 2,500.00 2,500.00 6,500.00 6,500.00 7,635.78 7,635.78
202-02-I-02 removal of 53' x 28' concrete slab (lt. of sta. 614+62) 1      EACH 2,600.00 2,600.00 1,000.00 1,000.00 3,200.00 3,200.00 1,908.95 1,908.95
202-02-J removal of rail spur including road crossing lump      LUMP 14,000.00 14,000.00 13,500.00 13,500.00 13,000.00 13,000.00 14,358.38 14,358.38
202-02-K-01 removal of rail spur signal foundation (rt. of sta.
597+72)
1      EACH 3,000.00 3,000.00 10,000.00 10,000.00 2,750.00 2,750.00 2,689.21 2,689.21
202-02-K-02 removal of rail spur signal foundation (rt. of sta.
597+82)
1      EACH 3,000.00 3,000.00 10,000.00 10,000.00 4,200.00 4,200.00 2,689.21 2,689.21
203-01 general excavation 52,334      CUYD 3.50 183,169.00 4.00 209,336.00 4.00 209,336.00 3.88 203,055.92
203-03 embankment 227,468      CUYD 7.50 1,706,010.00 8.50 1,933,478.00 11.50 2,615,882.00 7.76 1,765,151.68
203-04-A nonplastic embankment (stone) 2,420      CUYD 80.00 193,600.00 88.00 212,960.00 95.00 229,900.00 90.57 219,179.40
203-08 geotextile fabric 10,127      SQYD 1.25 12,658.75 2.50 25,317.50 1.25 12,658.75 4.80 48,609.60
204-02 temporary hay or straw bales 98      EACH 12.00 1,176.00 15.00 1,470.00 20.00 1,960.00 10.75 1,053.50
204-05-A temporary sediment check dams (hay) 137      EACH 100.00 13,700.00 270.00 36,990.00 115.00 15,755.00 107.57 14,737.09
204-05-B temporary sediment check dams (stone) 63      EACH 350.00 22,050.00 300.00 18,900.00 600.00 37,800.00 430.27 27,107.01
204-06 temporary silt fencing 44,555      LNFT 0.50 22,277.50 2.25 100,248.75 3.00 133,665.00 1.50 66,832.50
204-07 temporary stone construction entrance 2      EACH 1,200.00 2,400.00 3,000.00 6,000.00 3,200.00 6,400.00 3,764.88 7,529.76
302-02-C-01 class ii base course (8" thick)(soil cement) 188,279.6    SQYD 9.75 1,835,726.10 11.00 2,071,075.60 9.50 1,788,656.20 6.88 1,295,363.65
304-05 lime treatment (type e) 1,350.00   TON 125.00 168,750.00 240.00 324,000.00 234.00 315,900.00 50.00 67,500.00
401-02 aggregate surface course (adjusted vehicular
measurement)
476      CUYD 40.00 19,040.00 50.00 23,800.00 78.00 37,128.00 200.00 95,200.00
402-01 traffic maintenance aggregate (vehicular measurement) 3,000.0    CUYD 8.00 24,000.00 80.00 240,000.00 70.00 210,000.00 15.00 45,000.00
509-01 cold planing asphaltic pavement 7,444      SQYD 2.00 14,888.00 3.00 22,332.00 1.50 11,166.00 2.26 16,823.44
509-02 contractor retained reclaimed asphaltic pavement - 414      CUYD 0.01 - 4.14 1.00 - 414.00 0.10 - 41.40 0.01 - 4.14
510-01-C pavement patching (18" minimum thickness) 754      SQYD 120.00 90,480.00 300.00 226,200.00 150.00 113,100.00 49.98 37,684.92
510-02 pavement widening 541.3    SQYD 85.00 46,010.50 65.00 35,184.50 84.00 45,469.20 80.75 43,709.98
701-01-I cross drain pipe (24" rcp/pcp) 1,346      LNFT 80.00 107,680.00 75.00 100,950.00 105.00 141,330.00 66.69 89,764.74
701-01-K cross drain pipe (30" rcp/pcp) 794      LNFT 110.00 87,340.00 96.00 76,224.00 125.00 99,250.00 82.83 65,767.02
701-01-M cross drain pipe (36" rcp/pcp) 1,332      LNFT 140.00 186,480.00 143.00 190,476.00 157.00 209,124.00 104.34 138,980.88
701-02-A cross drain pipe arch (15" equiv. rcpa) 322      LNFT 65.00 20,930.00 60.00 19,320.00 88.00 28,336.00 61.31 19,741.82
701-02-D cross drain pipe arch (24" equiv. rcpa) 2,912      LNFT 80.00 232,960.00 103.00 299,936.00 115.00 334,880.00 82.83 241,200.96
701-02-F cross drain pipe arch (36" equiv. rcpa) 2,564      LNFT 140.00 358,960.00 150.00 384,600.00 180.00 461,520.00 115.10 295,116.40
701-03-G storm drain pipe (18" rcp/pcp) 288      LNFT 60.00 17,280.00 45.00 12,960.00 78.00 22,464.00 55.94 16,110.72
701-03-G-01 storm drain pipe (18" pcp)(outfall) 96      LNFT 80.00 7,680.00 48.00 4,608.00 80.00 7,680.00 55.94 5,370.24
701-04-B storm drain pipe arch (18" equiv. rcpa) 592      LNFT 80.00 47,360.00 73.00 43,216.00 88.00 52,096.00 72.07 42,665.44
701-05-G side drain pipe (18") 236      LNFT 60.00 14,160.00 49.00 11,564.00 58.00 13,688.00 55.94 13,201.84
701-05-I side drain pipe (24") 1,104      LNFT 70.00 77,280.00 57.00 62,928.00 80.00 88,320.00 66.69 73,625.76
701-05-K side drain pipe (30") 542      LNFT 90.00 48,780.00 72.00 39,024.00 90.00 48,780.00 82.83 44,893.86
701-05-M side drain pipe (36") 88      LNFT 95.00 8,360.00 95.00 8,360.00 110.00 9,680.00 104.34 9,181.92
701-06-D side drain pipe arch (24" equiv.) 132      LNFT 85.00 11,220.00 75.00 9,900.00 90.00 11,880.00 82.83 10,933.56
701-06-D-01 side drain pipe arch (24" equiv.)(class iv rcpa) 112      LNFT 120.00 13,440.00 124.00 13,888.00 100.00 11,200.00 82.83 9,276.96
701-06-F side drain pipe arch (36" equiv.) 82      LNFT 135.00 11,070.00 98.00 8,036.00 145.00 11,890.00 115.10 9,438.20
701-10-I reinforced concrete pipe (extension)(24") 266      LNFT 170.00 45,220.00 84.00 22,344.00 70.00 18,620.00 64.54 17,167.64
701-10-K reinforced concrete pipe (extension)(30") 406      LNFT 195.00 79,170.00 112.00 45,472.00 90.00 36,540.00 80.68 32,756.08
701-10-M reinforced concrete pipe (extension)(36") 212      LNFT 225.00 47,700.00 167.00 35,404.00 105.00 22,260.00 112.95 23,945.40
701-15 concrete collar 9      EACH 1,100.00 9,900.00 830.00 7,470.00 700.00 6,300.00 1,613.52 14,521.68
702-02-A manholes (mh-06) 12      EACH 5,200.00 62,400.00 5,800.00 69,600.00 5,000.00 60,000.00 5,324.61 63,895.32
702-02-B manholes (r-cb-11) 13      EACH 3,750.00 48,750.00 5,800.00 75,400.00 4,500.00 58,500.00 4,464.07 58,032.91
702-02-C manholes (r-cb-11 mod) 2      EACH 6,200.00 12,400.00 6,000.00 12,000.00 5,100.00 10,200.00 4,948.12 9,896.24
702-03-A catch basins (cb-01) 13      EACH 3,200.00 41,600.00 4,150.00 53,950.00 3,300.00 42,900.00 3,549.74 46,146.62
702-03-B catch basins (cb-02) 1      EACH 3,900.00 3,900.00 5,650.00 5,650.00 4,000.00 4,000.00 5,808.67 5,808.67
702-07-A cross drain safety end (type 1) 19      EACH 3,600.00 68,400.00 3,200.00 60,800.00 3,000.00 57,000.00 2,097.57 39,853.83
702-07-B cross drain safety end (type 2) 6      EACH 4,100.00 24,600.00 5,400.00 32,400.00 4,500.00 27,000.00 2,796.77 16,780.62
702-08-A side drain safety end (type 1) 35      EACH 1,600.00 56,000.00 1,400.00 49,000.00 2,500.00 87,500.00 2,796.77 97,886.95
702-08-B side drain safety end (type 2) 4      EACH 4,100.00 16,400.00 5,800.00 23,200.00 3,400.00 13,600.00 3,119.48 12,477.92
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 50.0    LNFT 37.00 1,850.00 36.00 1,800.00 40.00 2,000.00 38.72 1,936.00
704-03 blocked out guard rail 118.8    LNFT 19.00 2,257.20 18.50 2,197.80 20.00 2,376.00 19.90 2,364.12
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
6.3    LNFT 100.00 630.00 95.00 598.50 105.00 661.50 102.19 643.80
704-11-B guard rail end treatment (tangent) 1      EACH 2,900.00 2,900.00 2,800.00 2,800.00 3,000.00 3,000.00 3,011.92 3,011.92
705-01 barbed wire fence 1,110      LNFT 6.50 7,215.00 6.00 6,660.00 5.50 6,105.00 5.91 6,560.10
705-06-A chain link fence (4-foot height) 61      LNFT 21.00 1,281.00 20.00 1,220.00 22.00 1,342.00 16.14 984.54
705-06-C chain link fence (6-foot height) 896      LNFT 18.00 16,128.00 17.00 15,232.00 24.00 21,504.00 22.59 20,240.64
705-06-D chain link fence (7-foot height) 330      LNFT 24.00 7,920.00 23.00 7,590.00 39.00 12,870.00 30.12 9,939.60
705-08-C-01 24-foot double gates for chain link fence (6-foot
height)
2      DBGT 1,150.00 2,300.00 1,100.00 2,200.00 1,100.00 2,200.00 1,344.61 2,689.22
705-08-C-02 26-foot double gates for chain link fence (6-foot
height)
3      DBGT 1,250.00 3,750.00 1,200.00 3,600.00 1,300.00 3,900.00 1,425.28 4,275.84
705-08-D 12-foot double gates for chain link fence (7-foot
height)
1      DBGT 1,550.00 1,550.00 1,500.00 1,500.00 1,100.00 1,100.00 1,344.61 1,344.61
708-01 right-of-way monument 60      EACH 210.00 12,600.00 200.00 12,000.00 110.00 6,600.00 225.89 13,553.40
708-02 right-of-way monument witness post 60      EACH 85.00 5,100.00 150.00 9,000.00 110.00 6,600.00 172.11 10,326.60
713-01 temporary signs & barricades lump      LUMP 225,000.00 225,000.00 95,000.00 95,000.00 160,000.00 160,000.00 150,000.00 150,000.00
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
13.300  MILE 360.00 4,788.00 350.00 4,655.00 330.00 4,389.00 376.48 5,007.18
713-03-B-01 temporary pvmt. markings (broken line)(4" w)(10' l)
(type i removable)
0.250  MILE 11,050.00 2,762.50 11,000.00 2,750.00 4,100.00 1,025.00 11,832.52 2,958.13
713-04-A temporary pavement markings (solid line)(4" width) 37.500  MILE 500.00 18,750.00 500.00 18,750.00 550.00 20,625.00 537.84 20,169.00
713-04-A-01 temporary pvmt. markings (solid line)(4" w)(type i
removable)
23.000  MILE 4,000.00 92,000.00 5,200.00 119,600.00 14,000.00 322,000.00 7,529.75 173,184.25
713-05-D temporary pavement legends and symbols (rr crossing) 5      EACH 175.00 875.00 150.00 750.00 220.00 1,100.00 161.35 806.75
713-06 temporary reflectorized raised pavement markers 1,050      EACH 6.00 6,300.00 6.00 6,300.00 5.00 5,250.00 6.45 6,772.50
716-01-A mulch (vegetative) 160.0    TON 360.00 57,600.00 350.00 56,000.00 380.00 60,800.00 462.54 74,006.40
717-01 seeding 4,100      LB 8.00 32,800.00 8.00 32,800.00 9.00 36,900.00 8.06 33,046.00
718-01 fertilizer 91,000      LB 0.40 36,400.00 0.40 36,400.00 0.45 40,950.00 0.28 25,480.00
720-01-A erosion control system, slope protection (type a) 10,723      SQYD 1.00 10,723.00 1.00 10,723.00 1.10 11,795.30 1.16 12,438.68
720-01-C erosion control system, flexible channel liner (type c) 1,473      SQYD 1.00 1,473.00 1.00 1,473.00 1.10 1,620.30 2.15 3,166.95
720-01-D erosion control system, flexible channel liner (type d) 1,324      SQYD 1.00 1,324.00 1.00 1,324.00 1.10 1,456.40 2.15 2,846.60
722-02 project site laboratory (equipped) 1      EACH 35,000.00 35,000.00 12,000.00 12,000.00 45,000.00 45,000.00 100,000.00 100,000.00
725-01 temporary detour roads 2,841.2    SQYD 50.00 142,060.00 115.00 326,738.00 55.00 156,266.00 76.41 217,096.09
726-01-A bedding material (stone or recycled pccp) 2,669.1    CUYD 85.00 226,873.50 54.00 144,131.40 75.00 200,182.50 100.00 266,910.00
727-01 mobilization lump      LUMP 640,000.00 640,000.00 1,800,000.00 1,800,000.00 1,549,000.00 1,549,000.00 1,855,000.00 1,855,000.00
729-16-C object marker assembly (type 3) 2      EACH 100.00 200.00 100.00 200.00 110.00 220.00 107.57 215.14
731-02 reflectorized raised pavement markers 2,494      EACH 6.50 16,211.00 6.50 16,211.00 5.00 12,470.00 5.38 13,417.72
732-01-A-04 plastic pavement striping (4" width)(dashed line)(2'
stripe, 4' gap)
257      LNFT 6.50 1,670.50 6.50 1,670.50 1.10 282.70 5.91 1,518.87
732-01-C plastic pavement striping (8" width) 3,429      LNFT 5.50 18,859.50 5.50 18,859.50 1.10 3,771.90 4.30 14,744.70
732-01-E plastic pavement striping (24" width) 907      LNFT 8.50 7,709.50 8.25 7,482.75 3.30 2,993.10 7.53 6,829.71
732-02-A plastic pavement striping (solid line) (4" width) 28.654  MILE 2,950.00 84,529.30 3,000.00 85,962.00 2,500.00 71,635.00 2,258.93 64,727.38
732-04-A plastic pavement legends & symbols (arrow) 18      EACH 400.00 7,200.00 400.00 7,200.00 150.00 2,700.00 430.27 7,744.86
732-04-C plastic pavement legends & symbols (only) 18      EACH 400.00 7,200.00 400.00 7,200.00 170.00 3,060.00 430.27 7,744.86
732-04-D plastic pavement legends & symbols (rr crossing) 5      EACH 625.00 3,125.00 800.00 4,000.00 440.00 2,200.00 645.40 3,227.00
732-05 removal of existing markings 6.785  MILE 4,200.00 28,497.00 4,500.00 30,532.50 5,500.00 37,317.50 3,764.88 25,544.71
735-01 mailboxes 3      EACH 25.00 75.00 10.00 30.00 16.00 48.00 26.90 80.70
735-02 mailbox supports (single) 3      EACH 175.00 525.00 150.00 450.00 175.00 525.00 80.68 242.04
740-01 construction layout lump      LUMP 295,000.00 295,000.00 210,000.00 210,000.00 300,000.00 300,000.00 300,000.00 300,000.00
805-01-A class a concrete (pipe headwalls) 5.92   CUYD 1,100.00 6,512.00 1,200.00 7,104.00 1,650.00 9,768.00 1,920.91 11,371.79
805-01-B class a concrete (box culvert headwalls) 3.33   CUYD 1,600.00 5,328.00 1,600.00 5,328.00 2,750.00 9,157.50 2,038.94 6,789.67
805-12-Y-01 reinforced concrete box culverts (3' x 2')(extension) 18.0    LNFT 750.00 13,500.00 530.00 9,540.00 700.00 12,600.00 443.53 7,983.54
805-12-Z-01 reinforced concrete box culverts (4' x 2')(extension) 224.0    LNFT 365.00 81,760.00 220.00 49,280.00 600.00 134,400.00 284.29 63,680.96
805-12-Z-02 reinforced concrete box culverts (5' x 2')(extension) 16.0    LNFT 875.00 14,000.00 735.00 11,760.00 700.00 11,200.00 568.69 9,099.04
806-01 deformed reinforcing steel 538      LB 2.00 1,076.00 1.00 538.00 3.50 1,883.00 0.97 521.86
S-001 rumble strips (ground-in) 12.1    MILE 625.00 7,562.50 760.00 9,196.00 700.00 8,470.00 943.45 11,415.75
S-002 reconstruction of rail spur 548.03   LNFT 345.00 189,070.35 170.00 93,165.10 700.00 383,621.00 411.84 225,700.68
S-003 rail spur roadway crossing 219.38   LNFT 1,000.00 219,380.00 550.00 120,659.00 1,300.00 285,194.00 940.84 206,401.48
S-004 removal of 015-08-0028 temporary connection (sta.
322+32.26 to sta. 334+61.62)
lump      LUMP 9,000.00 9,000.00 20,000.00 20,000.00 14,000.00 14,000.00 7,600.52 7,600.52
 SUBTOTAL GENERAL       9,161,566.16   11,711,256.45   12,612,409.69   9,913,700.07
                       
ALTERNATE A pavement options                    
                       
ALTERNATE A1 portland cement concrete pavement                    
203-04-A-01 nonplastic embankment (stone)(shoulder drain) 66      CUYD 0.00 0.00 0.00 0.00 0.00 0.00 232.83 15,366.78
302-02-A-01 class ii base course (4" thick)(stone or recycled pccp) 140,559.0    SQYD 0.00 0.00 0.00 0.00 0.00 0.00 8.48 1,191,940.32
302-02-B-01 class ii base course (6" thick)(stone or recycled pccp) 34,885.1    SQYD 0.00 0.00 0.00 0.00 0.00 0.00 13.40 467,460.34
302-02-H-01 class ii base course (thickness varies 8" - 10")(stone
or recycled pccp)
18,432.6    SQYD 0.00 0.00 0.00 0.00 0.00 0.00 21.94 404,411.24
502-01 superpave asphaltic concrete 5,027.2    TON 0.00 0.00 0.00 0.00 0.00 0.00 107.18 538,815.30
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,648.6    TON 0.00 0.00 0.00 0.00 0.00 0.00 112.82 185,995.05
601-01-G portland cement concrete pavement (8" thick) 107,486.9    SQYD 0.00 0.00 0.00 0.00 0.00 0.00 44.52 4,785,316.79
601-02-G portland cement concrete pavement (8" thick)
(crossovers & turnouts)
27,085.1    SQYD 0.00 0.00 0.00 0.00 0.00 0.00 48.54 1,314,710.75
601-04 portland cement concrete pavement coring 225      EACH 0.00 0.00 0.00 0.00 0.00 0.00 58.41 13,142.25
732-03-A plastic pavement striping (broken line)(4" width) 5.961  MILE 0.00 0.00 0.00 0.00 0.00 0.00 967.95 5,769.95
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape (type)
7.295  MILE 0.00 0.00 0.00 0.00 0.00 0.00 6,996.70 51,040.93
S-005 pavement grooving 7,628.9    SQYD 0.00 0.00 0.00 0.00 0.00 0.00 1.08 8,239.21
 SUBTOTAL ALT A1                   8,982,208.91
                       
ALTERNATE A2 superpave asphaltic concrete pavement                    
203-04-A-01 nonplastic embankment (stone)(shoulder drain) 41      CUYD 165.00 6,765.00 165.00 6,765.00 138.00 5,658.00 0.00 0.00
302-02-A-01 class ii base course (4" thick)(stone or recycled pccp) 175,444.1    SQYD 9.00 1,578,996.90 11.00 1,929,885.10 9.00 1,578,996.90 0.00 0.00
302-02-G-01 class ii base course (thickness varies 6" - 8")(stone
or recycled pccp)
18,432.6    SQYD 20.00 368,652.00 18.50 341,003.10 15.50 285,705.30 0.00 0.00
502-01 superpave asphaltic concrete 40,711.8    TON 88.00 3,582,638.40 80.00 3,256,944.00 74.00 3,012,673.20 0.00 0.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
10,371.0    TON 100.00 1,037,100.00 100.00 1,037,100.00 98.00 1,016,358.00 0.00 0.00
732-03-A plastic pavement striping (broken line)(4" width) 12.700  MILE 1,600.00 20,320.00 2,000.00 25,400.00 770.00 9,779.00 0.00 0.00
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v)
0.556  MILE 11,000.00 6,116.00 11,000.00 6,116.00 5,000.00 2,780.00 0.00 0.00
S-006 open graded friction course system (low volume traffic
application)
420      TON 225.00 94,500.00 375.00 157,500.00 375.00 157,500.00 0.00 0.00
 SUBTOTAL ALT A2       6,695,088.30   6,760,713.20   6,069,450.40    
                       
 ITEM TOTAL (CONSTRUCTION BID)       15,856,654.46   18,471,969.65   18,681,860.09   18,895,908.98
 NUMBER OF DAYS BID AT $4,600 PER DAY.       2,415,000.00   2,875,000.00   2,875,000.00   2,530,000.00
 LIFE CYCLE COST       1,690,600.00   1,690,600.00   1,690,600.00   599,700.00
 TOTAL BID       19,962,254.46   23,037,569.65   23,247,460.09   22,025,608.98
 
Item Number Item Description Quantity Unit of Measure - 5 -
GILCHRIST CONSTRUCTION CO. LLC
- 6 -
DENTON-JAMES LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 900,000.00 900,000.00 1,200,000.00 1,200,000.00        
202-01 removal of structures & obstructions lump      LUMP 50,000.00 50,000.00 190,000.00 190,000.00        
202-02-B-01 removal of 4' x 2' x 46' concrete box culvert (rt. of
sta. 358+67)
1      EACH 2,800.00 2,800.00 3,000.00 3,000.00        
202-02-B-02 removal of 4' x 3' x 47' concrete box culvert (rt. of
sta. 392+27)
1      EACH 2,800.00 2,800.00 3,000.00 3,000.00        
202-02-B-03 removal of 4' x 2' x 53' concrete box culvert (rt. of
sta. 398+42)
1      EACH 2,800.00 2,800.00 3,000.00 3,000.00        
202-02-B-04 removal of 4' x 2' x 49' concrete box culvert (rt. of
sta. 446+94)
1      EACH 2,800.00 2,800.00 3,000.00 3,000.00        
202-02-B-05 removal of 3' x 2' x 47' concrete box culvert (rt. of
sta. 458+57)
1      EACH 2,800.00 2,800.00 3,000.00 3,000.00        
202-02-B-06 removal of 3' x 2' x 46' concrete box culvert (rt. of
sta. 482+18)
1      EACH 2,800.00 2,800.00 3,000.00 3,000.00        
202-02-B-07 removal of 5' x 2' x 46' concrete box culvert (rt. of
sta. 601+24)
1      EACH 2,800.00 2,800.00 5,500.00 5,500.00        
202-02-C-01 removal of portland cement concrete pavement with hmac
overlay
19,558      SQYD 7.00 136,906.00 6.00 117,348.00        
202-02-E removal of concrete curbs 742.0    LNFT 3.00 2,226.00 3.00 2,226.00        
202-02-G removal of surfacing & stabilized base 26,456.9    SQYD 7.80 206,363.82 5.00 132,284.50        
202-02-H removal of guard rail 411      LNFT 6.00 2,466.00 5.00 2,055.00        
202-02-I-01 removal of 149' x 41' concrete slab (lt. of sta.
336+11)
1      EACH 3,500.00 3,500.00 8,000.00 8,000.00        
202-02-I-02 removal of 53' x 28' concrete slab (lt. of sta. 614+62) 1      EACH 3,500.00 3,500.00 3,000.00 3,000.00        
202-02-J removal of rail spur including road crossing lump      LUMP 20,000.00 20,000.00 12,000.00 12,000.00        
202-02-K-01 removal of rail spur signal foundation (rt. of sta.
597+72)
1      EACH 2,100.00 2,100.00 2,000.00 2,000.00        
202-02-K-02 removal of rail spur signal foundation (rt. of sta.
597+82)
1      EACH 2,100.00 2,100.00 2,000.00 2,000.00        
203-01 general excavation 52,334      CUYD 4.40 230,269.60 5.00 261,670.00        
203-03 embankment 227,468      CUYD 10.00 2,274,680.00 13.00 2,957,084.00        
203-04-A nonplastic embankment (stone) 2,420      CUYD 90.00 217,800.00 100.00 242,000.00        
203-08 geotextile fabric 10,127      SQYD 1.80 18,228.60 2.00 20,254.00        
204-02 temporary hay or straw bales 98      EACH 19.00 1,862.00 10.00 980.00        
204-05-A temporary sediment check dams (hay) 137      EACH 140.00 19,180.00 100.00 13,700.00        
204-05-B temporary sediment check dams (stone) 63      EACH 620.00 39,060.00 600.00 37,800.00        
204-06 temporary silt fencing 44,555      LNFT 1.70 75,743.50 1.40 62,377.00        
204-07 temporary stone construction entrance 2      EACH 7,000.00 14,000.00 2,500.00 5,000.00        
302-02-C-01 class ii base course (8" thick)(soil cement) 188,279.6    SQYD 11.00 2,071,075.60 9.40 1,769,828.24        
304-05 lime treatment (type e) 1,350.00   TON 200.00 270,000.00 300.00 405,000.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
476      CUYD 120.00 57,120.00 75.00 35,700.00        
402-01 traffic maintenance aggregate (vehicular measurement) 3,000.0    CUYD 45.00 135,000.00 65.00 195,000.00        
509-01 cold planing asphaltic pavement 7,444      SQYD 4.00 29,776.00 4.00 29,776.00        
509-02 contractor retained reclaimed asphaltic pavement - 414      CUYD 0.01 - 4.14 0.01 - 4.14        
510-01-C pavement patching (18" minimum thickness) 754      SQYD 150.00 113,100.00 250.00 188,500.00        
510-02 pavement widening 541.3    SQYD 100.00 54,130.00 120.00 64,956.00        
701-01-I cross drain pipe (24" rcp/pcp) 1,346      LNFT 80.00 107,680.00 80.00 107,680.00        
701-01-K cross drain pipe (30" rcp/pcp) 794      LNFT 95.00 75,430.00 100.00 79,400.00        
701-01-M cross drain pipe (36" rcp/pcp) 1,332      LNFT 115.00 153,180.00 120.00 159,840.00        
701-02-A cross drain pipe arch (15" equiv. rcpa) 322      LNFT 80.00 25,760.00 90.00 28,980.00        
701-02-D cross drain pipe arch (24" equiv. rcpa) 2,912      LNFT 90.00 262,080.00 110.00 320,320.00        
701-02-F cross drain pipe arch (36" equiv. rcpa) 2,564      LNFT 160.00 410,240.00 140.00 358,960.00        
701-03-G storm drain pipe (18" rcp/pcp) 288      LNFT 68.00 19,584.00 50.00 14,400.00        
701-03-G-01 storm drain pipe (18" pcp)(outfall) 96      LNFT 68.00 6,528.00 50.00 4,800.00        
701-04-B storm drain pipe arch (18" equiv. rcpa) 592      LNFT 80.00 47,360.00 60.00 35,520.00        
701-05-G side drain pipe (18") 236      LNFT 70.00 16,520.00 55.00 12,980.00        
701-05-I side drain pipe (24") 1,104      LNFT 85.00 93,840.00 60.00 66,240.00        
701-05-K side drain pipe (30") 542      LNFT 100.00 54,200.00 65.00 35,230.00        
701-05-M side drain pipe (36") 88      LNFT 125.00 11,000.00 75.00 6,600.00        
701-06-D side drain pipe arch (24" equiv.) 132      LNFT 90.00 11,880.00 70.00 9,240.00        
701-06-D-01 side drain pipe arch (24" equiv.)(class iv rcpa) 112      LNFT 110.00 12,320.00 90.00 10,080.00        
701-06-F side drain pipe arch (36" equiv.) 82      LNFT 160.00 13,120.00 80.00 6,560.00        
701-10-I reinforced concrete pipe (extension)(24") 266      LNFT 80.00 21,280.00 75.00 19,950.00        
701-10-K reinforced concrete pipe (extension)(30") 406      LNFT 95.00 38,570.00 85.00 34,510.00        
701-10-M reinforced concrete pipe (extension)(36") 212      LNFT 120.00 25,440.00 110.00 23,320.00        
701-15 concrete collar 9      EACH 1,000.00 9,000.00 700.00 6,300.00        
702-02-A manholes (mh-06) 12      EACH 6,300.00 75,600.00 3,500.00 42,000.00        
702-02-B manholes (r-cb-11) 13      EACH 5,200.00 67,600.00 3,200.00 41,600.00        
702-02-C manholes (r-cb-11 mod) 2      EACH 7,000.00 14,000.00 4,500.00 9,000.00        
702-03-A catch basins (cb-01) 13      EACH 2,800.00 36,400.00 2,800.00 36,400.00        
702-03-B catch basins (cb-02) 1      EACH 5,800.00 5,800.00 5,000.00 5,000.00        
702-07-A cross drain safety end (type 1) 19      EACH 2,800.00 53,200.00 1,800.00 34,200.00        
702-07-B cross drain safety end (type 2) 6      EACH 3,400.00 20,400.00 6,000.00 36,000.00        
702-08-A side drain safety end (type 1) 35      EACH 2,800.00 98,000.00 1,800.00 63,000.00        
702-08-B side drain safety end (type 2) 4      EACH 4,000.00 16,000.00 5,000.00 20,000.00        
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 50.0    LNFT 41.00 2,050.00 65.00 3,250.00        
704-03 blocked out guard rail 118.8    LNFT 20.00 2,376.00 20.00 2,376.00        
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
6.3    LNFT 110.00 693.00 85.00 535.50        
704-11-B guard rail end treatment (tangent) 1      EACH 3,100.00 3,100.00 3,500.00 3,500.00        
705-01 barbed wire fence 1,110      LNFT 6.50 7,215.00 6.00 6,660.00        
705-06-A chain link fence (4-foot height) 61      LNFT 22.00 1,342.00 20.00 1,220.00        
705-06-C chain link fence (6-foot height) 896      LNFT 20.00 17,920.00 17.00 15,232.00        
705-06-D chain link fence (7-foot height) 330      LNFT 26.00 8,580.00 23.00 7,590.00        
705-08-C-01 24-foot double gates for chain link fence (6-foot
height)
2      DBGT 1,200.00 2,400.00 1,100.00 2,200.00        
705-08-C-02 26-foot double gates for chain link fence (6-foot
height)
3      DBGT 1,300.00 3,900.00 1,200.00 3,600.00        
705-08-D 12-foot double gates for chain link fence (7-foot
height)
1      DBGT 1,600.00 1,600.00 1,500.00 1,500.00        
708-01 right-of-way monument 60      EACH 325.00 19,500.00 120.00 7,200.00        
708-02 right-of-way monument witness post 60      EACH 325.00 19,500.00 120.00 7,200.00        
713-01 temporary signs & barricades lump      LUMP 290,000.00 290,000.00 300,000.00 300,000.00        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
13.300  MILE 450.00 5,985.00 350.00 4,655.00        
713-03-B-01 temporary pvmt. markings (broken line)(4" w)(10' l)
(type i removable)
0.250  MILE 4,500.00 1,125.00 11,000.00 2,750.00        
713-04-A temporary pavement markings (solid line)(4" width) 37.500  MILE 900.00 33,750.00 500.00 18,750.00        
713-04-A-01 temporary pvmt. markings (solid line)(4" w)(type i
removable)
23.000  MILE 8,000.00 184,000.00 5,200.00 119,600.00        
713-05-D temporary pavement legends and symbols (rr crossing) 5      EACH 230.00 1,150.00 150.00 750.00        
713-06 temporary reflectorized raised pavement markers 1,050      EACH 6.00 6,300.00 6.00 6,300.00        
716-01-A mulch (vegetative) 160.0    TON 400.00 64,000.00 430.00 68,800.00        
717-01 seeding 4,100      LB 7.50 30,750.00 7.50 30,750.00        
718-01 fertilizer 91,000      LB 0.40 36,400.00 0.26 23,660.00        
720-01-A erosion control system, slope protection (type a) 10,723      SQYD 1.10 11,795.30 1.10 11,795.30        
720-01-C erosion control system, flexible channel liner (type c) 1,473      SQYD 1.80 2,651.40 2.00 2,946.00        
720-01-D erosion control system, flexible channel liner (type d) 1,324      SQYD 1.80 2,383.20 2.00 2,648.00        
722-02 project site laboratory (equipped) 1      EACH 75,000.00 75,000.00 30,000.00 30,000.00        
725-01 temporary detour roads 2,841.2    SQYD 86.00 244,343.20 100.00 284,120.00        
726-01-A bedding material (stone or recycled pccp) 2,669.1    CUYD 70.00 186,837.00 85.00 226,873.50        
727-01 mobilization lump      LUMP 1,950,000.00 1,950,000.00 2,000,000.00 2,000,000.00        
729-16-C object marker assembly (type 3) 2      EACH 115.00 230.00 75.00 150.00        
731-02 reflectorized raised pavement markers 2,494      EACH 6.00 14,964.00 6.50 16,211.00        
732-01-A-04 plastic pavement striping (4" width)(dashed line)(2'
stripe, 4' gap)
257      LNFT 0.90 231.30 6.50 1,670.50        
732-01-C plastic pavement striping (8" width) 3,429      LNFT 1.10 3,771.90 5.50 18,859.50        
732-01-E plastic pavement striping (24" width) 907      LNFT 3.50 3,174.50 8.50 7,709.50        
732-02-A plastic pavement striping (solid line) (4" width) 28.654  MILE 3,000.00 85,962.00 3,000.00 85,962.00        
732-04-A plastic pavement legends & symbols (arrow) 18      EACH 200.00 3,600.00 400.00 7,200.00        
732-04-C plastic pavement legends & symbols (only) 18      EACH 230.00 4,140.00 400.00 7,200.00        
732-04-D plastic pavement legends & symbols (rr crossing) 5      EACH 500.00 2,500.00 800.00 4,000.00        
732-05 removal of existing markings 6.785  MILE 6,500.00 44,102.50 4,500.00 30,532.50        
735-01 mailboxes 3      EACH 10.00 30.00 10.00 30.00        
735-02 mailbox supports (single) 3      EACH 200.00 600.00 150.00 450.00        
740-01 construction layout lump      LUMP 350,000.00 350,000.00 300,000.00 300,000.00        
805-01-A class a concrete (pipe headwalls) 5.92   CUYD 1,800.00 10,656.00 1,600.00 9,472.00        
805-01-B class a concrete (box culvert headwalls) 3.33   CUYD 1,800.00 5,994.00 2,000.00 6,660.00        
805-12-Y-01 reinforced concrete box culverts (3' x 2')(extension) 18.0    LNFT 1,700.00 30,600.00 700.00 12,600.00        
805-12-Z-01 reinforced concrete box culverts (4' x 2')(extension) 224.0    LNFT 360.00 80,640.00 400.00 89,600.00        
805-12-Z-02 reinforced concrete box culverts (5' x 2')(extension) 16.0    LNFT 2,000.00 32,000.00 800.00 12,800.00        
806-01 deformed reinforcing steel 538      LB 2.10 1,129.80 2.00 1,076.00        
S-001 rumble strips (ground-in) 12.1    MILE 450.00 5,445.00 700.00 8,470.00        
S-002 reconstruction of rail spur 548.03   LNFT 230.00 126,046.90 250.00 137,007.50        
S-003 rail spur roadway crossing 219.38   LNFT 170.00 37,294.60 600.00 131,628.00        
S-004 removal of 015-08-0028 temporary connection (sta.
322+32.26 to sta. 334+61.62)
lump      LUMP 10,000.00 10,000.00 16,000.00 16,000.00        
 SUBTOTAL GENERAL       12,841,553.58   13,713,894.40        
                       
ALTERNATE A pavement options                    
                       
ALTERNATE A1 portland cement concrete pavement                    
203-04-A-01 nonplastic embankment (stone)(shoulder drain) 66      CUYD 0.00 0.00 0.00 0.00        
302-02-A-01 class ii base course (4" thick)(stone or recycled pccp) 140,559.0    SQYD 0.00 0.00 0.00 0.00        
302-02-B-01 class ii base course (6" thick)(stone or recycled pccp) 34,885.1    SQYD 0.00 0.00 0.00 0.00        
302-02-H-01 class ii base course (thickness varies 8" - 10")(stone
or recycled pccp)
18,432.6    SQYD 0.00 0.00 0.00 0.00        
502-01 superpave asphaltic concrete 5,027.2    TON 0.00 0.00 0.00 0.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,648.6    TON 0.00 0.00 0.00 0.00        
601-01-G portland cement concrete pavement (8" thick) 107,486.9    SQYD 0.00 0.00 0.00 0.00        
601-02-G portland cement concrete pavement (8" thick)
(crossovers & turnouts)
27,085.1    SQYD 0.00 0.00 0.00 0.00        
601-04 portland cement concrete pavement coring 225      EACH 0.00 0.00 0.00 0.00        
732-03-A plastic pavement striping (broken line)(4" width) 5.961  MILE 0.00 0.00 0.00 0.00        
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape (type)
7.295  MILE 0.00 0.00 0.00 0.00        
S-005 pavement grooving 7,628.9    SQYD 0.00 0.00 0.00 0.00        
                       
ALTERNATE A2 superpave asphaltic concrete pavement                    
203-04-A-01 nonplastic embankment (stone)(shoulder drain) 41      CUYD 130.00 5,330.00 250.00 10,250.00        
302-02-A-01 class ii base course (4" thick)(stone or recycled pccp) 175,444.1    SQYD 9.55 1,675,491.16 11.80 2,070,240.38        
302-02-G-01 class ii base course (thickness varies 6" - 8")(stone
or recycled pccp)
18,432.6    SQYD 17.75 327,178.65 21.00 387,084.60        
502-01 superpave asphaltic concrete 40,711.8    TON 91.00 3,704,773.80 85.00 3,460,503.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
10,371.0    TON 122.00 1,265,262.00 110.00 1,140,810.00        
732-03-A plastic pavement striping (broken line)(4" width) 12.700  MILE 930.00 11,811.00 2,000.00 25,400.00        
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v)
0.556  MILE 4,500.00 2,502.00 11,000.00 6,116.00        
S-006 open graded friction course system (low volume traffic
application)
420      TON 140.00 58,800.00 400.00 168,000.00        
 SUBTOTAL ALT A2       7,051,148.61   7,268,403.98        
                       
 ITEM TOTAL (CONSTRUCTION BID)       19,892,702.19   20,982,298.38        
 NUMBER OF DAYS BID AT $4,600 PER DAY.       2,875,000.00   2,875,000.00        
 LIFE CYCLE COST       1,690,600.00   1,690,600.00        
 TOTAL BID       24,458,302.19   25,547,898.38        