| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - HUEY STOCKSTILL, INC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
392   |
LNFT |
6.00 |
2,352.00 |
10.00 |
3,920.00 |
|
|
|
|
| 203-04 |
nonplastic embankment
|
2   |
CUYD |
120.00 |
240.00 |
400.00 |
800.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
575   |
CUYD |
10.00 |
5,750.00 |
10.00 |
5,750.00 |
|
|
|
|
| 203-08 |
geotextile fabric
|
6   |
SQYD |
5.00 |
30.00 |
500.00 |
3,000.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
643   |
CUYD |
40.00 |
25,720.00 |
70.00 |
45,010.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
9,546.2 |
TON |
58.00 |
553,679.60 |
71.00 |
677,780.20 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
993.3 |
TON |
30.00 |
29,799.00 |
71.00 |
70,524.30 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
47,377   |
SQYD |
0.50 |
23,688.50 |
1.00 |
47,377.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,632   |
CUYD |
20.00 |
- 52,640.00 |
0.10 |
- 263.20 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
7,400   |
SQYD |
58.00 |
429,200.00 |
50.00 |
370,000.00 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp)
|
8   |
LNFT |
120.00 |
960.00 |
250.00 |
2,000.00 |
|
|
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
1,200.00 |
1,200.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
62.5 |
LNFT |
50.00 |
3,125.00 |
48.00 |
3,000.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
150.0 |
LNFT |
45.00 |
6,750.00 |
41.00 |
6,150.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
75.0 |
LNFT |
20.00 |
1,500.00 |
21.00 |
1,575.00 |
|
|
|
|
| 704-05 |
guard rail anchor sections (bct)
|
12.5 |
LNFT |
80.00 |
1,000.00 |
80.00 |
1,000.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,500.00 |
5,000.00 |
2,100.00 |
4,200.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
45,000.00 |
45,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
210   |
LNFT |
1.00 |
210.00 |
0.10 |
21.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
7.050 |
MILE |
300.00 |
2,115.00 |
100.00 |
705.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.150 |
MILE |
300.00 |
1,845.00 |
0.10 |
0.62 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
18.360 |
MILE |
10.00 |
183.60 |
0.10 |
1.84 |
|
|
|
|
| 726-01 |
bedding material
|
3.0 |
CUYD |
100.00 |
300.00 |
100.00 |
300.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
123,000.00 |
123,000.00 |
140,000.00 |
140,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
80.00 |
320.00 |
85.00 |
340.00 |
|
|
|
|
| 729-19-C |
dead end road installations(type c)
|
3   |
EACH |
650.00 |
1,950.00 |
1,500.00 |
4,500.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
494   |
EACH |
5.00 |
2,470.00 |
5.50 |
2,717.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
70   |
LNFT |
6.00 |
420.00 |
3.00 |
210.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.120 |
MILE |
1,000.00 |
6,120.00 |
2,700.00 |
16,524.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.050 |
MILE |
800.00 |
1,640.00 |
800.00 |
1,640.00 |
|
|
|
|
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
1   |
EACH |
1,000.00 |
1,000.00 |
550.00 |
550.00 |
|
|
|
|
| 735-01 |
mailboxes
|
12   |
EACH |
1.00 |
12.00 |
1.00 |
12.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
12   |
EACH |
140.00 |
1,680.00 |
150.00 |
1,800.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| S-101 |
special anchor section
|
1   |
EACH |
900.00 |
900.00 |
900.00 |
900.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,236,519.70 |
|
1,437,044.76 |
|
|
|
|
|