Letting of 6/27/2007 LA DOTD Headquarters


REBID
go back
Go Back
DBE GOAL FED
Lead Project: 744-40-0015
Parish: RAPIDES
Routes:
Description: PINEVILLE OLD TOWN TRAIL SYSTEM
Type Const: grading, drainage structures, class ii base course,superpave asphaltic concrete
paving, portland cement concrete paving, landscaping, lighting, irrigation, and related work
Estimated Construction Cost: $868,377.40
 
RankLicenseBidderConstruction Bid
1 32044 QUALITY DESIGN & CONSTRUCTION, INC. $951,681.18
2 30774 PROGRESSIVE CONSTRUCTION CO., INC. $1,124,697.80
3 00568 MERRICK CONSTRUCTION CO. $1,206,815.40
 
Item Number Item Description Quantity Unit of Measure - 1 -
QUALITY DESIGN & CONSTRUCTION, INC.
- 2 -
PROGRESSIVE CONSTRUCTION CO., INC.
- 3 -
MERRICK CONSTRUCTION CO.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 6,100.00 6,100.00 30,000.00 30,000.00 89,000.00 89,000.00    
203-06 excavation & embankment lump      LUMP 138,172.00 138,172.00 185,000.00 185,000.00 200,000.00 200,000.00    
204-02 temporary hay or straw bales 100      EACH 14.00 1,400.00 25.00 2,500.00 3.00 300.00    
204-05-A temporary sediment check dams (hay) 2      EACH 190.00 380.00 250.00 500.00 15.00 30.00    
204-06 temporary silt fencing 1,000      LNFT 2.00 2,000.00 6.00 6,000.00 0.25 250.00    
302-01-A class ii base course (crushed stone) 565.6    CUYD 103.00 58,256.80 100.00 56,560.00 210.00 118,776.00    
502-01 superpave asphaltic concrete 471.1    TON 169.00 79,615.90 140.00 65,954.00 125.00 58,887.50    
701-01-I cross drain pipe (24" pcp) 60      LNFT 66.00 3,960.00 90.00 5,400.00 50.00 3,000.00    
702-03-A catch basins (cb-01) 1      EACH 4,100.00 4,100.00 4,500.00 4,500.00 10,000.00 10,000.00    
706-01-B concrete walk (5" thick) 152.3    SQYD 34.00 5,178.20 81.00 12,336.30 35.00 5,330.50    
707-03 combination concrete curb and gutter 45.2    LNFT 26.00 1,175.20 25.00 1,130.00 35.00 1,582.00    
711-02-D riprap (55 lb) 20      CUYD 82.20 1,644.00 100.00 2,000.00 100.00 2,000.00    
711-04 geotextile fabric 45      SQYD 15.00 675.00 4.00 180.00 5.00 225.00    
713-01 temporary signs & barricades lump      LUMP 24,200.00 24,200.00 20,000.00 20,000.00 50,000.00 50,000.00    
714-01-A slab sodding (common bermuda) 495      SQYD 2.80 1,386.00 10.00 4,950.00 5.00 2,475.00    
717-01 seeding 112      LB 10.50 1,176.00 15.00 1,680.00 6.00 672.00    
718-01 fertilizer 1,470      LB 3.20 4,704.00 2.00 2,940.00 0.80 1,176.00    
720-01-B erosion control system, slope protection (type b) 6,239      SQYD 2.30 14,349.70 2.00 12,478.00 0.60 3,743.40    
727-01 mobilization lump      LUMP 28,380.00 28,380.00 45,000.00 45,000.00 120,000.00 120,000.00    
729-01 sign (type a) 124.7    SQFT 18.40 2,294.48 30.00 3,741.00 15.00 1,870.50    
729-21 u-channel post 25      EACH 90.00 2,250.00 100.00 2,500.00 56.00 1,400.00    
730-01 trenching and backfilling 3,285      LNFT 3.60 11,826.00 4.50 14,782.50 3.00 9,855.00    
730-02-A conduit with conductors (3 #10 - 3/4" c) 250      LNFT 5.20 1,300.00 3.50 875.00 4.00 1,000.00    
730-02-B conduit with conductors (2 #8 & 1 #10 - 3/4" c) 180      LNFT 8.60 1,548.00 4.00 720.00 8.00 1,440.00    
730-02-C conduit with conductors (2 #6 & 1 #10 - 1" c) 1,090      LNFT 6.20 6,758.00 4.50 4,905.00 6.00 6,540.00    
730-02-D conduit with conductors (3 #6 - 1" c) 110      LNFT 8.10 891.00 4.50 495.00 8.00 880.00    
730-02-E conduit with conductors (4 #6 & 1 #10 - 1 1/4" c) 1,400      LNFT 8.60 12,040.00 5.00 7,000.00 9.00 12,600.00    
730-02-F conduit with conductors (3 #3/o & 1 #6 - 2 1/2" c) 565      LNFT 29.10 16,441.50 25.00 14,125.00 26.50 14,972.50    
730-04-A jacked or bored casing (6" sch 80 pvc) 374      LNFT 28.10 10,509.40 27.00 10,098.00 32.00 11,968.00    
730-06-A high mast pole (60 ft., painted steel) 5      EACH 70,560.00 352,800.00 90,000.00 450,000.00 67,000.00 335,000.00    
730-07-A luminaire (f1) 10      EACH 1,430.00 14,300.00 2,500.00 25,000.00 1,400.00 14,000.00    
730-07-B luminaire (f2) 6      EACH 680.00 4,080.00 1,000.00 6,000.00 825.00 4,950.00    
730-07-C luminaire (f3) 3      EACH 1,000.00 3,000.00 1,500.00 4,500.00 1,500.00 4,500.00    
730-08-A electrical service point (high mast) 1      EACH 8,160.00 8,160.00 11,000.00 11,000.00 11,300.00 11,300.00    
730-08-B electrical service point (panel "p") 1      EACH 5,410.00 5,410.00 4,500.00 4,500.00 4,200.00 4,200.00    
730-08-C electrical service point ("lca" & "lcb") 2      EACH 3,060.00 6,120.00 4,000.00 8,000.00 1,400.00 2,800.00    
730-08-D electrical service point ("lcc") 1      EACH 3,060.00 3,060.00 3,000.00 3,000.00 1,500.00 1,500.00    
732-01-B plastic pavement striping (6" width) 50      LNFT 45.00 2,250.00 2.00 100.00 13.00 650.00    
732-01-D plastic pavement striping (12" width) 72      LNFT 45.00 3,240.00 3.00 216.00 26.00 1,872.00    
738-01 mulch sodding 1,040      CUYD 21.30 22,152.00 6.00 6,240.00 13.00 13,520.00    
S-001 adaag detectable warning (truncated dome pavers) 14      SQYD 210.00 2,940.00 180.00 2,520.00 100.00 1,400.00    
S-002 park benches 2      EACH 1,590.00 3,180.00 1,200.00 2,400.00 1,200.00 2,400.00    
S-003 trash receptacles 1      EACH 1,150.00 1,150.00 600.00 600.00 1,000.00 1,000.00    
S-004 removable bollards 5      EACH 1,220.00 6,100.00 1,500.00 7,500.00 2,000.00 10,000.00    
S-005 flag pole (50') black anodized 1      EACH 5,734.00 5,734.00 7,500.00 7,500.00 6,000.00 6,000.00    
S-006 flag pole (40') black anodized (non-participating) 2      EACH 4,199.00 8,398.00 5,000.00 10,000.00 4,500.00 9,000.00    
S-007 trailhead signage 1      EACH 3,152.00 3,152.00 3,500.00 3,500.00 2,350.00 2,350.00    
S-009 colored concrete paving (5" thick) 464      SQYD 96.00 44,544.00 98.00 45,472.00 100.00 46,400.00    
S-012 landscape earthwork 200      CUYD 25.00 5,000.00 19.00 3,800.00 0.00 0.00    
S-014 portable drive unit (480 volt) 1      EACH 4,200.00 4,200.00 4,500.00 4,500.00 4,000.00 4,000.00    
                       
 CONTRACTOR TOTAL       951,681.18   1,124,697.80   1,206,815.40    