| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - QUALITY DESIGN & CONSTRUCTION, INC. |
- 2 - PROGRESSIVE CONSTRUCTION CO., INC. |
- 3 - MERRICK CONSTRUCTION CO. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
6,100.00 |
6,100.00 |
30,000.00 |
30,000.00 |
89,000.00 |
89,000.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
138,172.00 |
138,172.00 |
185,000.00 |
185,000.00 |
200,000.00 |
200,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
100   |
EACH |
14.00 |
1,400.00 |
25.00 |
2,500.00 |
3.00 |
300.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
2   |
EACH |
190.00 |
380.00 |
250.00 |
500.00 |
15.00 |
30.00 |
|
|
| 204-06 |
temporary silt fencing
|
1,000   |
LNFT |
2.00 |
2,000.00 |
6.00 |
6,000.00 |
0.25 |
250.00 |
|
|
| 302-01-A |
class ii base course (crushed stone)
|
565.6 |
CUYD |
103.00 |
58,256.80 |
100.00 |
56,560.00 |
210.00 |
118,776.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
471.1 |
TON |
169.00 |
79,615.90 |
140.00 |
65,954.00 |
125.00 |
58,887.50 |
|
|
| 701-01-I |
cross drain pipe (24" pcp)
|
60   |
LNFT |
66.00 |
3,960.00 |
90.00 |
5,400.00 |
50.00 |
3,000.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
4,100.00 |
4,100.00 |
4,500.00 |
4,500.00 |
10,000.00 |
10,000.00 |
|
|
| 706-01-B |
concrete walk (5" thick)
|
152.3 |
SQYD |
34.00 |
5,178.20 |
81.00 |
12,336.30 |
35.00 |
5,330.50 |
|
|
| 707-03 |
combination concrete curb and gutter
|
45.2 |
LNFT |
26.00 |
1,175.20 |
25.00 |
1,130.00 |
35.00 |
1,582.00 |
|
|
| 711-02-D |
riprap (55 lb)
|
20   |
CUYD |
82.20 |
1,644.00 |
100.00 |
2,000.00 |
100.00 |
2,000.00 |
|
|
| 711-04 |
geotextile fabric
|
45   |
SQYD |
15.00 |
675.00 |
4.00 |
180.00 |
5.00 |
225.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
24,200.00 |
24,200.00 |
20,000.00 |
20,000.00 |
50,000.00 |
50,000.00 |
|
|
| 714-01-A |
slab sodding (common bermuda)
|
495   |
SQYD |
2.80 |
1,386.00 |
10.00 |
4,950.00 |
5.00 |
2,475.00 |
|
|
| 717-01 |
seeding
|
112   |
LB |
10.50 |
1,176.00 |
15.00 |
1,680.00 |
6.00 |
672.00 |
|
|
| 718-01 |
fertilizer
|
1,470   |
LB |
3.20 |
4,704.00 |
2.00 |
2,940.00 |
0.80 |
1,176.00 |
|
|
| 720-01-B |
erosion control system, slope protection (type b)
|
6,239   |
SQYD |
2.30 |
14,349.70 |
2.00 |
12,478.00 |
0.60 |
3,743.40 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
28,380.00 |
28,380.00 |
45,000.00 |
45,000.00 |
120,000.00 |
120,000.00 |
|
|
| 729-01 |
sign (type a)
|
124.7 |
SQFT |
18.40 |
2,294.48 |
30.00 |
3,741.00 |
15.00 |
1,870.50 |
|
|
| 729-21 |
u-channel post
|
25   |
EACH |
90.00 |
2,250.00 |
100.00 |
2,500.00 |
56.00 |
1,400.00 |
|
|
| 730-01 |
trenching and backfilling
|
3,285   |
LNFT |
3.60 |
11,826.00 |
4.50 |
14,782.50 |
3.00 |
9,855.00 |
|
|
| 730-02-A |
conduit with conductors (3 #10 - 3/4" c)
|
250   |
LNFT |
5.20 |
1,300.00 |
3.50 |
875.00 |
4.00 |
1,000.00 |
|
|
| 730-02-B |
conduit with conductors (2 #8 & 1 #10 - 3/4" c)
|
180   |
LNFT |
8.60 |
1,548.00 |
4.00 |
720.00 |
8.00 |
1,440.00 |
|
|
| 730-02-C |
conduit with conductors (2 #6 & 1 #10 - 1" c)
|
1,090   |
LNFT |
6.20 |
6,758.00 |
4.50 |
4,905.00 |
6.00 |
6,540.00 |
|
|
| 730-02-D |
conduit with conductors (3 #6 - 1" c)
|
110   |
LNFT |
8.10 |
891.00 |
4.50 |
495.00 |
8.00 |
880.00 |
|
|
| 730-02-E |
conduit with conductors (4 #6 & 1 #10 - 1 1/4" c)
|
1,400   |
LNFT |
8.60 |
12,040.00 |
5.00 |
7,000.00 |
9.00 |
12,600.00 |
|
|
| 730-02-F |
conduit with conductors (3 #3/o & 1 #6 - 2 1/2" c)
|
565   |
LNFT |
29.10 |
16,441.50 |
25.00 |
14,125.00 |
26.50 |
14,972.50 |
|
|
| 730-04-A |
jacked or bored casing (6" sch 80 pvc)
|
374   |
LNFT |
28.10 |
10,509.40 |
27.00 |
10,098.00 |
32.00 |
11,968.00 |
|
|
| 730-06-A |
high mast pole (60 ft., painted steel)
|
5   |
EACH |
70,560.00 |
352,800.00 |
90,000.00 |
450,000.00 |
67,000.00 |
335,000.00 |
|
|
| 730-07-A |
luminaire (f1)
|
10   |
EACH |
1,430.00 |
14,300.00 |
2,500.00 |
25,000.00 |
1,400.00 |
14,000.00 |
|
|
| 730-07-B |
luminaire (f2)
|
6   |
EACH |
680.00 |
4,080.00 |
1,000.00 |
6,000.00 |
825.00 |
4,950.00 |
|
|
| 730-07-C |
luminaire (f3)
|
3   |
EACH |
1,000.00 |
3,000.00 |
1,500.00 |
4,500.00 |
1,500.00 |
4,500.00 |
|
|
| 730-08-A |
electrical service point (high mast)
|
1   |
EACH |
8,160.00 |
8,160.00 |
11,000.00 |
11,000.00 |
11,300.00 |
11,300.00 |
|
|
| 730-08-B |
electrical service point (panel "p")
|
1   |
EACH |
5,410.00 |
5,410.00 |
4,500.00 |
4,500.00 |
4,200.00 |
4,200.00 |
|
|
| 730-08-C |
electrical service point ("lca" & "lcb")
|
2   |
EACH |
3,060.00 |
6,120.00 |
4,000.00 |
8,000.00 |
1,400.00 |
2,800.00 |
|
|
| 730-08-D |
electrical service point ("lcc")
|
1   |
EACH |
3,060.00 |
3,060.00 |
3,000.00 |
3,000.00 |
1,500.00 |
1,500.00 |
|
|
| 732-01-B |
plastic pavement striping (6" width)
|
50   |
LNFT |
45.00 |
2,250.00 |
2.00 |
100.00 |
13.00 |
650.00 |
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
72   |
LNFT |
45.00 |
3,240.00 |
3.00 |
216.00 |
26.00 |
1,872.00 |
|
|
| 738-01 |
mulch sodding
|
1,040   |
CUYD |
21.30 |
22,152.00 |
6.00 |
6,240.00 |
13.00 |
13,520.00 |
|
|
| S-001 |
adaag detectable warning (truncated dome pavers)
|
14   |
SQYD |
210.00 |
2,940.00 |
180.00 |
2,520.00 |
100.00 |
1,400.00 |
|
|
| S-002 |
park benches
|
2   |
EACH |
1,590.00 |
3,180.00 |
1,200.00 |
2,400.00 |
1,200.00 |
2,400.00 |
|
|
| S-003 |
trash receptacles
|
1   |
EACH |
1,150.00 |
1,150.00 |
600.00 |
600.00 |
1,000.00 |
1,000.00 |
|
|
| S-004 |
removable bollards
|
5   |
EACH |
1,220.00 |
6,100.00 |
1,500.00 |
7,500.00 |
2,000.00 |
10,000.00 |
|
|
| S-005 |
flag pole (50') black anodized
|
1   |
EACH |
5,734.00 |
5,734.00 |
7,500.00 |
7,500.00 |
6,000.00 |
6,000.00 |
|
|
| S-006 |
flag pole (40') black anodized (non-participating)
|
2   |
EACH |
4,199.00 |
8,398.00 |
5,000.00 |
10,000.00 |
4,500.00 |
9,000.00 |
|
|
| S-007 |
trailhead signage
|
1   |
EACH |
3,152.00 |
3,152.00 |
3,500.00 |
3,500.00 |
2,350.00 |
2,350.00 |
|
|
| S-009 |
colored concrete paving (5" thick)
|
464   |
SQYD |
96.00 |
44,544.00 |
98.00 |
45,472.00 |
100.00 |
46,400.00 |
|
|
| S-012 |
landscape earthwork
|
200   |
CUYD |
25.00 |
5,000.00 |
19.00 |
3,800.00 |
0.00 |
0.00 |
|
|
| S-014 |
portable drive unit (480 volt)
|
1   |
EACH |
4,200.00 |
4,200.00 |
4,500.00 |
4,500.00 |
4,000.00 |
4,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
951,681.18 |
|
1,124,697.80 |
|
1,206,815.40 |
|
|
|