Letting of 6/27/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 744-36-0004
Parish: ORLEANS
Routes:
Description: WISNER BOULEVARD BICYCLE/PEDESTRIAN PATH
Type Const: grading, drainage structures, portland cement concrete pavement, and related work
Estimated Construction Cost: $1,418,067.00
 
RankLicenseBidderConstruction Bid
1 40871 MDI CONSTRUCTION LLC $1,379,821.24
2 40038 COMMAND CONSTRUCTION LLC $1,557,139.20
3 24901 HARD ROCK CONSTRUCTION CO. $1,821,696.92
4 45210 CERES ENVIRONMENTAL SERVICES,INC. $2,025,192.10
5 02179 BOH BROS. CONSTRUCTION CO., LLC. $2,058,088.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
MDI CONSTRUCTION LLC
- 2 -
COMMAND CONSTRUCTION LLC
- 3 -
HARD ROCK CONSTRUCTION CO.
- 4 -
CERES ENVIRONMENTAL SERVICES,INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 18,000.00 18,000.00 100,000.00 100,000.00 15,000.00 15,000.00 12,000.00 12,000.00
202-02-C removal of portland cement concrete pavement 425      SQYD 27.00 11,475.00 20.00 8,500.00 24.00 10,200.00 10.00 4,250.00
202-02-E removal of concrete curbs 525.0    LNFT 5.00 2,625.00 20.00 10,500.00 9.00 4,725.00 5.00 2,625.00
202-02-I removal of asphalt pavement 55      SQYD 45.00 2,475.00 20.00 1,100.00 30.00 1,650.00 10.00 550.00
203-06 excavation & embankment lump      LUMP 18,000.00 18,000.00 100,000.00 100,000.00 90,000.00 90,000.00 27,600.00 27,600.00
203-08 borrow (vehicular measurement) 150      CUYD 25.00 3,750.00 70.00 10,500.00 30.00 4,500.00 36.00 5,400.00
702-04-A adjusting manholes 1      EACH 1,800.00 1,800.00 650.00 650.00 600.00 600.00 850.00 850.00
707-01 concrete curb (6") 955.0    LNFT 15.00 14,325.00 20.00 19,100.00 15.00 14,325.00 5.50 5,252.50
713-01 temporary signs & barricades lump      LUMP 9,004.64 9,004.64 20,000.00 20,000.00 15,000.00 15,000.00 9,000.00 9,000.00
714-01 slab sodding (st. augustine) 7,150      SQYD 4.64 33,176.00 5.00 35,750.00 9.00 64,350.00 7.60 54,340.00
715-01 topsoil 825      CUYD 27.32 22,539.00 15.00 12,375.00 22.00 18,150.00 31.00 25,575.00
717-01 seeding 200      LB 12.00 2,400.00 8.00 1,600.00 20.00 4,000.00 24.00 4,800.00
718-01 fertilizer 400      LB 2.18 872.00 10.00 4,000.00 5.00 2,000.00 6.00 2,400.00
719-01-A plants (bald cypress, taxodium distichum, 3 1/2"-4"
cal, 65 gal, 12'-14' ht)
20      EACH 437.00 8,740.00 300.00 6,000.00 345.00 6,900.00 440.00 8,800.00
719-01-B plants (knockout rose, rosa knockout, 7 gal, 24"x24"
min, full)
14      EACH 71.00 994.00 30.00 420.00 75.00 1,050.00 110.00 1,540.00
727-01 mobilization lump      LUMP 96,898.00 96,898.00 160,000.00 160,000.00 150,000.00 150,000.00 250,000.00 250,000.00
729-01 sign (type a) 594.6    SQFT 16.00 9,513.60 17.00 10,108.20 20.00 11,892.00 24.00 14,270.40
729-21 u-channel post 76      EACH 121.00 9,196.00 90.00 6,840.00 95.00 7,220.00 135.00 10,260.00
732-01-A plastic pavement striping (4" width) 412      LNFT 1.00 412.00 0.50 206.00 0.46 189.52 0.60 247.20
732-01-E plastic pavement striping (24" width) 1,056      LNFT 4.00 4,224.00 4.00 4,224.00 3.40 3,590.40 4.75 5,016.00
732-04-A plastic pavement legends & symbols (arrow) 1      EACH 215.00 215.00 250.00 250.00 195.00 195.00 235.00 235.00
732-04-F plastic pavement legends & symbols (bike route symbol) 23      EACH 273.00 6,279.00 275.00 6,325.00 250.00 5,750.00 442.00 10,166.00
732-04-G plastic pavement legends & symbols (separate bike
symbol)
4      EACH 219.00 876.00 225.00 900.00 200.00 800.00 382.00 1,528.00
732-04-H plastic pavement legends & symbols (crossing with bike
symbol)
4      EACH 295.00 1,180.00 300.00 1,200.00 270.00 1,080.00 462.00 1,848.00
740-01 construction layout lump      LUMP 9,000.00 9,000.00 20,000.00 20,000.00 30,000.00 30,000.00 71,500.00 71,500.00
S-001 replacement drainage grates 128      LNFT 60.00 7,680.00 100.00 12,800.00 135.00 17,280.00 195.00 24,960.00
S-002 drainage piping 2,090      LNFT 18.00 37,620.00 20.00 41,800.00 23.00 48,070.00 103.00 215,270.00
S-003-A sawcutting existing concrete curb (full depth) 28      LNFT 21.00 588.00 25.00 700.00 9.00 252.00 36.00 1,008.00
S-003-B sawcutting existing pavement (full depth) 625      LNFT 10.00 6,250.00 25.00 15,625.00 8.00 5,000.00 36.00 22,500.00
S-004 colored concrete banding 1,420      LNFT 17.00 24,140.00 30.00 42,600.00 63.00 89,460.00 11.00 15,620.00
S-005 colored concrete paving 4,101      SQFT 13.00 53,313.00 11.00 45,111.00 24.00 98,424.00 11.00 45,111.00
S-006 shared use path concrete paving 44,486      SQFT 8.00 355,888.00 7.00 311,402.00 9.00 400,374.00 10.00 444,860.00
S-007 special condition concrete paving under existing trees 50,430      SQFT 8.20 413,526.00 7.10 358,053.00 9.00 453,870.00 10.00 504,300.00
S-008 steel bollard system lump      LUMP 88,560.00 88,560.00 100,000.00 100,000.00 105,000.00 105,000.00 24,000.00 24,000.00
S-009 decorative sign posts 40      EACH 385.00 15,400.00 300.00 12,000.00 500.00 20,000.00 420.00 16,800.00
S-010 bike rack 1      EACH 1,500.00 1,500.00 1,500.00 1,500.00 1,200.00 1,200.00 2,800.00 2,800.00
S-011 kiosk 3      EACH 13,700.00 41,100.00 15,000.00 45,000.00 15,000.00 45,000.00 14,000.00 42,000.00
S-012 renovation of existing benches 4      EACH 500.00 2,000.00 750.00 3,000.00 450.00 1,800.00 750.00 3,000.00
S-013 existing tree pruning and arborist work lump      LUMP 35,567.00 35,567.00 25,000.00 25,000.00 64,800.00 64,800.00 125,150.00 125,150.00
S-014 mulch 80.0    CUYD 109.00 8,720.00 25.00 2,000.00 100.00 8,000.00 97.00 7,760.00
                       
 CONTRACTOR TOTAL       1,379,821.24   1,557,139.20   1,821,696.92   2,025,192.10
 
Item Number Item Description Quantity Unit of Measure - 5 -
BOH BROS. CONSTRUCTION CO., LLC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 20,000.00 20,000.00            
202-02-C removal of portland cement concrete pavement 425      SQYD 15.00 6,375.00            
202-02-E removal of concrete curbs 525.0    LNFT 8.00 4,200.00            
202-02-I removal of asphalt pavement 55      SQYD 30.00 1,650.00            
203-06 excavation & embankment lump      LUMP 40,000.00 40,000.00            
203-08 borrow (vehicular measurement) 150      CUYD 20.00 3,000.00            
702-04-A adjusting manholes 1      EACH 1,000.00 1,000.00            
707-01 concrete curb (6") 955.0    LNFT 20.00 19,100.00            
713-01 temporary signs & barricades lump      LUMP 15,000.00 15,000.00            
714-01 slab sodding (st. augustine) 7,150      SQYD 5.00 35,750.00            
715-01 topsoil 825      CUYD 25.00 20,625.00            
717-01 seeding 200      LB 3.00 600.00            
718-01 fertilizer 400      LB 1.00 400.00            
719-01-A plants (bald cypress, taxodium distichum, 3 1/2"-4"
cal, 65 gal, 12'-14' ht)
20      EACH 300.00 6,000.00            
719-01-B plants (knockout rose, rosa knockout, 7 gal, 24"x24"
min, full)
14      EACH 25.00 350.00            
727-01 mobilization lump      LUMP 155,000.00 155,000.00            
729-01 sign (type a) 594.6    SQFT 15.00 8,919.00            
729-21 u-channel post 76      EACH 125.00 9,500.00            
732-01-A plastic pavement striping (4" width) 412      LNFT 0.50 206.00            
732-01-E plastic pavement striping (24" width) 1,056      LNFT 4.00 4,224.00            
732-04-A plastic pavement legends & symbols (arrow) 1      EACH 200.00 200.00            
732-04-F plastic pavement legends & symbols (bike route symbol) 23      EACH 200.00 4,600.00            
732-04-G plastic pavement legends & symbols (separate bike
symbol)
4      EACH 200.00 800.00            
732-04-H plastic pavement legends & symbols (crossing with bike
symbol)
4      EACH 300.00 1,200.00            
740-01 construction layout lump      LUMP 30,000.00 30,000.00            
S-001 replacement drainage grates 128      LNFT 150.00 19,200.00            
S-002 drainage piping 2,090      LNFT 40.00 83,600.00            
S-003-A sawcutting existing concrete curb (full depth) 28      LNFT 25.00 700.00            
S-003-B sawcutting existing pavement (full depth) 625      LNFT 15.00 9,375.00            
S-004 colored concrete banding 1,420      LNFT 35.00 49,700.00            
S-005 colored concrete paving 4,101      SQFT 22.00 90,222.00            
S-006 shared use path concrete paving 44,486      SQFT 12.00 533,832.00            
S-007 special condition concrete paving under existing trees 50,430      SQFT 12.00 605,160.00            
S-008 steel bollard system lump      LUMP 120,000.00 120,000.00            
S-009 decorative sign posts 40      EACH 400.00 16,000.00            
S-010 bike rack 1      EACH 5,000.00 5,000.00            
S-011 kiosk 3      EACH 20,000.00 60,000.00            
S-012 renovation of existing benches 4      EACH 2,000.00 8,000.00            
S-013 existing tree pruning and arborist work lump      LUMP 65,000.00 65,000.00            
S-014 mulch 80.0    CUYD 45.00 3,600.00            
                       
 CONTRACTOR TOTAL       2,058,088.00            