| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - FORBY CONTRACTING, INC. |
- 2 - BESSETTE DEVELOPMENT CORP. |
- 3 - CARLTON CONSTRUCTION CO. INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
2,500.00 |
2,500.00 |
11,500.00 |
11,500.00 |
5,370.00 |
5,370.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
2,500.00 |
2,500.00 |
9,500.00 |
9,500.00 |
1,128.00 |
1,128.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
12,000.00 |
12,000.00 |
41,500.00 |
41,500.00 |
4,342.00 |
4,342.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
15   |
CUYD |
100.00 |
1,500.00 |
165.00 |
2,475.00 |
4,454.00 |
66,810.00 |
|
|
| 701-01-E |
cross drain pipe (12" rcp)
|
50   |
LNFT |
75.00 |
3,750.00 |
80.00 |
4,000.00 |
1,311.00 |
65,550.00 |
|
|
| 701-01-F |
cross drain pipe (15" rcp)
|
120   |
LNFT |
83.00 |
9,960.00 |
85.00 |
10,200.00 |
3,030.00 |
363,600.00 |
|
|
| 701-01-G |
cross drain pipe (18" rcp)
|
8   |
LNFT |
89.00 |
712.00 |
90.00 |
720.00 |
1,958.00 |
15,664.00 |
|
|
| 701-01-I |
cross drain pipe (24" rcp)
|
32   |
LNFT |
92.00 |
2,944.00 |
105.00 |
3,360.00 |
2,423.00 |
77,536.00 |
|
|
| 701-07-B |
yard drain pipe (6" pvc)
|
40   |
LNFT |
25.00 |
1,000.00 |
45.00 |
1,800.00 |
1,074.00 |
42,960.00 |
|
|
| 701-07-C |
yard drain pipe (8" pvc)
|
8   |
LNFT |
30.00 |
240.00 |
50.00 |
400.00 |
218.00 |
1,744.00 |
|
|
| 701-15 |
concrete collar
|
10   |
EACH |
500.00 |
5,000.00 |
350.00 |
3,500.00 |
1,764.00 |
17,640.00 |
|
|
| 702-02-B |
manholes (r-cb-11)
|
4   |
EACH |
2,500.00 |
10,000.00 |
3,000.00 |
12,000.00 |
1,518.00 |
6,072.00 |
|
|
| 702-04-A |
adjusting manholes
|
3   |
EACH |
500.00 |
1,500.00 |
1,200.00 |
3,600.00 |
2,825.00 |
8,475.00 |
|
|
| 706-01-A |
concrete walk (4" thick)
|
4,732.4 |
SQYD |
55.00 |
260,282.00 |
47.50 |
224,789.00 |
337,944.00 |
1,599,286,185.60 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
499.1 |
SQYD |
65.00 |
32,441.50 |
90.50 |
45,168.55 |
33,075.00 |
16,507,732.50 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
12,500.00 |
12,500.00 |
8,200.00 |
8,200.00 |
3,528.00 |
3,528.00 |
|
|
| 717-01 |
seeding
|
120   |
LB |
20.00 |
2,400.00 |
12.00 |
1,440.00 |
1,588.00 |
190,560.00 |
|
|
| 718-01 |
fertilizer
|
4,000   |
LB |
0.25 |
1,000.00 |
0.50 |
2,000.00 |
2,352.00 |
9,408,000.00 |
|
|
| 726-01 |
bedding material
|
24.6 |
CUYD |
75.00 |
1,845.00 |
150.00 |
3,690.00 |
3,505.00 |
86,223.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
25,000.00 |
25,000.00 |
33,500.00 |
33,500.00 |
1,683.00 |
1,683.00 |
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
1,581   |
LNFT |
5.00 |
7,905.00 |
6.75 |
10,671.75 |
13,943.00 |
22,043,883.00 |
|
|
| 735-01 |
mailboxes
|
6   |
EACH |
50.00 |
300.00 |
80.00 |
480.00 |
662.00 |
3,972.00 |
|
|
| 735-02 |
mailbox supports (single)
|
6   |
EACH |
150.00 |
900.00 |
100.00 |
600.00 |
635.00 |
3,810.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
2,500.00 |
2,500.00 |
8,800.00 |
8,800.00 |
2,004.00 |
2,004.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
1,000.00 |
1,000.00 |
4,200.00 |
4,200.00 |
13,230.00 |
13,230.00 |
|
|
| S-001 |
adaag detectable warnings, 24" x 48" truncated dome
surfacing |
485   |
SQFT |
29.00 |
14,065.00 |
31.75 |
15,398.75 |
3,307.00 |
1,603,895.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
415,744.50 |
|
463,493.05 |
|
1,649,831,597.10 |
|
|
|