Letting of 6/27/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 451-01-0118
Parish: CADDO
Routes: I-20
Description: MONKHOUSE TO US 79
Type Const: traffic signing, and related work.
Estimated Construction Cost: $527,979.00
 
RankLicenseBidderConstruction Bid
1 34068 ALPHA SERVICE AND PRODUCTS, INC. $421,915.80
2 38764 ATWOOD FENCE COMPANY INC. $505,250.30
3 27043 JACK B. HARPER CONTRACTOR, INC. $587,862.69
4 23811 UNITED RENTALS HWY TECHNOLOGIES INC $699,139.70
 
Item Number Item Description Quantity Unit of Measure - 1 -
ALPHA SERVICE AND PRODUCTS, INC.
- 2 -
ATWOOD FENCE COMPANY INC.
- 3 -
JACK B. HARPER CONTRACTOR, INC.
- 4 -
UNITED RENTALS HWY TECHNOLOGIES INC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-I removal of existing signs 247      EACH 60.00 14,820.00 55.00 13,585.00 121.50 30,010.50 100.00 24,700.00
202-02-J removal of existing sign supports 97      EACH 175.00 16,975.00 125.00 12,125.00 270.00 26,190.00 500.00 48,500.00
706-03-C incidental concrete paving (6" thick) 25.2    SQYD 60.00 1,512.00 60.00 1,512.00 70.20 1,769.04 125.00 3,150.00
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 12,500.00 12,500.00 37,250.00 37,250.00 2,500.00 2,500.00
727-01 mobilization lump      LUMP 20,000.00 20,000.00 40,000.00 40,000.00 57,250.00 57,250.00 50,000.00 50,000.00
729-01 sign(type a) 1,569.0    SQFT 17.00 26,673.00 19.00 29,811.00 17.00 26,673.00 20.00 31,380.00
729-02 sign (type b) 133.2    SQFT 24.00 3,196.80 19.00 2,530.80 17.00 2,264.40 21.00 2,797.20
729-04 sign (type d) 1,706.5    SQFT 20.00 34,130.00 24.00 40,956.00 18.90 32,252.85 25.00 42,662.50
729-05 sign (type e) 432.0    SQFT 25.00 10,800.00 24.00 10,368.00 22.95 9,914.40 40.00 17,280.00
729-06 sign (overhead mounted) 4,450.5    SQFT 18.00 80,109.00 25.00 111,262.50 23.00 102,361.50 40.00 178,020.00
729-08-A mounting (2 1/2" post) 57      EACH 650.00 37,050.00 650.00 37,050.00 540.00 30,780.00 1,000.00 57,000.00
729-08-B mounting (3 1/2" post) 5      EACH 750.00 3,750.00 800.00 4,000.00 675.00 3,375.00 1,250.00 6,250.00
729-08-B-01 mounting (3 1/2" post on barrier) 4      EACH 650.00 2,600.00 825.00 3,300.00 810.00 3,240.00 1,300.00 5,200.00
729-08-E mounting (s3 x 5.7 post) 4      EACH 725.00 2,900.00 675.00 2,700.00 675.00 2,700.00 1,500.00 6,000.00
729-08-F mounting (w6 x 12 post) 82      EACH 850.00 69,700.00 900.00 73,800.00 810.00 66,420.00 1,750.00 143,500.00
729-08-G mounting (w8 x 18 post) 8      EACH 1,200.00 9,600.00 1,200.00 9,600.00 1,350.00 10,800.00 2,000.00 16,000.00
729-13 mounting(bridge fascia mount) 1      EACH 5,700.00 5,700.00 9,000.00 9,000.00 6,750.00 6,750.00 5,000.00 5,000.00
729-17 milepost assembly(ground mounted) 6      EACH 125.00 750.00 125.00 750.00 87.75 526.50 80.00 480.00
729-18 milepost assembly(structure mounted) 2      EACH 125.00 250.00 200.00 400.00 87.75 175.50 160.00 320.00
740-01 construction layout lump      LUMP 10,000.00 10,000.00 10,000.00 10,000.00 13,500.00 13,500.00 2,500.00 2,500.00
744-01 traffic control management lump      LUMP 10,000.00 10,000.00 16,500.00 16,500.00 16,200.00 16,200.00 2,500.00 2,500.00
S-001 dynamic message sign unit 2      EACH 4,000.00 8,000.00 8,500.00 17,000.00 20,250.00 40,500.00 5,000.00 10,000.00
S-002 mounting(aluminum tee supports,vertical
support,brackets and u-bolts)
62      PERH 700.00 43,400.00 750.00 46,500.00 1,080.00 66,960.00 700.00 43,400.00
                       
 CONTRACTOR TOTAL       421,915.80   505,250.30   587,862.69   699,139.70